Open Tender for TSU1357001,TSU1357002,TSU1357003,TSU1357004,TSU1357005,TSU1357006,TSU1357007,TSU1357008,TSU1357009, in LUCKNOW, UTTAR PRADESH

Bid Publish Date

09-Dec-2025, 2:34 pm

Bid End Date

07-Feb-2026, 5:00 pm

EMD

₹20,00,000

Generate Docs

Progress

RA
Issue09-Dec-2025, 2:34 pm
Reverse Auction31-May-2026, 10:00 am
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

359671

Category

TSU1357001

Bid Type

Two Packet Bid

Categories 180

COPPER WIRE ELECTRICAL JUICER WIND MILL ENERGY PROJECT APPARELS UG CABLE UNDERGROUND CABLE DIGITAL CROSS CONNECT REVOLVING CHAIR APFC PANEL BRANDED SOFTWARE AUDIO VIDEO CONFERENCING VIDEO RECORDER SYRINGE PUMPS NETWORKING RACK TERMINAL BLOCKS DISTRIBUTION BOARD INTERIOR UPS EARTH WIRE WOODEN TROLLEY ELECTRONIC COMPUTATIONAL DEVICE SAFE DEPOSIT LOCKER POWER CABLE CABBING EQUIPMENTS MULTI SERVICE SWITCH PTFE WIRE TIME LOCKS IOSM ARNO STARTING CONTACTOR ELECTROMECHANICAL MACHINERY ELECTRICAL PRODUCTS CAMERA SWITCH YARD WIRING ASSEMBLY INFRARED TEMPERATURE INDICATOR WIRING SPECIFICATION DISTRIBUTION?BOX VIDEO OUTPUT DEVICE CHANNEL DOCUMENT MANAGEMENT PUBLIC ADDRESS SYSTEM WOODEN PRODUCT DISCRETE COMPONENTS SECURITY CAMERAS ELECTRICAL WIRE XLPE CABLE SATELLITE ACCESS EQUIPMENT STEEL WIRE PIPING CIRCUIT PROTECTION DEVICE LIGHTENING PROTECTION DEVICE TELECOM EQUIPMENT FALSE CELING AMPOULE FILLING EQUIPMENT RF CABLE CLOTHING MCCB ARTICULATING LAZY ARMS GI WIRE ELECTRICAL BOXES ELECTRICAL SUBSTATION SOLAR CHARGER ELECTRICAL PANEL GATE CONTROL WATER SUPPLY PANEL STOMACHERS CONDUCTOR SWITCH PORT COMMON USE TERMINAL EQUIPMENT CABLING SURVEILLANCE EQUIPMENTS POWER SOLAR CHARGING AUDIO VISUAL INSTRUMENT BUS TERMINAL CB BOX ELECTRIC ROPE SHOVEL PIG BINOCULARS JUMPER WIRE BLOCKS SOLAR BLINKER GI PIPE HIGH TENSION PANEL ATM COILED CABLE DISASTER RECOVERY PROCESS LOCAL AREA NETWORK CABLING AIR CONDITIONER SOLAR CELLS DOORS LFH CABLE AUTOMATIC TELLER MACHINE CABLE TERMINAL HOOK UP WIRES OCEAN ENGINEERING OPTICAL FIBRE CABLE PVC CABLE SHIELDED CABLE VIDEO MONITORS GALVANISED POLE GLUCOMETER LENSES CCTV SYSTEM FIRE ALARM PANEL COUPLERS RF PASSIVE COMPONENTS AWM WIRE GL WIRE CABLE LAYING LED LIGHT IT EQUIPMENT BULLET CAMERA POWER DISTRIBUTION BOARD POWER WIRE GATEWAY SPORT VEHICLE BELL CONTROLLER SOLAR PHOTOVOLTAIC MODULE PORT WIRING DUCTS SCOPES SPECULA AND ACCESSORIES JOY STICK INTEGRATED SECURITY SYSTEM MANHOLE CONSTRUCTION AUDIO VISUAL BOX WATER LEVEL RECORDER ELECTRIC UTILITIES WIRE FILTER RETAINERS GEAR WIRE CONNECTORS SOLAR PV PROJECT ELECTRICAL DESIGN SERVICE FUME HOODS DISTRIBUTION PANEL VIDEO TRACKING SYSTEM APPLICATION SOFTWARE CAT ENT SET ACCESS REMOTE LOCK CONNECTORS AND TERMINALS SOLAR PHOTOVOLTAIC SYSTEM FIBERS THREADS AND YARNS TUBES AND PIPES GALVANIZED WIRE AUDIO VIDEO EQUIPMENT CITY SURVEILLANCE BARE CABLE COMPUTER AIDED DESIGN SOFTWARE DATA PROTECTION SPEAKER BACTERIAL EXPRESSION VECTOR TRANSITION METALS INFORMATION DISPLAY CABLE BOOM BARRIER WEB CAMERA STEEL WATER TANK ELECTRICAL CABLE BATTERY VALVE PARTS AND ACCESSORIES ACCESS CONTROL AUDIO AND VIDEO AUTOMOTIVE CABLE CONTROL SYSTEM FACE RECOGNITION INSULATED CABLE LOW TENSION PANEL PEB SECURITY GUARD SECURITY CABIN SOFTWARE BITTER GUARD JACK GALVANIZED IRON PIPE DATA WALL DISPLAY

Electronics Corporation Of India Limited announces a tender for TSU1357001, TSU1357002, TSU1357003, TSU1357004, TSU1357005, TSU1357006, TSU1357007, TSU1357008, TSU1357009, TSU1357010, TSU1357011, TSU1357012, TSU1357013, TSU1357014, TSU1357015, TSU1357016, TSU1357017, TSU1357018, TSU1357019, TSU1357020, TSU1357021, TSU1357022, TSU1357023, TSU1357024, TSU1357025, TSU1357026, TSU1357027, TSU1357028, TSU1357029, TSU1357030, TSU1357031, TSU1357032, TSU1357033, TSU1357034, TSU1357035, TSU1357036, TSU1357037, TSU1357038, TSU1357039, TSU1357040, TSU1357041, TSU1357042, TSU1357043, TSU1357044, TSU1357045, TSU1357046, TSU1357047, TSU1357048, TSU1357049, TSU1357050, TSU1357051, TSU1357052, TSU1357053, TSU1357054, TSU1357055, TSU1357056, TSU1357057, TSU1357058, TSU1357059, TSU1357060, TSU1357061, TSU1357062, TSU1357063, TSU1357064, TSU1357065, TSU1357066, TSU1357067, TSU1357068, TSU1357069, TSR1357001, TSR1357002, TSR1357003, TSR1357004, TSR1357005, TSR1357006, TSR1357007, TSR1357008, TSR1357009, TSR1357010, TSR1357011, TSR1357012, TSR1357013, TSR1357014, TSR1357015, TSR1357016, TSR1357017, TSR1357018, TSR1357019, TSR1357020, TSR1357021, TSR1357022, TSR1357023, TSR1357024, TSR1357025, TSR1357026, TSR1357027, TSR1357028, TSR1357029, TSR1357030, TSR1357031, TSR1357032, TSR1357033, TSR1357034, TSR1357035, TSR1357036, TSR1357037, TSR1357038, TSR1357039, TSR1357040, TSR1357041, TSR1357042, TSR1357043, TSR1357044, TSR1357045, TSR1357046, TRF1357001, TRF1357002, TRF1357003, TRF1357004, TRF1357005, TRF1357006, TRF1357007, TRF1357008, TRF1357009, TRF1357010, TRF1357011, TRF1357012, TRF1357013 in LUCKNOW, UTTAR PRADESH. Quantity: 359671. Submission Deadline: 07-02-2026 17: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

TSU1357001 , TSU1357002 , TSU1357003 , TSU1357004 , TSU1357005 , TSU1357006 , TSU1357007 , TSU1357008 , TSU1357009 , TSU1357010 , TSU1357011 , TSU1357012 , TSU1357013 , TSU1357014 , TSU1357015 , TSU1357016 , TSU1357017 , TSU1357018 , TSU1357019 , TSU1357020 , TSU1357021 , TSU1357022 , TSU1357023 , TSU1357024 , TSU1357025 , TSU1357026 , TSU1357027 , TSU1357028 , TSU1357029 , TSU1357030 , TSU1357031 , TSU1357032 , TSU1357033 , TSU1357034 , TSU1357035 , TSU1357036 , TSU1357037 , TSU1357038 , TSU1357039 , TSU1357040 , TSU1357041 , TSU1357042 , TSU1357043 , TSU1357044 , TSU1357045 , TSU1357046 , TSU1357047 , TSU1357048 , TSU1357049 , TSU1357050 , TSU1357051 , TSU1357052 , TSU1357053 , TSU1357054 , TSU1357055 , TSU1357056 , TSU1357057 , TSU1357058 , TSU1357059 , TSU1357060 , TSU1357061 , TSU1357062 , TSU1357063 , TSU1357064 , TSU1357065 , TSU1357066 , TSU1357067 , TSU1357068 , TSU1357069 , TSR1357001 , TSR1357002 , TSR1357003 , TSR1357004 , TSR1357005 , TSR1357006 , TSR1357007 , TSR1357008 , TSR1357009 , TSR1357010 , TSR1357011 , TSR1357012 , TSR1357013 , TSR1357014 , TSR1357015 , TSR1357016 , TSR1357017 , TSR1357018 , TSR1357019 , TSR1357020 , TSR1357021 , TSR1357022 , TSR1357023 , TSR1357024 , TSR1357025 , TSR1357026 , TSR1357027 , TSR1357028 , TSR1357029 , TSR1357030 , TSR1357031 , TSR1357032 , TSR1357033 , TSR1357034 , TSR1357035 , TSR1357036 , TSR1357037 , TSR1357038 , TSR1357039 , TSR1357040 , TSR1357041 , TSR1357042 , TSR1357043 , TSR1357044 , TSR1357045 , TSR1357046 , TRF1357001 , TRF1357002 , TRF1357003 , TRF1357004 , TRF1357005 , TRF1357006 , TRF1357007 , TRF1357008 , TRF1357009 , TRF1357010 , TRF1357011 , TRF1357012 , TRF1357013

Authority Records

DEPARTMENT OF ATOMIC ENERGY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8682215.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 128 Items Sign in for GEM prices

#1

TSU1357001

Supply of 5MP IP Fixed Bullet Camera Indoor / Outdoor with varifocal lens, with supported edge analytics and mounting accessories with 128 GB SD Card

74 nos Delivery: 275 days
#2

TSU1357002

Supply of 2 MP PTZ Dome Camera Outdoor / Indoor with 30x Optical zoom, 10x Digital zoom and with supported edge analytics and mounting accessories with 128 GB SD Card.

65 nos Delivery: 275 days
#3

TSU1357003

Supply of 5MP Fixed dome camera Indoor / Outdoor IP Camera, varifocal lens, with supported edge analytics and mounting accessories with 128 GB SD Card

105 nos Delivery: 275 days
#4

TSU1357004

Supply of 5MP Fixed Bullet camera Indoor / Outdoor IP Camera, Autofocus motorized remote zoom, with supported edge analytics and mounting accessories with SD Card 128 GB

115 nos Delivery: 275 days
#5

TSU1357005

Supply of Face Recognition & Forensic Search Camera 6 MP with analytics along with inbuilt FR licence with 128 GB SD Card

20 nos Delivery: 275 days
#6

TSU1357006

Supply of 4 MP Long Range Bullet camera to cover LANE for LPR (Licence Plate Recognition)

3 nos Delivery: 275 days
#7

TSU1357007

Supply of 40 MP Critical Surveillance Camera for surveillance of critical and crowded area with 128 GB SD Card

2 nos Delivery: 275 days
#8

TSU1357008

Supply of Thermal Enhanced Fixed Camera

3 nos Delivery: 275 days
#9

TSU1357009

Supply of Dual Channel PTZ Camera (Thermal + Optical)

3 nos Delivery: 275 days
#10

TSU1357010

Supply of Body Worn Camera Systems with 64GB inbuilt storage with complete set of charging dockyard and other required accessories

10 nos Delivery: 275 days
#11

TSU1357011

Supply of Video Management Software (VMS) Software with licenses for camera for all above mentioned Cameras and additional licenses for exiting Bosch make Cameras-161 Nos.

600 nos Delivery: 275 days
#12

TSU1357012

Supply of Network Video server cum Storage with 200TB usable storage after RAID6 configuration and with failover configuration

6 nos Delivery: 275 days
#13

TSU1357013

Supply of Client Workstation with 6GB Graphics Adapter, 21.5 INCH LED Monitor, Keyboard and Mouse for Control Room Operation.

8 nos Delivery: 275 days
#14

TSU1357014

Supply of PTZ Joystick controller for CCTV System

8 nos Delivery: 275 days
#15

TSU1357015

Supply of 6x2 matrix full HD video wall of 55 display panels along with Matrix controller and complete system including mounting frame and full HD HDMI cables for connectivity from Workstation to video wall.

1 sets Delivery: 275 days
#16

TSU1357016

Supply of Switch with 48 25G SFP28 ports and 8 100G QSFP28 ports

2 nos Delivery: 275 days
#17

TSU1357017

Supply of GigE L3 1RU chassis with 24 100/1000 BaseX SFP, 4 1G/10G SFP+, 4 SFP28 (1G/10G/25G) ports and 2 QSFP28 VFL ports.

12 nos Delivery: 275 days
#18

TSU1357018

Supply of Fixed 1RU chassis switch with 24 PoE 1G BaseT, 2 1G RJ45/SFP+ combo, 2 1G/10G SFP+ uplink/VFL ports.

64 nos Delivery: 275 days
#19

TSU1357019

Supply of 8 port field switches with 8Nos POE+ ports, RJ-45 10/100/1000 Mbps ports and 2xSFP slots

36 nos Delivery: 275 days
#20

TSU1357020

Supply of 10G SFP+ SM, LC FO transceiver modules for above switch, Make Same as above switch

122 nos Delivery: 275 days
#21

TSU1357021

Supply of 1G SM FO, LC SFP transceiver modules for above switches, Make Same as above switch

250 nos Delivery: 275 days
#22

TSU1357022

Supply of 8-port KVM Switch with foldable Monitor, keyboard & Mouse

2 nos Delivery: 275 days
#23

TSU1357023

Supply of IP based two Way Public Address (PA) System with Application Software (with perpetual license) and Hardware

1 set Delivery: 275 days
#24

TSU1357024

Supply of IP based outdoor Horn Speaker with Amplifier

24 nos Delivery: 275 days
#25

TSU1357025

Supply of IP based indoor Speaker with Amplifier

40 nos Delivery: 275 days
#26

TSU1357026

Supply of IP Paging SIP System

4 nos Delivery: 275 days
#27

TSU1357027

Supply of 19 Inch 42U Server rack with 800mm width, 1200mm depth including all accessories

2 nos Delivery: 275 days
#28

TSU1357028

Supply of Indoor 19 Inch 12U Network rack including all accessories

83 nos Delivery: 275 days
#29

TSU1357029

Supply of Outdoor, 19 Inch 9U Network rack including all accessories

5 nos Delivery: 275 days
#30

TSU1357030

Supply of Hot dip galvanized 5 Mtr poles for mounting cameras

45 nos Delivery: 275 days
#31

TSU1357031

Supply of 40KVA online Smart UPS in 1 + 1 redundant configuration with separate battery bank for each UPS for 30minutes Battery Backup

1 sets Delivery: 275 days
#32

TSU1357032

Supply of 20KVA online Smart UPS in 1 + 1 redundant configuration with separate battery bank for each UPS for 30minutes Battery Backup

3 sets Delivery: 275 days
#33

TSU1357033

Supply of 10KVA online Smart UPS with 30 minutes Battery Backup

2 sets Delivery: 275 days
#34

TSU1357034

Supply of 5KVA online Smart UPS with 30 minutes Battery Backup

3 sets Delivery: 275 days
#35

TSU1357035

Supply of 3KVA online Smart UPS 30minutes Battery Backup

15 sets Delivery: 275 days
#36

TSU1357036

Supply of Indoor junction box with required MCCB/ MCB and required accessories for power distribution at UPS point for 40/20/10 KVA UPS

6 nos Delivery: 275 days
#37

TSU1357037

Supply of Indoor junction box with required MCCB / MCB and required accessories for distribution of power for power distribution at UPS point for 5 / 3 KVA UPS

18 nos Delivery: 275 days
#38

TSU1357038

Supply of Outdoor IP65 Junction box (made of MS, painted) for cameras with provision for fixing camera, power supply, CAT6 I/O box, terminal block and mounting accessories to fix JB on wall/pole

261 nos Delivery: 275 days
#39

TSU1357039

Supply of Indoor Junction box (Made of MS, painted) for cameras with provision for fixing CAT6 I/O box and mounting accessories to fix JB on wall

300 nos Delivery: 275 days
#40

TSU1357040

Supply of 24 Port LIU fully loaded with adaptor LC, SM & pigtails

45 nos Delivery: 275 days
#41

TSU1357041

Supply of 12 Port LIU, fully loaded with adaptor LC, SM & pigtails

20 nos Delivery: 275 days
#42

TSU1357042

Supply of 6 Port LIU, fully loaded with LC adaptor, SM & pigtails

45 nos Delivery: 275 days
#43

TSU1357043

Supply of FO Patch Cord , Duplex, SM., LC to LC, 3mtrs

800 nos Delivery: 275 days
#44

TSU1357044

Supply of CAT 6 UTP Electrical Patch Cord , RJ-45 -- RJ-45, 10mtr

100 nos Delivery: 275 days
#45

TSU1357045

Supply of CAT 6 UTP Electrical Patch Cord , RJ-45 -- RJ-45, 3mtr

200 nos Delivery: 275 days
#46

TSU1357046

Supply of CAT 6 UTP Electrical Patch Cord , RJ-45 -- RJ-45, 2mtr

600 nos Delivery: 275 days
#47

TSU1357047

Supply of CAT 6 UTP Electrical Patch Cord , RJ-45 -- RJ-45, 1mtr

200 nos Delivery: 275 days
#48

TSU1357048

Supply of 19 Inch Rack mountable CAT6 jack panel 24 port Fully loaded

100 nos Delivery: 275 days
#49

TSU1357049

Supply of CAT6 UTP Info Outlets(Input Output box) fully loaded

500 nos Delivery: 275 days
#50

TSU1357050

Supply of 12 Core, Single mode, 9 by 125, Armoured, outdoor Optical fiber cable

12,000 mtrs Delivery: 275 days
#51

TSU1357051

Supply of 24 Core, Single mode, 9 by 125, Armoured, outdoor Optical fibre cable

5,000 mtrs Delivery: 275 days
#52

TSU1357052

Supply of Outdoor CAT 6 UTP cable

40,000 meters Delivery: 275 days
#53

TSU1357053

Supply of 4 core, 16 sq.mm copper conductor armoured power cable

2,500 mtrs Delivery: 275 days
#54

TSU1357054

Supply of 3 core, 4 sq.mm copper conductor armoured power cable

4,500 mtrs Delivery: 275 days
#55

TSU1357055

Supply of 3 core, 2.5 sq.mm copper conductor armoured power cable

30,000 meters Delivery: 275 days
#56

TSU1357056

Supply of 3 core, 1.5 sq.mm copper conductor armoured power cable

6,500 mtrs Delivery: 275 days
#57

TSU1357057

Supply of 3 core, 0.75 sq.mm copper conductor unarmoured power cable

2,000 meters Delivery: 275 days
#58

TSU1357058

Supply of Single core, 10 sq.mm copper conductor unarmoured power cable for Earthing connectivity

4,000 meters Delivery: 275 days
#59

TSU1357059

Supply of 50 mm HDPE PLB duct for cable laying

35,000 mtrs Delivery: 275 days
#60

TSU1357060

Supply of 50 mm PVC rigid conduit for cable laying

10,000 mtrs Delivery: 275 days
#61

TSU1357061

Supply of 50 mm PVC Channel/PVC casing & capping for cable laying

1,000 mtrs Delivery: 275 days
#62

TSU1357062

Supply of 32 mm PVC rigid conduit for cable laying

15,000 mtrs Delivery: 275 days
#63

TSU1357063

Supply of 32 mm PVC Channel/PVC casing & capping for cable laying

2,000 mtrs Delivery: 275 days
#64

TSU1357064

Supply of ISI marked 2 Inch Class A GI pipe

600 mtrs Delivery: 275 days
#65

TSU1357065

Supply of ISI marked 2 Inch Class B GI pipe

1,000 mtrs Delivery: 275 days
#66

TSU1357066

Supply of 19 Inch Rack mountable Power Distribution Board with 5 Nos of 230AC power sockets

100 nos Delivery: 275 days
#67

TSU1357067

Supply of CE marked Nylon/Polyamide Cable glands suitable for unarmoured cables, (minimum qty as per detailed spec)

1 sets Delivery: 275 days
#68

TSU1357068

Supply of 3/4 Inch Double compression Brass Nickel plated cable glands suitable for armoured cables (Minimum Qty to be supplied 400Nos)

1 sets Delivery: 275 days
#69

TSU1357069

Supply of Terminal blocks as per site requirement ( (minimum qty as per detailed spec)

1 sets Delivery: 275 days
#70

TSR1357001

Fixing/ Installation and Commissioning of 5MP IP Fixed Bullet Camera on wall/ ceiling/ pole etc. All the required accessories like U-Bolt/ SS Gear Clamp/ Hardware/ Steel wire reinforced conduit etc. consumables required for fixing the camera shall be arranged by supplier / sub-contractor. Proper Earth wire from Camera/Housing shall be provided and connected to the local earth point. The field of view and focus adjustment shall be carried out to obtain the better coverage and image quality.

74 nos Delivery: 275 days
#71

TSR1357002

Fixing/ Installation and Commissioning of 2 MP PTZ Dome Camera on wall/ ceiling/ pole etc. All the required accessories like U-Bolt/ SS Gear Clamp/ Hardware/ Steel wire reinforced conduit etc. consumables required for fixing the camera shall be arranged by supplier / sub-contractor. Proper Earth wire from Camera/Housing shall be provided and connected to the local earth point. The field of view and focus adjustment shall be carried out to obtain the better coverage and image quality.

65 nos Delivery: 275 days
#72

TSR1357003

Fixing/ Installation and Commissioning of 5MP Fixed dome camera on wall/ ceiling etc. All the required accessories like U-Bolt/ SS Gear Clamp/ Hardware/ Steel wire reinforced conduit etc. consumables required for fixing the camera shall be arranged by supplier / sub-contractor. Proper Earth wire from Camera/Housing shall be provided and connected to the local earth point. The field of view and focus adjustment shall be carried out to obtain the better coverage and image quality.

105 nos Delivery: 275 days
#73

TSR1357004

Fixing/ Installation and Commissioning of 5MP Fixed Bullet camera on wall/ ceiling/ pole etc. All the required accessories like U-Bolt/ SS Gear Clamp/ Hardware/ Steel wire reinforced conduit etc. consumables required for fixing the camera shall be arranged by supplier / sub-contractor. Proper Earth wire from Camera/Housing shall be provided and connected to the local earth point. The field of view and focus adjustment shall be carried out to obtain the better coverage and image quality.

115 nos Delivery: 275 days
#74

TSR1357005

Fixing/ Installation and Commissioning of 6Mp Face Recognition & Forensic Search Camera on wall/ ceiling/ pole etc. All the required accessories like U-Bolt/ SS Gear Clamp/ Hardware/ Steel wire reinforced conduit etc. consumables required for fixing the camera shall be arranged by supplier / sub-contractor. Proper Earth wire from Camera/Housing shall be provided and connected to the local earth point. The field of view and focus adjustment shall be carried out to obtain the better coverage and image quality.

20 nos Delivery: 275 days
#75

TSR1357006

Fixing/ Installation and Commissioning of 4 MP Long Range Bullet camera on wall/ ceiling/ pole etc. All the required accessories like U-Bolt/ SS Gear Clamp/ Hardware/ Steel wire reinforced conduit etc. consumables required for fixing the camera shall be arranged by supplier / sub-contractor. Proper Earth wire from Camera/Housing shall be provided and connected to the local earth point. The field of view and focus adjustment shall be carried out to obtain the better coverage and image quality.

3 nos Delivery: 275 days
#76

TSR1357007

Fixing/ Installation and Commissioning of 40 MP Critical Surveillance Camera on wall/ ceiling/ pole etc. All the required accessories like U-Bolt/ SS Gear Clamp/ Hardware/ Steel wire reinforced conduit etc. consumables required for fixing the camera shall be arranged by supplier / sub-contractor. Proper Earth wire from Camera/Housing shall be provided and connected to the local earth point. The field of view and focus adjustment shall be carried out to obtain the better coverage and image quality.

2 nos Delivery: 275 days
#77

TSR1357008

Fixing/ Installation and Commissioning of Thermal Enhanced Fixed Camera on wall/ ceiling/ pole etc. All the required accessories like U-Bolt/ SS Gear Clamp/ Hardware/ Steel wire reinforced conduit etc. consumables required for fixing the camera shall be arranged by supplier / sub-contractor. Proper Earth wire from Camera/Housing shall be provided and connected to the local earth point. The field of view and focus adjustment shall be carried out to obtain the better coverage and image quality.

3 nos Delivery: 275 days
#78

TSR1357009

Fixing/ Installation and Commissioning of Dual Channel PTZ Camera (Thermal + Optical) on wall/ ceiling/ pole etc. All the required accessories like U-Bolt/ SS Gear Clamp/ Hardware/ Steel wire reinforced conduit etc. consumables required for fixing the camera shall be arranged by supplier / sub-contractor. Proper Earth wire from Camera/Housing shall be provided and connected to the local earth point. The field of view and focus adjustment shall be carried out to obtain the better coverage and image quality.

3 nos Delivery: 275 days
#79

TSR1357010

Fixing/ Installation and Commissioning of Network Video server cum Storage with 200TB usable storage after RAID6 configuration and with failover configuration

6 nos Delivery: 275 days
#80

TSR1357011

Fixing/ Installation and Commissioning of IP based two Way Public Address (PA) System with Application Software (with perpetual license) and Hardware

1 set Delivery: 275 days
#81

TSR1357012

Fixing/ Installation and Commissioning of IP based outdoor Horn Speaker with Amplifier All the required accessories for fixing the device shall be arranged by supplier / sub-contractor.

24 nos Delivery: 275 days
#82

TSR1357013

Fixing/ Installation and Commissioning of IP based indoor Speaker with Amplifier All the required accessories for fixing the device shall be arranged by supplier / sub-contractor.

40 nos Delivery: 275 days
#83

TSR1357014

Mounting and installation 19 Inch- 42U Server rack with 800mm width, 1200mm depth including mounting and installation of Servers/ Storages / KVM Switch etc. (as per detailed spec)

2 nos Delivery: 275 days
#84

TSR1357015

Mounting and installation 19 Inch- 12U rack including mounting and installation of devices inside the rack with termination of Cat6/ FO Cable/ Armored Power Cables/ Unarmored power Cables/ Earthing Cable in the rack (as per detailed spec)

83 nos Delivery: 275 days
#85

TSR1357016

Mounting and installation 19 Inch - 9U rack including mounting and installation of devices inside the rack with termination of Cat6/ FO Cable/ Armored Power Cables/ Unarmored power Cables/ Earthing Cable in the rack (as per detailed spec)

5 nos Delivery: 275 days
#86

TSR1357017

Erection of 5m poles including civil foundation Soft soil digging for preparation of pole foundation using PCC, fixing & installation of 5 Mtr pole, providing 8 SWG GI wire for earthing to the pole foundation(as per detailed spec)

45 nos Delivery: 275 days
#87

TSR1357018

Installation & commissioning of 40KVA online Smart UPS in 1+1 redundant configuration with separate battery bank for each UPS inside the UPS room including all electrical wiring, mounting of batteries on rack, earting etc.

1 sets Delivery: 275 days
#88

TSR1357019

Installation & commissioning of 20KVA online Smart UPS in 1+1 redundant configuration with separate battery bank for each UPS inside the UPS room including all electrical wiring, mounting of batteries on rack, earting etc.

3 sets Delivery: 275 days
#89

TSR1357020

Installation & commissioning of 10KVA online Smart UPS inside the UPS room including all electrical wiring, mounting of batteries on rack, earting etc.

2 sets Delivery: 275 days
#90

TSR1357021

Installation & commissioning of 5KVA online Smart UPS inside the UPS room including all electrical wiring, mounting of batteries on rack, earting etc.

3 sets Delivery: 275 days
#91

TSR1357022

Installation & commissioning of 3KVA online Smart UPS inside the UPS room including all electrical wiring, mounting of batteries on rack, earting etc.

15 sets Delivery: 275 days
#92

TSR1357023

Mounting and fixing of Indoor junction box with populating all the items and termination of cables inside the JB for power distribution at UPS point for 40 KVA /20 KVA /10 KVA UPS

6 nos Delivery: 275 days
#93

TSR1357024

Mounting and fixing of Indoor junction box with populating all the items and termination of cables inside the JB for power distribution at UPS point for 5KVA/ 3 KVA UPS

18 nos Delivery: 275 days
#94

TSR1357025

Mounting and fixing of Outdoor IP65 Junction box with populating all the items like LIU, Switches, TBs etc. and termination of cables inside the JB for cameras on wall/pole.

261 nos Delivery: 275 days
#95

TSR1357026

Mounting and fixing of Indoor Junction box for cameras with populating all the items and termination of cables inside the JB for cameras on wall/pole

300 nos Delivery: 275 days
#96

TSR1357027

Pulling/ laying of armored 12 Core, Single mode, 9/125, Armoured, outdoor Optical fiber cable inside conduit/ undergroung/ wall etc.

12,000 mtrs Delivery: 275 days
#97

TSR1357028

Pulling/ laying of armored 24 Core, Single mode, 9/125, Armoured, outdoor Optical fiber cable inside conduit/ undergroung/ wall etc.

5,000 mtrs Delivery: 275 days
#98

TSR1357029

Pulling/ laying of Outdoor CAT 6 UTP cable

40,000 mtrs Delivery: 275 days
#99

TSR1357030

Pulling/ laying of 4 core, 16 sq.mm copper conductor power cable

2,500 mtrs Delivery: 275 days
#100

TSR1357031

Pulling/ laying of 3 core, 4 sq.mm copper conductor power cable

4,500 mtrs Delivery: 275 days
#101

TSR1357032

Pulling/ laying of 3 core, 2.5 sq.mm copper conductor power cable

30,000 mtrs Delivery: 275 days
#102

TSR1357033

Pulling/ laying of 3 core, 1.5 sq.mm copper conductor power cable

6,500 mtrs Delivery: 275 days
#103

TSR1357034

Pulling/ laying of 3 core, 0.75 sq.mm copper conductor unarmoured power cable

2,000 mtrs Delivery: 275 days
#104

TSR1357035

Pulling/ laying of Single core, 10 sq.mm copper conductor unarmoured power cable for Earthing connectivity

4,000 mtrs Delivery: 275 days
#105

TSR1357036

Laying of 50 mm HDPE PLB duct for cable laying. Joining of two pieces should be avoided, however if any two pieces (if any) are to be joined suitable couplers shall be used and the same shall be provided by supplier/subcontractor. The couplers shall be provided and installed in such a way that, after laying of the conduits cable pulling through these conduits is to be carried out without any hurdle.

35,000 mtrs Delivery: 275 days
#106

TSR1357037

Laying of 50 mm PVC rigid conduit for cable laying

10,000 mtrs Delivery: 275 days
#107

TSR1357038

Laying of 50 mm PVC Channel/PVC casing & capping for cable laying

1,000 mtrs Delivery: 275 days
#108

TSR1357039

Laying of 32 mm PVC rigid conduit for cable laying

15,000 mtrs Delivery: 275 days
#109

TSR1357040

Laying of 32 mm PVC Channel/PVC casing & capping for cable laying

2,000 mtrs Delivery: 275 days
#110

TSR1357041

Mounting and installation of 19 Inch Rack mountable Power Distribution Board with power sockets and termination of cables using lugs and ferruling

100 nos Delivery: 275 days
#111

TSR1357042

Making of Trench of 900mm depth, 300mm wide and re-surfacing including supply of required civil material

8,000 mtrs Delivery: 275 days
#112

TSR1357043

F.O splicing with pig tails, testing, end to end connectivity including providing of test reports for all the segment and for each fibre. Structured F.O cabling system shall be followed. (Rate per core should be given)

1,590 nos Delivery: 275 days
#113

TSR1357044

Cutting of RCC/ tar road to a depth of 200mm laying of 2 Inch GI pipe and back filling and resurfacing as it was including supply of 2 Inch GI pipe and other material

1,600 mtrs Delivery: 275 days
#114

TSR1357045

Making chambers / manhole with PCC finishing on all sides and RCC manhole cover for cable looping at required locations (Size 1m x 1m x 1m) including all civil material and accessories

100 nos Delivery: 275 days
#115

TSR1357046

Chemical maintenance free earthing for Poles and Racks

120 nos Delivery: 275 days
#116

TRF1357001

Supply & installation of false ceiling mounted 30W LED light with IP20 Protection enclosure

8 set Delivery: 275 days
#117

TRF1357002

Supply & installation of 3 Ton Cassette AC

5 nos Delivery: 275 days
#118

TRF1357003

Supply & installation of Copper piping with power cable

120 meter Delivery: 275 days
#119

TRF1357004

Supply & installation of Entry doors for control room, server room, UPS room

3 nos Delivery: 275 days
#120

TRF1357005

Supply & installation of Operator Desk for 2 operators

7 nos Delivery: 275 days
#121

TRF1357006

Supply of Revolving Chair

15 nos Delivery: 275 days
#122

TRF1357007

Supply & installation of Fire Detecetion system (inside Control Room, server room, UPS room

3 set Delivery: 275 days
#123

TRF1357008

Supply & installation of Access Control System on entry doors Entry Doors of control room, server room and UPS room

3 set Delivery: 275 days
#124

TRF1357009

Supply & installation Rodent System in control room, server room and UPS room

3 lot Delivery: 275 days
#125

TRF1357010

Wall Panelling for control room as per scope mentioned in Annexure B

400 sq ft Delivery: 275 days
#126

TRF1357011

False Flooring for control room as per tech specs mentioend in Annexure B.

750 sq ft Delivery: 275 days
#127

TRF1357012

Installation of Electrical Panel including MCCB/ MCB in control room, wiring of electrical cables/ UPS wiring, ferruling of cables etc. including supply of these items as per scope mentioned in Annexure B

1 lumsum Delivery: 275 days
#128

TRF1357013

Mounting of monitors of video wall (6X2), removing of existing video wall, Cable Routing of cat6 cable using trays/concealed conduit/ raceways/ cable termination/ earthing/ audio visual setup etc.

1 lot Delivery: 275 days

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

4 Updates
#1

Update

27-Jan-2026
#2

Update

27-Jan-2026

Extended Deadline

07-Feb-2026, 5:00 pm

Opening Date

07-Feb-2026, 5:30 pm

#3

Update

02-Jan-2026

Extended Deadline

05-Jan-2026, 11:00 am

Opening Date

05-Jan-2026, 11:30 am

#4

Update

30-Dec-2025

Extended Deadline

02-Jan-2026, 11:00 am

Opening Date

02-Jan-2026, 11:30 am

Reverse Auction Schedule

Completed

Start

31-May-2026, 10:00 am

End

01-Jun-2026, 10:00 am

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
ESTEEM360 ZONE PRIVATE LIMITED   Under PMA
-07-02-2026 13:48:35
2
M K INFO SYSTEMS PRIVATE LIMITED   Under PMA
-06-02-2026 12:53:10
3
SVNT INFOTECH PRIVATE LIMITED   Under PMA
-06-02-2026 16:02:38

Financial Results

Rank Seller Price Item
L1
M K INFO SYSTEMS PRIVATE LIMITED(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : TSU1357001,TSU1357002,TSU1357003,TSU1357004,TSU1357005,TSU1357006,TSU1357007,TSU1357008,TSU1357009,
L2
SVNT INFOTECH PRIVATE LIMITED (MSE)( MSE Social Category:General )    Under PMA
Item Categories : TSU1357001,TSU1357002,TSU1357003,TSU1357004,TSU1357005,TSU1357006,TSU1357007,TSU1357008,TSU1357009,