TenderDekho Logo
Closed GEM

Indian Army Department Of Military Affairs Vehicular Spare Parts Tender 2025 – Clutch Release Bearing, Lamps & Regulators, ISI/ISO Standards

Bid Publish Date

11-Nov-2025, 2:04 pm

Bid End Date

21-Nov-2025, 3:00 pm

Progress

Issue11-Nov-2025, 2:04 pm
Technical20-11-2025 22:15:41
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

155

Category

Clutch Release bearing

Bid Type

Two Packet Bid

Key Highlights

  • Brand/OEM requirements: Not specified in tender data
  • Technical certifications: Not specified in tender data
  • Special clauses: Quantity variation up to 25%; delivery extension calculations
  • Eligibility criteria: PAN, GSTIN, bank EFT mandate submission
  • Warranty/AMC: Not specified in tender data
  • Penalties/LD: Not specified in tender data
  • Delivery: Based on original/extended delivery period; minimum 30 days implied in calculation
  • Delivery location: Not specified; location field is blank in basic details

Categories 58

Tender Overview

The opportunity is issued by the Indian Army under the Department Of Military Affairs for procurement of a broad range of vehicular spare parts and assemblies, including items such as Clutch Release bearing, Tail/Head lamps, Regulator assemblies, Coolant pump, Fan belt, and related components. The BoQ lists 46 items, with no explicit quantity or value disclosed, and no location specified. A notable differentiator is the buyer’s option to adjust quantities by up to 25% of bid quantity at contract placement and during the currency, with a defined delivery-time calculation. Bid documents require basic financial credentials: PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by the bank. The tender emphasizes vendor registration and compliance with the buyer’s option clause, with delivery beginning after the original/extended delivery periods, and potential quantity adjustments across the contract term.

Technical Specifications & Requirements

  • 46 items listed in the BoQ; no explicit technical specs provided in the tender data.
  • Items span a range of vehicular electrical and mechanical components (e.g., Clutch Release bearing, Lamp unit vehicular, Alternator poly V belt, Oil seal, Weather strip door, Gasket).
  • The procurement framework implies basic material quality expectations and compatibility with military vehicle assemblies; no IS/ISO or OEM brand mandates are specified in the data.
  • Terms include standard option clauses for quantity variation and delivery timing tied to the last date of original/extended orders; bidders must align delivery plans accordingly and submit required financial documents.
  • No location, start/end dates, or explicit delivery schedules are provided in the tender text.

Terms, Conditions & Eligibility

  • Mandatory EMD/financial terms are not disclosed in the provided data; however, bidders must submit PAN Card, GSTIN, Cancelled Cheque, and an EFT Mandate certificate with bid.
  • The buyer reserves the right to increase/decrease quantity by up to 25% at contract or during currency, with delivery time calculations based on original quantity and extended periods.
  • Document submission requirements emphasize Vendor Code Creation and basic corporate credentials; no explicit warranty, payment terms, or penalty clauses are detailed in the supplied information.
  • Bidders must comply with the option clause and provide necessary registration documents to participate in this procurement exercise.

Key Specifications

    • Product/service names: Clutch Release bearing, Lamp unit vehicular, Regulator assemblies, Oil seals, Gasket, Weather strip door, Filter assembly, Nut hexagon, Clamp hose, Brush set, Lamp fluorescence, Lamp incandescent, Bearing bush, Eng mounting pad, etc.
    • Quantities: Not disclosed in BoQ data; 46 items listed
    • EMD/Estimated value: Not disclosed
    • Experience requirements: Not specified
    • Quality/compliance: Not specified in specifications section

Terms & Conditions

  • Option Clause: quantity +/- 25% at contract and during currency with adjusted delivery time

  • Submission: PAN, GSTIN, cancelled cheque, EFT mandate required with bid

  • Delivery: commence from last date of original/extended delivery order; minimum 30 days when calculating extra time

Important Clauses

Payment Terms

Not specified in the tender data; bidders should seek clarification on payment schedule with the Indian Army DoMA

Delivery Schedule

Delivery period starts from the last date of the original delivery order; extended time rules apply when option clause is exercised, with minimum 30 days for extra time

Penalties/Liquidated Damages

Not detailed in provided information; bidders should verify any LD terms during submission

Bidder Eligibility

  • Must provide PAN, GSTIN, cancelled cheque, EFT mandate

  • Must accept quantity variation up to 25% under option clause

  • Must participate under Vendor Code Creation and provide required documentation

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Clutch Release bearing , Cable Assy Control , Relay Emergency Valve , Arm Windshield with Wiper , Handle Door Assembly , Hand Primer , Coolant pump , Switch Push , Fuel Pump , Head lamp , Horn Electrical , Fan belt , Joint for Axel Shaft , Filter assy shorter , Nut Plain hexagon , Clamp hose , Brush set , Lamp unit vehicular , Door lock assy LH , Regulator assy RH , Regulator assy LH , Tail lamp RH , Drift pinion oil seal , Tail lamp LH , Map reading lamp , Air horn assy , Speedometer , Alternator poly V belt , Light black out , Oil seal for crank shaft rear , Clutch Release brg , Parts kit sleev cyl clutch , Parts kit power steering , House rubber , Lamp fluroscent , Lamp incandescent , Bearing Bush , Eng mounting pad , Weather strip door , Repair kit 4D , Sunvisor , Gasket , Oil cooler gasket , Bushing blank

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8573474.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 46 Items Sign in for GEM prices

#1

Clutch Release bearing

Clutch Release bearing

4 pieces Delivery: 15 days
#2

Cable Assy Control

Cable Assy Control

2 pieces Delivery: 15 days
#3

Relay Emergency Valve

Relay Emergency Valve

1 pieces Delivery: 15 days
#4

Arm Windshield with Wiper

Arm Windshield with Wiper

10 pieces Delivery: 15 days
#5

Handle Door Assembly

Handle Door Assembly

5 pieces Delivery: 15 days
#6

Hand Primer

Hand Primer

1 pieces Delivery: 15 days
#7

Coolant pump

Coolant pump

2 pieces Delivery: 15 days
#8

Switch Push

Switch Push

11 pieces Delivery: 15 days
#9

Fuel Pump

Fuel Pump

1 pieces Delivery: 15 days
#10

Head lamp

Head lamp

1 pieces Delivery: 15 days
#11

Horn Electrical

Horn Electrical

2 pieces Delivery: 15 days
#12

Fan belt

Fan belt

5 pieces Delivery: 15 days
#13

Joint for Axel Shaft

Joint for Axel Shaft

1 pieces Delivery: 15 days
#14

Filter assy shorter

Filter assy shorter

5 pieces Delivery: 15 days
#15

Nut Plain hexagon

Nut Plain hexagon

2 pieces Delivery: 15 days
#16

Switch Push

Switch Push

1 pieces Delivery: 15 days
#17

Clamp hose

Clamp hose

2 pieces Delivery: 15 days
#18

Brush set

Brush set

1 pieces Delivery: 15 days
#19

Lamp unit vehicular

Lamp unit vehicular

8 pieces Delivery: 15 days
#20

Door lock assy LH

Door lock assy LH

1 pieces Delivery: 15 days
#21

Regulator assy RH

Regulator assy RH

3 pieces Delivery: 15 days
#22

Regulator assy LH

Regulator assy LH

3 pieces Delivery: 15 days
#23

Clamp hose

Clamp hose

1 pieces Delivery: 15 days
#24

Tail lamp RH

Tail lamp RH

6 pieces Delivery: 15 days
#25

Drift pinion oil seal

Drift pinion oil seal

1 pieces Delivery: 15 days
#26

Tail lamp LH

Tail lamp LH

4 pieces Delivery: 15 days
#27

Map reading lamp

Map reading lamp

1 pieces Delivery: 15 days
#28

Air horn assy

Air horn assy

1 pieces Delivery: 15 days
#29

Speedometer

Speedometer

1 pieces Delivery: 15 days
#30

Alternator poly V belt

Alternator poly V belt

1 pieces Delivery: 15 days
#31

Light black out

Light black out

1 pieces Delivery: 15 days
#32

Oil seal for crank shaft rear

Oil seal for crank shaft rear

2 pieces Delivery: 15 days
#33

Clutch Release brg

Clutch Release brg

1 pieces Delivery: 15 days
#34

Parts kit sleev cyl clutch

Parts kit sleev cyl clutch

8 pieces Delivery: 15 days
#35

Parts kit power steering

Parts kit power steering

4 pieces Delivery: 15 days
#36

House rubber

House rubber

4 pieces Delivery: 15 days
#37

Lamp fluroscent

Lamp fluroscent

17 pieces Delivery: 15 days
#38

Lamp incandescent

Lamp incandescent

1 pieces Delivery: 15 days
#39

Bearing Bush

Bearing Bush

1 pieces Delivery: 15 days
#40

Eng mounting pad

Eng mounting pad

1 pieces Delivery: 15 days
#41

Weather strip door

Weather strip door

10 pieces Delivery: 15 days
#42

Repair kit 4D

Repair kit 4D

3 pieces Delivery: 15 days
#43

Sunvisor

Sunvisor

10 pieces Delivery: 15 days
#44

Gasket

Gasket

1 pieces Delivery: 15 days
#45

Oil cooler gasket

Oil cooler gasket

1 pieces Delivery: 15 days
#46

Bushing blank

Bushing blank

2 pieces Delivery: 15 days

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT mandate certified by bank

5

Vendor registration / Vendor Code Creation documents

6

Technical bid documents (if applicable)

7

OEM authorizations or product certifications (if claimed)

Technical Results

S.No Seller Item Date Status
1
ARMY TRADERS   Under PMA
-20-11-2025 22:15:41
2
SHREE BALAJI TRADING CO.   Under PMA
-20-11-2025 11:52:10
3
UTTAM ENGINEERING WORKS.   Under PMA
-20-11-2025 22:11:46

Financial Results

Rank Seller Price Item
L1
SHREE BALAJI TRADING CO.   Under PMA
Item Categories : Clutch Release bearing,Cable Assy Control,Relay Emergency Valve,Arm Windshield with Wiper,Handle Do
L2
ARMY TRADERS   Under PMA
Item Categories : Clutch Release bearing,Cable Assy Control,Relay Emergency Valve,Arm Windshield with Wiper,Handle Do
L3
UTTAM ENGINEERING WORKS.   Under PMA
Item Categories : Clutch Release bearing,Cable Assy Control,Relay Emergency Valve,Arm Windshield with Wiper,Handle Do

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for Indian Army vehicular parts tender 2025 in India?

Bidders must submit PAN, GSTIN, cancelled cheque, and bank-authenticated EFT mandate with the bid. Accept the option clause allowing ±25% quantity changes and prepare a delivery plan based on the original/extended schedule. Ensure Vendor Code Creation is completed before submission and provide basic corporate credentials.

What documents are required for Indian Army DoMA supply bid 2025?

Required documents include PAN Card copy, GSTIN copy, Cancelled Cheque, EFT Mandate certified by bank, and vendor registration details. If OEM or product certifications exist, include authorizations. Prepare any technical bid documents as applicable by the tender portal guidelines.

What items are included in the 46 BoQ vehicular parts for army tender?

The BoQ covers items such as Clutch Release bearing, Lamp unit vehicular, Regulator assemblies (RH/LH), Alternator belt, Oil seal, Weather strip, Gasket, and related components. Exact quantities are not disclosed in the available data; bidders should prepare to supply a broad range of mechanical and electrical parts.

When is the delivery window for the Indian Army parts tender 2025?

Delivery periods begin from the last date of the original delivery order; if the option clause is exercised, extended time is calculated as (increased quantity / original quantity) × original delivery period, with a minimum of 30 days. Confirm exact dates during bid submission as they are not provided here.

What are the EMD and payment terms for Army vehicle parts tender?

EMD amount is not disclosed in the data provided; bidders should refer to the official tender notice for exact EMD values. Payment terms are not specified; bidders should seek clarity during bid submission and align with standard DoMA practices.

What are the eligibility criteria for supplying vehicle parts to Indian Army DoMA 2025?

Eligibility centers on providing PAN, GSTIN, Cancelled Cheque, and EFT Mandate. Compliance with the option clause for quantity variation and ability to meet delivery terms is essential. Vendor Code Creation must be completed; no explicit turnover or experience thresholds are detailed in the available data.

What standards or certifications are required for this army parts tender 2025?

The tender data does not specify IS/ISO or OEM brand requirements. Bidders should verify any applicable certifications during submission, and provide OEM authorizations if claimed. Ensure product compatibility with military vehicle assemblies and align with DoMA procurement guidelines.

How to check eligibility and submit the bid for army vehicle parts in 2025?

Check vendor registration status, obtain a Vendor Code, gather PAN, GSTIN, cancelled cheque, and EFT mandate. Prepare a comprehensive list of vehicular parts with any OEM authorizations. Ensure you accept the quantity variation clause and provide delivery schedules aligned to the original/extended orders.