Government Tender Published for Digester,Gas holder,Feeding shed and shredder,Hydraulic agitator,Moisture remover,Water line and ga in CHENNAI, TAMIL NADU

Bid Publish Date

18-May-2025, 2:15 pm

Bid End Date

17-Jun-2025, 11:00 am

Generate Docs

Progress

RA
Issue18-May-2025, 2:15 pm
Reverse AuctionCompleted
AwardCompleted
Explore all 5 tabs to view complete tender details

Quantity

15

Category

Digester

Bid Type

Two Packet Bid

Categories 54

Dg Of Defence Estate announces a tender for Digester, Gas holder, Feeding shed and shredder, Hydraulic agitator, Moisture remover, Water line and gas holder water socket, Electrical line, Generator, digester, Feeding shredder, Pipe line work in CHENNAI, TAMIL NADU. Quantity: 15. Submission Deadline: 17-06-2025 11: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Digester , Gas holder , Feeding shed and shredder , Hydraulic agitator , Moisture remover , Water line and gas holder water socket , Electrical line , Generator , digester , Feeding shredder , Pipe line work

Authority Records

MINISTRY OF DEFENCEDEFENCE DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-7852491.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Technical Specification/Buyer Specification Document

TECHNICAL

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

Digester

Re commission of 5meter dia and 2.5 meter height digester feeding inoculum and re-commission of digester painting digester inlet and outlet line block removal and check the flow line

1 pieces Delivery: 25 days
#2

Gas holder

Leakage test the digester 5 meter dia 1.25 meter height, lamination of top side digester by FRP material cleaning and painting the gas holder and after feeding the digester refixing the gas holder in digester check and painting gas holder and digester guide pipe.

1 pieces Delivery: 25 days
#3

Feeding shed and shredder

Remove the shredder and transport to our company remove worn out parts cutters bearing and motor and servicing, painting transporting and trial running.

1 pieces Delivery: 25 days
#4

Hydraulic agitator

Service, oil change for hydraulic power pack, hydro motor and recondition.

1 pieces Delivery: 25 days
#5

Moisture remover

Clean the moisture remover check for damage portion repair, service, re-fixing and painting

1 pieces Delivery: 25 days
#6

Water line and gas holder water socket

Cleaning the water socket around the digester remove damaged water pipe valve and fitting and re-connecting the 1inchupvc water line.

1 pieces Delivery: 25 days
#7

Electrical line

Remove the damaged wire starter and check the line and 2.5 sq mm 3 core wire 3 phase starter 440V, 12 Amp re connection to the shredder motor and hydraulic motor up to generator only output line from generator not included.

1 pieces Delivery: 25 days
#8

Generator

Change the battery, oil service, change required spares, gas line, self-motor and without engine reconditioning work service motor, extra.

1 pieces Delivery: 25 days
#9

digester

Re-commission of 4 meter dia and 2.5 meter height digester feeding inoculum and re-commission of digester painting digester inlet and outlet line block removal and check the flow line.

1 pieces Delivery: 25 days
#10

Gas holder

Dismantling 4 meter dia and 1.25 meter gas holder from digester, leakage test the digester, lamination of top side digester by FRP material cleaning and painting the gas holder and after feeding the digester re-fixing the gas holder in digester check and painting gas holder and digester guide pipe.

1 pieces Delivery: 25 days
#11

Feeding shredder

Remove the shredder and transport to supplier company remove worn out parts cutters bearing and motor and servicing, painting transporting and trial running.

1 pieces Delivery: 25 days
#12

Moisture remover

Clean the moisture remover check for damage portion repair, service, re-fixing and painting.

1 pieces Delivery: 25 days
#13

Water line and gas holder water socket

Cleaning the water socket around the digester remove damaged water pipe valve and fitting and re-connecting the 1 inch upvc water line.

1 pieces Delivery: 25 days
#14

Electrical line

Remove the damaged wire starter and check the line and 2.5 sq mm 3 core wire 3 phase starter 440V, 12 Amp re-connection to the shredder motor.

1 pieces Delivery: 25 days
#15

Pipe line work

Removed Damaged pipe line and fixing 1 inch UPVC Gas pipe line from gas holder to bio gas stove, upvc control valve, upvc fittings and M.S bio gas stove.

1 pieces Delivery: 25 days

Required Documents

1

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

2

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

2 Updates
#1

Update

10-Jun-2025
#2

Update

10-Jun-2025

Extended Deadline

17-Jun-2025, 11:00 am

Opening Date

17-Jun-2025, 11:30 am

Reverse Auction Schedule

Completed

Start

12-Jul-2025, 4:00 pm

End

16-Jul-2025, 11:00 am

Duration: 91 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
Arumugam Arivu Bio Energy   Under PMA
-16-06-2025 15:38:34
2
SRI VINAYAGA ENTERPRISES   Under PMA
-17-06-2025 02:30:02
3
SUNDARAM FAB PRIVATE LIMITED   Under PMA
-02-06-2025 17:34:15
4
SUNDARAM FABRICATORS   Under PMA
-16-06-2025 17:26:30

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1SUNDARAM FABRICATORS(MSE)   Under PMA Winner ₹7,84,200Item Categories : Digester,Gas holder,Feeding shed and shredder,Hydraulic agitator,Moisture remover,Water line and ga
L2SUNDARAM FAB PRIVATE LIMITED (MSE)   Under PMA₹8,06,530Item Categories : Digester,Gas holder,Feeding shed and shredder,Hydraulic agitator,Moisture remover,Water line and ga
L3Arumugam Arivu Bio Energy   Under PMA₹8,22,656Item Categories : Digester,Gas holder,Feeding shed and shredder,Hydraulic agitator,Moisture remover,Water line and ga

🎉 L1 Winner

SUNDARAM FABRICATORS(MSE)   Under PMA

Final Price: ₹7,84,200

Frequently Asked Questions

Key insights about TAMIL NADU tender market

What are the eligibility requirements for participation in the Bio Gas Plant Re Work tender?

The eligibility requirements include being a registered organization, possessing relevant experience in the bio gas industry, and demonstrating technical capability to execute the project successfully. Bidders should be able to provide documentation of previous similar project completions and possess a well-established financial history to ensure compliance.

What kinds of certificates are needed to apply for the Bio Gas Plant tender?

Bidders must submit required certificates including but not limited to business registration documents, or industry-specific certifications that prove their capability and compliance to execute projects involving bio gas facilities. Quality assurance certificates verifying operational standards are also essential.

What is the process for registration to participate in the Bio Gas Plant Re Work tender?

The registration process involves submitting a detailed application through the designated portal. Potential bidders must provide documentation including company registration details, financial statements, and technical qualifications. It is essential to ensure all information is accurate and captures the applicant's capacity to undertake the renovation of the bio gas plant.

What formats are accepted for document submissions in the Bio Gas Plant Re Work tender?

The accepted document formats for submissions include PDF and Word files. It is important to adhere to the specified submission guidelines to avoid disqualification. All bids should be clearly organized, ensuring that the technical proposal, financial data, and company information are thoroughly addressed.

What payment terms are applicable for the Bio Gas Plant Re Work tender?

Payment terms will be outlined in the contract, typically involving milestone payments based on project progress. Bidders should ensure that their pricing strategies are competitive and account for performance security requirements which will be stipulated in the tender, ensuring the successful execution of the project.