TenderDekho Logo
Active GEM

Office Of Dg R & D (R & M) Security Equipment Tender Delhi 2026 – IS/DM Standards, EMD ₹280000, 3 Years Experience

Bid Publish Date

01-Oct-2026, 8:03 pm

Bid End Date

19-Oct-2026, 8:00 pm

EMD

₹2,80,000

Value

₹94,55,217

Generate Docs

Progress

Issue01-Oct-2026, 8:03 pm
Corrigendum09-Oct-2026
AwardPending

Tender Overview

The Office Of Dg R & D (R & M) under the Department Of Defence Research & Development invites bids for security equipment procurement with an estimated value of ₹9,455,217 and an EMD of ₹280,000. The project location is Delhi Cantt, Shankar Vihar, Rao Tula Ram Marg, Delhi. Scope emphasizes equipment supply with option to adjust quantities by up to 25% during contract and extended periods under the clause. Bidders must be prepared to submit Detailed Design Drawings within 7 days of award and accommodate modifications requested by the Buyer, with potential delivery timeline adjustments if approvals lag. The BOQ contains 99 items, though item specifics are not disclosed here, signaling a broad security equipment installation/maintenance package. A key differentiator is the mandatory compliance with Buyer-specified drawing approval and design finalization prior to fabrication. This tender targets experienced government suppliers with proven central/state government experience and prior contracts supporting similar product lines. Unique aspects include the option clause on quantity, and the requirement to align with buyer-approved Detailed Design Drawings.

Technical Specifications & Requirements

  • No explicit technical specifications are published in the data; emphasis lies on process and eligibility. Expected elements include: submission of Detailed Design Drawings within 7 days, approval cycle from Buyer within 7 days, and supply of conforming items per approved drawings. Category appears to involve security equipment for government use. Estimated value signals a mid-scale procurement; EMD is ₹280,000. Experience requirement states 3+ years of regular manufacture and supply to central/state government or PSU entities. Delivery location is Delhi Cantt, with potential installation scope.
  • Required pre-qualification may include: PAN, GSTIN, cancelled cheque, EFT mandate, and vendor-code readiness.
  • The possible engagement includes post-award design validation, adherence to supplier performance timelines, and the option to extend quantities at contracted rates. Compliance with GST as applicable is expected.

Terms, Conditions & Eligibility

  • EMD: ₹280,000; must be provided with bid.
  • Experience: 3+ years in supplying similar category products to central/state govt or PSU; provide contract copies.
  • Delivery/Drawings: Submit Detailed Design Drawings within 7 days of award; modifications provided within 7 days; supply per approved drawings.
  • GST: Bidder to account for GST; reimbursement as per actuals or applicable rates, capped by quoted GST percentage.
  • Documents: PAN, GSTIN, cancelled cheque, EFT mandate; vendor-code creation prerequisites.
  • Quantity Clause: Option to increase quantity up to 25% of bid/contract quantity; extended delivery time calculated with a minimum of 30 days.
  • Delivery Location: CCE R AND D Central Development Enclave, Shankar Vihar, Rao Tula Ram Marg, Delhi Cantt.
  • Acceptance: Bidder not under liquidation or similar proceedings; bid Undertaking required.

Key Specifications

  • EMD amount: ₹280,000

  • Estimated value: ₹9,455,217

  • Delivery location: Delhi Cantt, CCE R AND D Central Development Enclave, Shankar Vihar, Rao Tula Ram Marg

  • Number of BOQ items: 99

  • Required drawings: Detailed Design Drawings within 7 days of award

  • Approval timeline: Approved or modification list within 7 days

Terms & Conditions

  • Delivery quantity may increase up to 25% during contract at contracted rates

  • Submit Detailed Design Drawings within 7 days of award; drawings approved or list of modifications within 7 days

  • GST treatment as per applicable rates; bidder to bear GST unless reimbursement limits apply

Important Clauses

Payment Terms

GST reimbursement limited to actuals or applicable rates, whichever is lower; payment terms not explicitly stated beyond GST handling

Delivery Schedule

Delivery period linked to approval of drawings; extended delivery time formula ties to increased quantity and original delivery period, minimum 30 days

Penalties/Liquidated Damages

LDs not specified in data; delivery delays tied to drawing approvals may adjust delivery timelines without LDs

Bidder Eligibility

  • 3+ years of regular manufacturing and supply to Central/State Govt or PSU

  • Not under liquidation or court receivership

  • GST registration and PAN validity

Advertisement

Tender Data

Bid Details

Quantity

2438

Category

SUPPLY AND PLACING THREE SEATER SOFA

Bid Type

Two Packet Bid

Bid Validity

95 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Advisory Bank

State Bank of India

Delivery Details

Max Delivery Days

35

Delivery Locations

1

Delivery Cities

SOUTH DELHI

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-SOUTH DELHISOUTH DELHI--635-

Authority Records

MINISTRY OF DEFENCEDEFENCE RESEARCH & DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9975570.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Office Of Dg R & D (r & M)

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

09-Oct-2026

Extended Deadline

19-Oct-2026, 2:30 pm

Opening Date

20-Oct-2026, 2:30 pm

Advertisement

Bill of Quantities (BOQ) 99 Items Sign in for GEM prices

#1

Supply and placing of Bunkbed

spec attached

6 pieces Delivery: 35 days
#2

Supply and placing of Double bed

spec attached

8 pieces Delivery: 35 days
#3

Supply and placing single seater sofa

spec attached

6 pieces Delivery: 35 days
#4

Supply and placing two seater sofa

spec attached

7 pieces Delivery: 35 days
#5

SUPPLY AND PLACING THREE SEATER SOFA

spec attached

4 pieces Delivery: 35 days
#6

SUPPLY AND PLACING OF DINNING TABLE

spec attached

4 pieces Delivery: 35 days
#7

SUPPLY AND PLACING OF CAF CHAIR

spec attached

16 pieces Delivery: 35 days
#8

SUPPLY AND PLACING IN POSITION OF KITCHEN CABINET

spec attached

4 pieces Delivery: 35 days
#9

SUPPLY AND PLACING OF CENTRE TABLE

spec attached

4 pieces Delivery: 35 days
#10

SUPPLY AND PLACING OF CORNER TABLE

spec attached

6 pieces Delivery: 35 days
#11

SUPPLY AND PLACING OF REVOLVING HIGH BACK CHAIR

spec attached

4 pieces Delivery: 35 days
#12

SUPPLY AND PLACING OF VISITOR CHAIR

spec attached

12 pieces Delivery: 35 days
#13

SUPPLY AND PLACING OF MID BACK CHAIR

spec attached

27 pieces Delivery: 35 days
#14

SUPPLY PLACING AND INSTALLATION OF SIDE BY SIDE REFRIGERATOR

spec attached

1 pieces Delivery: 35 days
#15

SUPPLY AND PLACING OF STUDY TABLE

spec attached

3 pieces Delivery: 35 days
#16

SUPPLY AND PLACING OF STUDY TABLE CHAIR

spec attached

3 pieces Delivery: 35 days
#17

SUPPLY OF BUNK BED MATTRESS SINGLE

spec attached

26 pieces Delivery: 35 days
#18

SUPPLY OF BUNK BED MATTRESS DOUBLE

spec attached

5 pieces Delivery: 35 days
#19

SUPPLY AND PLACING OF SINGLE BED

spec attached

2 pieces Delivery: 35 days
#20

SUPPLY AND PLACING OF WORK STATION

spec attached

2 pieces Delivery: 35 days
#21

SUPPLY AND PLACING OF WOODEN PEDESTAL

spec attached

2 pieces Delivery: 35 days
#22

SUPPLY OF WARDROBE

spec attached

1 pieces Delivery: 35 days
#23

SUPPLY AND PLACING OF STEEL ALMIRAH

spec attached

2 pieces Delivery: 35 days
#24

SUPPLY AND PLACING OF CROCKERY SHELF

spec attached

3 pieces Delivery: 35 days
#25

SUPPLY OF METAL SHELF

spec attached

2 pieces Delivery: 35 days
#26

SUPPLY OF HEAVY DUTY RECTANGULAR COIRDOOR MAT

spec attached

2 pieces Delivery: 35 days
#27

SUPPLY OF STEEL PEDAL DUSTBIN

spec attached

30 pieces Delivery: 35 days
#28

SUPPLY AND FIXING OF PREMIUM BLACKOUT CURTAIN

spec attached

146 pieces Delivery: 35 days
#29

SUPPLY AND FIXING OF SS PIPES WITH END CAPS

spec attached

146 pieces Delivery: 35 days
#30

SUPPLY OF 80 L DESSERT COOLER

spec attached

10 pieces Delivery: 35 days
#31

SUPPLY OF 80 LTR BLUE STAR WATER COOLER

spec attached

10 pieces Delivery: 35 days
#32

SUPPLY OF AQUA GUARD 500 LPH RO PLANT

spec attached

1 pieces Delivery: 35 days
#33

SUPPLY OF 3 STAR CONVERTIBLE REFRIGERATOR

spec attached

2 pieces Delivery: 35 days
#34

SUPPLY OF LATEX PILLOW

spec attached

40 pieces Delivery: 35 days
#35

SUPPLY INSTALLATION TESTING AND COMMISSIONING OF 2TR AC

spec attached

1 pieces Delivery: 35 days
#36

SUPPLY INSTALLATION TESTING AND COMMISSIONING OF 1.5 TR AC

spec attached

5 pieces Delivery: 35 days
#37

SUPPLY OF WASHING MACHINE 9-10 KG

spec attached

1 pieces Delivery: 35 days
#38

PROVIDING AND FIXING OF GEYSER 25 LTR

spec attached

12 pieces Delivery: 35 days
#39

SUPPLY OF DINNER PLATES

spec attached

200 pieces Delivery: 35 days
#40

SUPPLY OF QTR PLATE

spec attached

100 pieces Delivery: 35 days
#41

SUPPLY OF CURRY BOWL

spec attached

200 pieces Delivery: 35 days
#42

SUPPLY OF SOUP BOWL

spec attached

100 pieces Delivery: 35 days
#43

SUPPLY OF SOUP SPOON

spec attached

100 pieces Delivery: 35 days
#44

SUPPLY OF DESSERT SPOON

spec attached

200 pieces Delivery: 35 days
#45

SUPPLY OF FORK SPOON

spec attached

100 pieces Delivery: 35 days
#46

SUPPLY OF BUTTER SPOON

spec attached

25 pieces Delivery: 35 days
#47

SUPPLY OF BUTTER KNIFE

spec attached

10 pieces Delivery: 35 days
#48

SUPPLY OF TEA SPOON

spec attached

24 pieces Delivery: 35 days
#49

SUPPLY OF CUP AND SAUCER

spec attached

24 pieces Delivery: 35 days
#50

SUPPLY OF ROTI SERVING SPOON

spec attached

4 pieces Delivery: 35 days
#51

SUPPLY OF RICE SERVING SPOON

spec attached

15 pieces Delivery: 35 days
#52

SUPPLY OF PICKLE CONTAINER SET

spec attached

6 pieces Delivery: 35 days
#53

SUPPLY OF SUGAR CONTAINER WITH NAPKEEN HOLDER

spec attached

10 pieces Delivery: 35 days
#54

SUPPLY OF RICE SERVICE PLATE

spec attached

2 pieces Delivery: 35 days
#55

SUPPLY OF HOT CASSEROLE SMALL

spec attached

4 pieces Delivery: 35 days
#56

SUPPLY OF HOT CASSEROLE MEDIUM

spec attached

4 pieces Delivery: 35 days
#57

SUPPLY OF HOT CASSEROLE BIG

spec attached

4 pieces Delivery: 35 days
#58

SUPPLY OF IDLI MAKER 24 PIECE

spec attached

3 pieces Delivery: 35 days
#59

SUPPLY OF DOSA TAWA WITH BURNER

spec attached

1 pieces Delivery: 35 days
#60

SUPPLY OF WATER JUG

spec attached

5 pieces Delivery: 35 days
#61

SUPPLY OF ELECTRIC IRON

spec attached

1 pieces Delivery: 35 days
#62

SUPPLY OF TEA POT

spec attached

5 pieces Delivery: 35 days
#63

SUPPLY OF WATER GLASS MEDIUM

spec attached

100 pieces Delivery: 35 days
#64

SUPPLY OF WATER GLASS LARGE

spec attached

100 pieces Delivery: 35 days
#65

SUPPLY OF TABLE MAT

spec attached

40 pieces Delivery: 35 days
#66

SUPPLY OF WATER JUG 1.5 LTR

spec attached

5 pieces Delivery: 35 days
#67

SUPPLY OF ELECTRIC KETTLE 1.8 LTR

spec attached

4 pieces Delivery: 35 days
#68

SUPPLY OF BOWL FOR SWEETS

spec attached

12 pieces Delivery: 35 days
#69

SUPPLY OF SAUNF BOX

spec attached

3 pieces Delivery: 35 days
#70

SUPPLY OF MICROWAVE OVEN 30 LTR

spec attached

2 pieces Delivery: 35 days
#71

SUPPLY OF FRY PAN BIG

spec attached

4 pieces Delivery: 35 days
#72

SUPPLY OF GAS STOVE 2 BURNER

spec attached

2 pieces Delivery: 35 days
#73

SUPPLY OF BATHROOM MATS

spec attached

8 pieces Delivery: 35 days
#74

SUPPLY OF DOOR MATS

spec attached

20 pieces Delivery: 35 days
#75

SUPPLY OF DOOR MATS BIG SIZE

spec attached

15 pieces Delivery: 35 days
#76

SUPPLY OF BED SIDE RUG

spec attached

10 pieces Delivery: 35 days
#77

SUPPLY OF HANGER PLASTIC

spec attached

36 pieces Delivery: 35 days
#78

SUPPLY OF CLOTH STAND ALUMINIUM

spec attached

2 pieces Delivery: 35 days
#79

SUPPLY OF MUG PLASTIC 1.5 LTR

spec attached

5 pieces Delivery: 35 days
#80

SUPPLY OF BATH TOWEL BIG

spec attached

30 pieces Delivery: 35 days
#81

SUPPLY OF BED SHEET DOUBLE BED

spec attached

30 pieces Delivery: 35 days
#82

SUPPLY OF BED SHEET SINGLE BED

spec attached

30 pieces Delivery: 35 days
#83

SUPPLY OF HAND TOWEL

spec attached

30 pieces Delivery: 35 days
#84

SUPPLY OF BED COVER DOUBLE BED

spec attached

24 pieces Delivery: 35 days
#85

SUPPLY OF BED QUILT SINGLE BED

spec attached

4 pieces Delivery: 35 days
#86

SUPPLY OF BED QUILT DOUBLE BED

spec attached

6 pieces Delivery: 35 days
#87

SUPPLY OF TABLE LAMP LED

spec attached

5 pieces Delivery: 35 days
#88

SUPPLY OF EMERGENCY LIGHT LED

spec attached

8 pieces Delivery: 35 days
#89

SUPPLY OF ROOM HEATER CONVECTOR 2000 W

spec attached

8 pieces Delivery: 35 days
#90

SUPPLY OF TOASTER FOR SANDWICH

spec attached

2 pieces Delivery: 35 days
#91

SUPPLY OF TOASTER FOR BREAD

spec attached

1 pieces Delivery: 35 days
#92

SUPPLY OF INCUCTION PLATE 2100W

spec attached

2 pieces Delivery: 35 days
#93

SUPPLY OF EXTENSION BOARD

spec attached

12 pieces Delivery: 35 days
#94

SUPPLY OF ICE BUCKET

spec attached

1 pieces Delivery: 35 days
#95

SUPPLY OF ICE TONG

spec attached

2 pieces Delivery: 35 days
#96

SUPPLY OF COASTER

spec attached

8 pieces Delivery: 35 days
#97

SUPPLY OF KEY HOLDER

spec attached

1 pieces Delivery: 35 days
#98

SUPPLY OF NOTICE BOARD

spec attached

1 pieces Delivery: 35 days
#99

SUPPLY OF 12 V 150 AH BATTERIES WITH UPS MODULES

spec attached

152 pieces Delivery: 35 days

Categories 60

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

Experience certificates showing 3+ years of supply to Central/State Govt/PSU

6

Contract copies for similar products

7

GST compliance statement

8

Vendor Code Creation documents

Frequently Asked Questions

Key insights about DELHI tender market

How to bid for security equipment tender in Delhi Cantt 2026?

Bidders must meet eligibility: 3+ years govt/PSU supply experience, provide PAN, GSTIN, EFT mandate, cancelled cheque, and vendor-code documents. Submit Detailed Design Drawings within 7 days of award and obtain buyer approval within 7 days. Include EMD of ₹280,000 and ensure GST compliance per rates.

What documents are required for tender participation in Delhi?

Required documents include PAN Card copy, GSTIN copy, Cancelled Cheque, EFT Mandate certified by bank, and experience certificates showing at least 3 years of relevant government contracts. Also provide contract copies for similar products and GST compliance statement.

What is the EMD amount for the defence research tender in Delhi Cantt?

The EMD amount is ₹280,000. Bid submission must include this amount via the specified instrument. EMD ensures bid seriousness and enables bid withdrawal penalties if terms are not met.

What are the delivery terms for this DRDO tender in Delhi?

Delivery timelines depend on drawings approval. Submit Detailed Design Drawings within 7 days of award; approvals or modification lists provided within 7 days. If approval delays occur, the delivery period extends without LDs, calculated by (increased quantity/original quantity) × original period, minimum 30 days.

Which standards or certifications are required for security equipment bids in Delhi?

While explicit standards are not published, bidders should prepare to comply with ISI/ISI-marked or other government-endorsed specifications per security equipment norms. Ensure ISO 9001 or equivalent quality management evidence if requested and maintain vendor-grade documentation for central government projects.

How does quantity variation affect delivery and payments in this tender?

The purchaser may increase quantity up to 25% at contracted rates, affecting delivery time proportionally. The extension time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. Payments aligned to delivery milestones per contract terms.

Advertisement