Bid Publish Date
23-Nov-2026, 4:33 pm
Bid End Date
30-Nov-2026, 5:00 pm
Location
Progress
North Western Railway invites bids for A3 Size Multifunction Printer (MFP) and Television (V3) under a single procurement notice. The scope includes supplier data sheet upload, ISO 9001 certification, and BIS certificate as mandatory. A flexible quantity clause allows up to a 25% increase in order quantity during contract execution at contracted rates. Service escalation details must be provided by the bidder. Location is not specified in the data, but this is part of Indian Railways procurement for standard office equipment.
Product/service names: A3 Size Multifunction Printer (MFP) and Television (V3)
Quantities/scope: Up to 25% quantity variation allowed under option clause
EMD/Estimated value: Not explicitly stated; prepare for standard tender deposits
Experience: ISO 9001 certification; BIS certificate for printer
Quality/compliance: Data sheet must exactly match product specifications
Option clause enabling up to 25% quantity variation during contract
Mandatory ISO 9001 and BIS/ISI documentation for bid eligibility
Upload of product data sheet and OEM authorizations required
Not explicitly specified; bidders should anticipate standard government payment terms upon delivery and acceptance.
Delivery period linked to original delivery order date; extended delivery time calculated as (additional quantity/original quantity) × original delivery period, minimum 30 days.
Not detailed in data; bidders should review contract terms for LDs or performance guarantees in ATC.
Bidder or OEM must hold ISO 9001 certification
Printer BIS certificate attached with bid
OEM authorization and data sheet must align with offered MFP and TV models
Quantity
3
Category
A3 Size Multifunction Printer (MFP)
Bid Type
Single Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
20 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
A3 Size Multifunction Printer (MFP) (Q2) , Television (V3) (Q2)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Jodhpur
Delivery Pincodes
342001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Deepak Gehlot | 342001,DRM OFFICE, JODHPUR | Jodhpur | Rajasthan | 342001 | 2 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar office equipment supply
Financial statements or solvency certificate
EMD/Security deposit documentation
Technical bid documents and product data sheets
OEM authorization / dealership certificate
ISO 9001 certificate ( bidder or OEM )
BIS certificate for printers (as applicable)
Bidders must submit Data Sheet with the bid, attach ISO 9001 and BIS certificates, provide OEM authorizations, GST, PAN, and financials. The bid should reflect the option clause allowing up to 25% quantity variation and include an escalation matrix for service support. Ensure product data matches offered MFP and TV specs.
Submit GST, PAN, experience certificates for similar supplies, financial statements, EMD evidence, technical bid, product data sheet, OEM authorization, and ISO 9001 and BIS certificates. Ensure data sheet matches offered models; missing items can lead to rejection.
Bidders must provide ISO 9001 certification and BIS certificate for the printer. OEM authorization is preferred; Data Sheet must align with product specifications. In case of mismatch, the bid may be rejected, so verify all technical parameters before submission.
Delivery terms reference the original delivery order date; if option quantities are exercised, the additional time equals (additional quantity/original quantity) × original delivery period, with a mandatory minimum of 30 days. Plan for scalable quantity deployment within this window.
Eligibility includes compliance with ISO 9001, BIS certification for printers, valid OEM authorization, and data sheet alignment. Vendors should provide experience certificates for similar government equipment supplies and relevant GST/PAN documentation to participate.
The data sheet must exactly match the offered A3 MFP and TV (V3) specifications. Include model numbers, technical parameters, warranty terms, and service levels. Any mismatch can trigger rejection, so cross-check each parameter against the BOQ and ATC.