ALUMINIUM CABLE DUCTS
Indian Air Force
JALANDHAR, PUNJAB
Bid Publish Date
19-Nov-2025, 3:34 pm
Bid End Date
04-Dec-2025, 4:00 pm
Location
Progress
Quantity
5
The tender is issued for the supply of underframe cable routing and its duct/tray arrangement with AL conduit, as per IFC drawings SPICAC-7-1-001-COL-I and SPICAC-7-1-002. Located in BHOPAL, MADHYA PRADESH (462001), the project involves Lot 1 with 5 units and a delivery window of up to 84 days (12 weeks). The procurement context includes OEM certification, Make in India compliance, and MSE/UDYAM declarations, with inspection at BHEL Bhopal. The award favors vendors capable of end-to-end installation support and post-sales service within India. The quoted price must include GST and other charges; 30-month warranty applies post-acceptance at site.
Product: UNDERFRAME CABLE ROUTING AND ITS DUCT/TRAY ARRANGEMENT (AL CONDUIT)
Drawings: SPICAC-7-1-001-COL-I (2 sheets) and SPICAC-7-1-002 (1 sheet)
Lot Qty: 5 units; Delivery: 84 days
Warranty: 30 months from final acceptance
Inspection: at BHEL Bhopal; GST/Other charges included in quoted price
Delivery within 84 days, with possible early delivery subject to BHEL confirmation
100% payment within 90 days after material receipt and acceptance (MSE 45 days; Medium 60 days)
Warranty: 30 months; OEM certificates required at time of delivery
MSE/UDYAM Make in India declarations required for eligibility
Inspection at BHEL Bhopal; drawings must be complied with exactly
100% payment within 90 days of receipt/acceptance; 45 days for MSE, 60 days for medium enterprises per relevant act; documents must be accepted by BHEL
Lot 1 quantity of 5 units with tentative delivery 84 days; early delivery allowed subject to BHEL confirmation
30 months warranty from date of supply/installation; OEM warranty certificates to be submitted at delivery; service centers must be established in India
Must hold OEM certificate for supplied items
MSE/UDYAM declarations where applicable
Make in India declaration signed and sealed
Tender Category
Goods
Bid To RA
No
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Air Force
JALANDHAR, PUNJAB
Bharat Heavy Electricals Limited
BENGALURU URBAN, KARNATAKA
N/A
CHENNAI, TAMIL NADU
N/A
BEGUSARAI, BIHAR
N/A
VADODARA, GUJARAT
Tender Results
Loading results...
OEM Certificate
MSE declaration / UDYAM Certificate (if applicable)
Compliance to technical specification (duly filled, signed & sealed)
Compliance to drawings / seller’s drawings
Compliance of Commercial Terms & ATC (signed & sealed)
Make in India Declaration (formatted, signed & sealed)
Extended Deadline
04-Dec-2025, 4:00 pm
Opening Date
04-Dec-2025, 4:30 pm
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | MDM ENGINEERING AND TECHNOLOGIES Under PMA | Make : OEM Model : UNDERFRAME CABLE ROUTING AND IT'S DUCT/TRAY ARRANG Title : UNDERFRAME CABLE ROUTING AND IT'S DUCT/TRAY ARRANGEMENT (ALONG WITH AL CONDUIT) AS PER ICF DRAWING S | 28-11-2025 13:12:35 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | MDM ENGINEERING AND TECHNOLOGIES(MII) Under PMA | Item Categories : UNDERFRAME CABLE ROUTING AND IT'S DUCT/TRAY ARRANGEMENT (ALONG WITH AL CONDUIT) AS PER ICF DRAWING |
Please sign in or create an account to view contract details and download result documents.
Key insights about MADHYA PRADESH tender market
Bidders must submit OEM certificates, MSE/UDYAM declarations, Make in India declaration, and compliance to SPICAC drawings SPICAC-7-1-001-COL-I and SPICAC-7-1-002. Include signed Commercial Terms & ATC and comply with GST. Delivery is 84 days, with 90-day payment terms.
Required documents include OEM certificate, MSE declaration, UDYAM certificate if applicable, compliance to technical specifications, drawings compliance, signed ATC, and Make in India declaration. All documents must be sealed and signed with official stamp.
Delivery window for Lot 1 is 84 days (12 weeks) from order date, with early delivery possible subject to BHEL confirmation. Ensure readiness of conduit assembly per SPICAC drawings for timely acceptance.
Payment is 100% within 90 days of material receipt and acceptance, with 45 days for MSE and 60 days for medium enterprises per applicable act; payment conditional on document acceptance by BHEL.
A 30-month warranty starts from final acceptance or upon installation completion. OEM warranty certificates must be provided at delivery, and the supplier must ensure post-sale service availability across India.
Yes. Bidders must submit Make in India declaration and UDYAM certificate if applicable to satisfy eligibility criteria; these declarations must be signed and sealed and accompany the bid submission.
Inspection is conducted at BHEL Bhopal. Compliance to SPICAC drawings and OEM certificates must be verified on site; ensure installation and testing or commissioning steps are ready for review.
The item description follows IFC drawings SPICAC-7-1-001-COL-I (2 sheets) and SPICAC-7-1-002 (1 sheet); bidders must align design, routing and duct/tray arrangements with these drawings.
PHE
📍 JAMMU, JAMMU AND KASHMIR
Mishra Dhatu Nigam Limited (midhani)
📍 HYDERABAD, TELANGANA
TNEB Limited
📍 CHENNAI, TAMIL NADU
Bhabha Atomic Research Centre
📍 CHENGALPATTU, TAMIL NADU
Sign up now to access all documents
Main Document
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS