Progress

Issue21-Apr-2026, 7:55 pm
Technical05-Jun-2026, 1:47 pm
Financial
AwardCompleted

Tender Overview

The competition is issued by the Irrigation And Water Resources Department, Uttar Pradesh through the Tubewell Division for procurement related to a DG set 62.5 KVA and an Earthing Plate. The location is LUCKNOW, UTTAR PRADESH 226001. Tender details show a flexible quantity clause allowing up to 25% increase in ordered quantity and extended delivery time calculated as (Increase/Original) × Original delivery period, with a minimum of 30 days. The procurement scope is constrained to local state operations, with no BOQ items listed. The emphasis is on compliant supply of standby power equipment and earthing components under state procurement norms. A key differentiator is the quantity-flexibility clause and supplier readiness to align with ATC terms already uploaded by the buyer.

Technical Specifications & Requirements

  • Product category: DG set 62.5 KVA and Earthing Plate (category aligned to power generation and earthing hardware)
  • Delivery flexibility: 25% optional quantity increment during contract and currency; time adjustment rules apply
  • Standards/Compliance: Not specified in available data; bidders should prepare to meet common IS/IEC compliance per state tender norms where applicable
  • Documentation readiness: Prepare for submission of typical bid documents and any OEM authorizations if required by the ATC; no explicit BOQ values
  • Context: Tender originates from the Tubewell Division under the Uttar Pradesh Irrigation Department to support energy/electrical reliability for irrigation infrastructure
  • Key risk/assumption: Absence of explicit technical specs requires bidders to rely on standard DG set 62.5 KVA configurations and standard earthing plate specifications, ensuring compatibility with local electrical codes

Terms, Conditions & Eligibility

  • Quantity variation: Purchaser may increase/decrease order quantity up to 25% at contracted rates
  • Delivery timeline: Based on last date of original delivery order; extended time calculated per option clause with minimum 30 days
  • ATC/terms adherence: Bidders must comply with the option clause and associated delivery calculations
  • Documentation readiness: Prepare typical bid submission papers; OEM authorizations may be required per ATC
  • Warranties/penalties: Not explicitly stated in data; bidders should verify at bid stage
  • Location relevance: Tender is centered on Lucknow, UP procurement for state irrigation needs; confirm local supplier capabilities

Key Specifications

  • Product/service names: DG set 62.5 KVA and Earthing Plate

  • Quantities: Not disclosed in BOQ; quantity adjustment up to 25% allowed

  • Estimated value: Not provided

  • Experience: Not specified; bidders should demonstrate capacity for power equipment supply

  • Quality/compliance: Standards not explicitly listed in tender text; bidders should align with local IS/IEC norms

  • Delivery: Extended delivery period rules apply; minimum 30 days for added quantity

  • Warranty/AMC: Not specified; verify in ATC/terms

Terms & Conditions

  • Option Clause allows +/- 25% quantity adjustment during contract execution

  • Delivery period starts from the last date of the original delivery order with minimum 30 days for extended delivery

  • ATC document uploaded; bidders must review and comply with buyer-specific terms

Important Clauses

Payment Terms

Not specified in data; verify in ATC and final tender documents; expect standard seller terms per UP procurement

Delivery Schedule

Delivery period commences from the last date of original delivery order; extended period based on option clause with minimum 30 days

Penalties/Liquidated Damages

Not detailed in current data; bidders must examine ATC for LD provisions or performance bonds

Bidder Eligibility

  • Experience in supplying DG sets or electrical equipment of similar scale

  • Financial capability demonstrated via annual turnover suitable to bid value

  • Compliance with local electrical codes and IS/IEC standards as applicable

Advertisement

Technical Results

S.No Seller Item Date Status
1
ELITE GROUP   Under PMA
Make : NA Model : DG SETQ Title : DG set 62.5 KVA06-05-2026 19:17:56
2
ORCHID SUPPLIERS   Under PMA
Make : Unbrand Model : DG SET Title : DG set 62.5 KVA06-05-2026 19:52:47
3
SKYLINE POWER SOLUTIONS   Under PMA
Make : Swadeshi WhisPower Model : Escorts G62.5 Title : DG set 62.5 KVA06-05-2026 15:01:16

Financial Results

Rank Seller Price Item
L1
ORCHID SUPPLIERS   Under PMA
Item Categories : DG set 62.5 KVA,Earthing Plate
L2
ELITE GROUP   Under PMA
Item Categories : DG set 62.5 KVA,Earthing Plate

Tender Data

Bid Details

Quantity

2

Category

Earthing Plate

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Requirements

Min. Avg. Annual Turnover

2

Past Performance

30 %

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

DG set 62.5 KVA , Earthing Plate

Authority Records

IRRIGATION AND WATER RESOURCES DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9244145.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Corrigendum Updates

1 Update
#1

Update

07-May-2026

Extended Deadline

11-May-2026, 3:30 am

Opening Date

11-May-2026, 4:00 am

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates of similar DG set supply or earthing plate projects

4

Financial statements (profit & loss, balance sheet) for last 2-3 years

5

EMD submission proof (as applicable in final terms)

6

Technical bid documents and compliance sheets

7

OEM authorization letters (if required by ATC)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for the DG set 62.5 KVA tender in Lucknow UP?

Bidders should submit GST, PAN, experience proofs, financial statements, EMD proof, and OEM authorizations if required by ATC. Ensure compliance with the option clause for quantity adjustments up to 25% and prepare for delivery timeline rules starting from the original order date. Review the uploaded ATC for any additional forms.

What documents are required for the earthing plate procurement in UP?

Required documents typically include GST certificate, PAN, company/firm registration, experience certificates for similar projects, financial statements, bid compliance sheets, and OEM authorizations. Ensure the technical bid addresses earthing plate standards and tie-in with the 62.5 KVA DG set if integrated.

What are the delivery time rules for quantity variations in this tender?

Delivery time adjusts with the option clause: additional time = (Increase/Original) × Original delivery period, with a minimum of 30 days. The Purchaser may extend this up to the original delivery period while exercising the option. Plan contingencies for up to 25% quantity changes.

Are there any specific standards or certifications required for the DG set in this bidding?

Explicit standards are not listed in the current data; bidders should align with IS/IEC norms applicable to power equipment in UP government tenders and confirm via the ATC. Prepare compliance statements for common DG set performance and safety standards.

What is the eligibility criterion for experience and turnover in this UP tender?

The tender data does not specify exact years or turnover; bidders should demonstrate prior supply of DG sets or electrical equipment and provide financial statements showing stability. Verify exact eligibility in the ATC and future corrigenda from the Tubewell Division.

What is the role of the ATC document uploaded by the buyer?

The ATC document contains bidder-specific terms, the evaluation criteria, and any additional submission requirements beyond the base tender. Review it to ensure accurate compliance, including any OEM authorizations, special product specs, or delivery conditions.

How will price adjustments be handled for the optional quantity increase?

Prices will remain at contracted rates for up to 25% additional quantity during the currency of the contract. Ensure the bid explicitly states unit prices, extended quantities, and any impact on freight or installation costs as per ATC.

What is the procurement focus of this Lucknow tender for UP irrigation?

The focus is on supplying a DG set of 62.5 KVA and an Earthing Plate for irrigation infrastructure support. Emphasis on timely delivery, adherence to option-quantity rules, and compliance with buyer-specific ATC terms is essential for bid success.

Advertisement