TenderDekho Logo
Active GEM

Tender Notice for Comprehensive Annual Maintenance Contract of 1.5 TR split type AC units of various makes For 1st Ye in NORTH CACHAR HILLS, ASSAM

Bid Publish Date

03-Sep-2026, 6:32 pm

Bid End Date

25-Sep-2026, 3:00 pm

EMD

₹1,45,410

Value

₹72,70,494

Progress

Issue03-Sep-2026, 6:32 pm
AwardPending

Airports Authority Of India has released a public tender for Comprehensive Annual Maintenance Contract of 1. 5 TR split type AC units of various makes For 1st Ye in NORTH CACHAR HILLS, ASSAM. Quantity: 422. Submission Deadline: 25-09-2026 15: 00: 00. Download documents and apply online.

Tender Data

Bid Details

Quantity

422

Category

Comprehensive Annual Maintenance Contract of 1.5 TR split type AC units of various makes For 1st Year

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

4 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

80 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

730

Delivery Locations

1

Delivery Cities

Cachar

Delivery Pincodes

788109

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Amit Kumar Singh788109,O/o Airport Director Airports Authority of India Silchar AirportCacharAssam78810939730-

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9845194.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

North East Region

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 53 Items Sign in for GEM prices

#1

Comprehensive Annual Maintenance Contract of 1.5 TR split type AC units of various makes For 1st Year

Comprehensive Annual Maintenance Contract of 1.5 TR split type AC units of various makes including replacement of capacitors, Compressors, Gas charging along with all necessary consumables and spares etc. as and when required basis including attending the complaints/faults/breakdowns breakdown calls complete as required. (Rate per Machine per Annum) a) For 1st Year

39 each Delivery: 730 days
#2

Comprehensive Annual Maintenance Contract of 1.5 TR split type AC units of various makes For 2nd Year

Comprehensive Annual Maintenance Contract of 1.5 TR split type AC units of various makes including replacement of capacitors, Compressors, Gas charging along with all necessary consumables and spares etc. as and when required basis including attending the complaints/faults/breakdowns breakdown calls complete as required. (Rate per Machine per Annum) b) For 2nd Year

39 each Delivery: 730 days
#3

Comprehensive Annual Maintenance Contract of 2 TR split type AC units For 1st Year

Comprehensive Annual Maintenance Contract of 2 TR split type AC units including replacement of capacitors, Compressors, Gas charging along with all necessary consumables and spares etc. as and when required basis including attending the complaints/faults/breakdowns breakdown calls complete as required. MAKE - HITACHI / CARRIER (Rate per Machine per Annum) a) For 1st Year

5 each Delivery: 730 days
#4

Comprehensive Annual Maintenance Contract of 2 TR split type AC units For 2nd Year

Comprehensive Annual Maintenance Contract of 2 TR split type AC units including replacement of capacitors, Compressors, Gas charging along with all necessary consumables and spares etc. as and when required basis including attending the complaints/faults/breakdowns breakdown calls complete as required. MAKE - HITACHI / CARRIER (Rate per Machine per Annum) b) For 2nd Year

5 each Delivery: 730 days
#5

Comprehensive Annual Maintenance Contract of 3 TR DUCTABLE split type AC units For 1st Year

Comprehensive Annual Maintenance Contract of 3 TR DUCTABLE split type AC units including replacement of capacitors, Compressors, Gas charging along with all necessary consumables and spares etc. as and when required basis including attending the complaints/faults/breakdowns breakdown calls complete as required. MAKE - BLUE STAR. (Rate per Machine per Annum) a) For 1st Year

2 each Delivery: 730 days
#6

Comprehensive Annual Maintenance Contract of 3 TR DUCTABLE split type AC units For 2nd Year

Comprehensive Annual Maintenance Contract of 3 TR DUCTABLE split type AC units including replacement of capacitors, Compressors, Gas charging along with all necessary consumables and spares etc. as and when required basis including attending the complaints/faults/breakdowns breakdown calls complete as required. MAKE - BLUE STAR. (Rate per Machine per Annum) b) For 2nd Year

2 each Delivery: 730 days
#7

Comprehensive Annual Maintenance Contract of 8.5 TR DUCTABLE split type AC units For 1st Year

Comprehensive Annual Maintenance Contract of 8.5 TR DUCTABLE split type AC units including replacement of capacitors, Compressors, Gas charging along with all necessary consumables and spares etc. as and when required basis including attending breakdown calls complete as required. MAKE - BLUE STAR. (Rate per Machine per Annum) a) For 1st Year

4 each Delivery: 730 days
#8

Comprehensive Annual Maintenance Contract of 8.5 TR DUCTABLE split type AC units For 2nd Year

Comprehensive Annual Maintenance Contract of 8.5 TR DUCTABLE split type AC units including replacement of capacitors, Compressors, Gas charging along with all necessary consumables and spares etc. as and when required basis including attending breakdown calls complete as required. MAKE - BLUE STAR. (Rate per Machine per Annum) b) For 2nd Year

4 each Delivery: 730 days
#9

Comprehensive Annual Maintenance Contract of air cooled modular type VRVor VRF OUTDOOR UNITS of 14 HP capacity For 1st Year

Comprehensive Annual Maintenance Contract of air cooled modular type VRV/VRF OUTDOOR UNITS of 14 HP capacity including condensing units, each comprising of multiple scroll compressors all inverter driven including full charge with refrigerant gas (R-410a) when ever required including AICMC of AHU kit and all related accessories complete as required. MAKE - LG (Rate per Machine per Annum) a) For 1st Year

1 each Delivery: 730 days
#10

Comprehensive Annual Maintenance Contract of air cooled modular type VRV or VRF OUTDOOR UNITS of 14 HP capacity For 2nd Year

Comprehensive Annual Maintenance Contract of air cooled modular type VRV/VRF OUTDOOR UNITS of 14 HP capacity including condensing units, each comprising of multiple scroll compressors all inverter driven including full charge with refrigerant gas (R-410a) when ever required including AICMC of AHU kit and all related accessories complete as required. MAKE - LG (Rate per Machine per Annum) b) For 2nd Year

1 each Delivery: 730 days
#11

Comprehensive Annual Maintenance Contract of air cooled modular type VRV or VRF OUTDOOR UNITS of 16 HP capacity For 1st Year

Comprehensive Annual Maintenance Contract of air cooled modular type VRV/VRF OUTDOOR UNITS of 16 HP capacity including condensing units, each comprising of multiple scroll compressors all inverter driven including full charge with refrigerant gas (R-410a) when ever required including AICMC of AHU kit and all related accessories complete as required. MAKE - BLUE STAR / HAIER (Rate per Machine per Annum) a) For 1st Year

5 each Delivery: 730 days
#12

Comprehensive Annual Maintenance Contract of air cooled modular type VRV or VRF OUTDOOR UNITS of 16 HP capacity For 2nd Year

Comprehensive Annual Maintenance Contract of air cooled modular type VRV/VRF OUTDOOR UNITS of 16 HP capacity including condensing units, each comprising of multiple scroll compressors all inverter driven including full charge with refrigerant gas (R-410a) when ever required including AICMC of AHU kit and all related accessories complete as required. MAKE - BLUE STAR / HAIER (Rate per Machine per Annum) b) For 2nd Year

5 each Delivery: 730 days
#13

Comprehensive Annual Maintenance Contract of air cooled modular type VRV or VRF OUTDOOR UNITS of 18 HP capacity For 2nd Year

Comprehensive Annual Maintenance Contract of air cooled modular type VRV/VRF OUTDOOR UNITS of 18 HP capacity including condensing units, each comprising of multiple scroll compressors all inverter driven including full charge with refrigerant gas (R-410a) when ever required including AICMC of AHU kit and all related accessories complete as required. MAKE - LG NOTE - CAMC will be commence on after completion of Defect Liability Period from the date of completion of SITC work. (Rate per Machine per Annum) a) For 2nd Year

3 each Delivery: 730 days
#14

Comprehensive Annual Maintenance Contract of air cooled modular type VRV or VRF OUTDOOR UNITS of 20 HP capacity For 1st Year

Comprehensive Annual Maintenance Contract of air cooled modular type VRV/VRF OUTDOOR UNITS of 20 HP capacity including condensing units, each comprising of multiple scroll compressors all inverter driven including full charge with refrigerant gas (R-410a) when ever required including AICMC of AHU kit and all related accessories complete as required. MAKE - BLUE STAR (Rate per Machine per Annum) a) For 1st Year

5 each Delivery: 730 days
#15

Comprehensive Annual Maintenance Contract of air cooled modular type VRV or VRF OUTDOOR UNITS of 20 HP capacity For 2nd Year

Comprehensive Annual Maintenance Contract of air cooled modular type VRV/VRF OUTDOOR UNITS of 20 HP capacity including condensing units, each comprising of multiple scroll compressors all inverter driven including full charge with refrigerant gas (R-410a) when ever required including AICMC of AHU kit and all related accessories complete as required. MAKE - BLUE STAR (Rate per Machine per Annum) b) For 2nd Year

5 each Delivery: 730 days
#16

Comprehensive Annual Maintenance Contract of air cooled modular type VRV or VRF OUTDOOR UNITS of 22 HP capacity For 2nd Year

Comprehensive Annual Maintenance Contract of air cooled modular type VRV/VRF OUTDOOR UNITS of 22 HP capacity including condensing units, each comprising of multiple scroll compressors all inverter driven including full charge with refrigerant gas (R-410a) when ever required including AICMC of AHU kit and all related accessories complete as required. MAKE - VOLTAS NOTE - CAMC will be commence on after completion of Defect Liability Period from the date of completion of SITC work. (Rate per Machine per Annum) a) For 2nd Year

3 each Delivery: 730 days
#17

Comprehensive Annual Maintenance Contract of air cooled modular type VRV or VRF OUTDOOR UNITS of 24 HP capacity For 1st Year

Comprehensive Annual Maintenance Contract of air cooled modular type VRV/VRF OUTDOOR UNITS of 24 HP capacity including condensing units, each comprising of multiple scroll compressors all inverter driven including full charge with refrigerant gas (R-410a) when ever required including AICMC of AHU kit and all related accessories complete as required. MAKE - BLUE STAR (Rate per Machine per Annum) a) For 1st Year

1 each Delivery: 730 days
#18

Comprehensive Annual Maintenance Contract of air cooled modular type VRV or VRF OUTDOOR UNITS of 24 HP capacity For 2nd Year

Comprehensive Annual Maintenance Contract of air cooled modular type VRV/VRF OUTDOOR UNITS of 24 HP capacity including condensing units, each comprising of multiple scroll compressors all inverter driven including full charge with refrigerant gas (R-410a) when ever required including AICMC of AHU kit and all related accessories complete as required. MAKE - BLUE STAR (Rate per Machine per Annum) b) For 2nd Year

1 each Delivery: 730 days
#19

Comprehensive Annual Maintenance Contract of VRV ceiling suspended Cassettes type Indoor units up to 3TR capacity For 1st Year

Comprehensive Annual Maintenance Contract of VRV ceiling suspended Cassettes type Indoor units up to 3TR capacity including condensing units, each comprising of multiple scroll compressors all inverter driven including full charge with refrigerant gas (R-410a) along with all necessary consumables and spares etc. as and when required basis including attending breakdown calls complete as required. MAKE - HAIER / BLUE STAR (Rate per Machine per Annum) a) For 1st Year

19 each Delivery: 730 days
#20

Comprehensive Annual Maintenance Contract of VRV ceiling suspended Cassettes type Indoor units up to 3TR capacity For 2nd Year

Comprehensive Annual Maintenance Contract of VRV ceiling suspended Cassettes type Indoor units up to 3TR capacity including condensing units, each comprising of multiple scroll compressors all inverter driven including full charge with refrigerant gas (R-410a) along with all necessary consumables and spares etc. as and when required basis including attending breakdown calls complete as required. MAKE - HAIER / BLUE STAR (Rate per Machine per Annum) b) For 2nd Year

19 each Delivery: 730 days
#21

Comprehensive Annual Maintenance Contract of VRV ceiling suspended 4 way Cassettes type Indoor units from 2.6TR to 3.2TR capacity For 2nd Year

Comprehensive Annual Maintenance Contract of VRV ceiling suspended 4 way Cassettes type Indoor units from 2.6TR to 3.2TR capacity including condensing units, each comprising of multiple scroll compressors all inverter driven including full charge with refrigerant gas (R-410a) along with all necessary consumables and spares etc. as and when required basis including attending breakdown calls complete as required. MAKE - LG / VOLTAS NOTE - CAMC of will be commence on after completion of Defect Liability Period from the date of completion of SITC work. (Rate per Machine per Annum) a) For 2nd Year

32 each Delivery: 730 days
#22

Comprehensive Annual Maintenance Contract of Hi Wall AC of 1.6 TR capacity For 1st Year

Comprehensive Annual Maintenance Contract of Hi-Wall AC of 1.6 TR capacity including condensing units, each comprising of multiple scroll compressors all inverter driven including full charge with refrigerant gas (R-410a) along with all necessary consumables and spares etc. as and when required basis including attending breakdown calls complete as required. MAKE - BLUE STAR (Rate per Machine per Annum) a) For 1st Year

17 each Delivery: 730 days
#23

Comprehensive Annual Maintenance Contract of Hi Wall AC of 1.6 TR capacity For 2nd Year

Comprehensive Annual Maintenance Contract of Hi-Wall AC of 1.6 TR capacity including condensing units, each comprising of multiple scroll compressors all inverter driven including full charge with refrigerant gas (R-410a) along with all necessary consumables and spares etc. as and when required basis including attending breakdown calls complete as required. MAKE - BLUE STAR (Rate per Machine per Annum) b) For 2nd Year

17 each Delivery: 730 days
#24

Comprehensive Annual Maintenance Contract of floor mounted sheet metal sectionalized construction Air Handling Unit of 13000 CFM capacity For 1st Year

Comprehensive Annual Maintenance Contract of floor mounted sheet metal sectionalized construction Air Handling Unit of 13000 CFM capacity along with all related accessories complete as required. MAKE - EDGETECH (Rate per Machine per Annum) a) For 1st Year

2 each Delivery: 730 days
#25

Comprehensive Annual Maintenance Contract of floor mounted sheet metal sectionalized construction Air Handling Unit of 13000 CFM capacity For 2nd Year

Comprehensive Annual Maintenance Contract of floor mounted sheet metal sectionalized construction Air Handling Unit of 13000 CFM capacity along with all related accessories complete as required. MAKE - EDGETECH (Rate per Machine per Annum) b) For 2nd Year

2 each Delivery: 730 days
#26

Comprehensive Annual Maintenance Contract of floor mounted sheet metal sectionalized construction Air Handling Unit of 15000 CFM capacity For 1st Year

Comprehensive Annual Maintenance Contract of floor mounted sheet metal sectionalized construction Air Handling Unit of 15000 CFM capacity along with all related accessories complete as required. MAKE - EDGETECH (Rate per Machine per Annum) a) For 1st Year

1 each Delivery: 730 days
#27

Comprehensive Annual Maintenance Contract of floor mounted sheet metal sectionalized construction Air Handling Unit of 15000 CFM capacity For 2nd Year

Comprehensive Annual Maintenance Contract of floor mounted sheet metal sectionalized construction Air Handling Unit of 15000 CFM capacity along with all related accessories complete as required. MAKE - EDGETECH (Rate per Machine per Annum) b) For 2nd Year

1 each Delivery: 730 days
#28

Comprehensive Annual Maintenance Contract of 40 or 60 Ltrs Water Cooler For 1st Year

Comprehensive Annual Maintenance Contract of 40/60 Ltrs. Water Cooler including replacement of capacitors, Compressors, Gas charging along with all necessary consumables etc. as and when required basis including attending the complaints/faults/breakdowns breakdown calls complete as required. MAKE - VOLTAS (Rate per Machine per Annum) a) For 1st Year

1 each Delivery: 730 days
#29

Comprehensive Annual Maintenance Contract of 40 or 60 Ltrs Water Cooler For 2nd Year

Comprehensive Annual Maintenance Contract of 40/60 Ltrs. Water Cooler including replacement of capacitors, Compressors, Gas charging along with all necessary consumables etc. as and when required basis including attending the complaints/faults/breakdowns breakdown calls complete as required. MAKE - VOLTAS (Rate per Machine per Annum) b) For 2nd Year

1 each Delivery: 730 days
#30

Comprehensive Annual Maintenance Contract of 60 or 80 Ltrs Water Cooler For 1st Year

Comprehensive Annual Maintenance Contract of 60/80 Ltrs. Water Cooler including replacement of capacitors, Compressors, Gas charging along with all necessary consumables etc. as and when required basis including attending the complaints/faults/breakdowns breakdown calls complete as required. MAKE - BLUE STAR (Rate per Machine per Annum) a) For 1st Year

1 each Delivery: 730 days
#31

Comprehensive Annual Maintenance Contract of 60 or 80 Ltrs Water Cooler For 2nd Year

Comprehensive Annual Maintenance Contract of 60/80 Ltrs. Water Cooler including replacement of capacitors, Compressors, Gas charging along with all necessary consumables etc. as and when required basis including attending the complaints/faults/breakdowns breakdown calls complete as required. MAKE - BLUE STAR (Rate per Machine per Annum) b) For 2nd Year

1 each Delivery: 730 days
#32

Comprehensive Annual Maintenance Contract of 150 Ltrs storage capacity Water Cooler For 1st Year

Comprehensive Annual Maintenance Contract of 150 Ltrs. storage capacity Water Cooler including replacement of capacitors, Compressors, Gas charging along with all necessary consumables etc. as and when required basis including attending the complaints/faults/breakdowns breakdown calls complete as required. MAKE - USHA (Rate per Machine per Annum) a) For 1st Year

1 each Delivery: 730 days
#33

Comprehensive Annual Maintenance Contract of 150 Ltrs storage capacity Water Cooler For 2nd Year

Comprehensive Annual Maintenance Contract of 150 Ltrs. storage capacity Water Cooler including replacement of capacitors, Compressors, Gas charging along with all necessary consumables etc. as and when required basis including attending the complaints/faults/breakdowns breakdown calls complete as required. MAKE - USHA (Rate per Machine per Annum) b) For 2nd Year

1 each Delivery: 730 days
#34

Comprehensive Annual Maintenance Contract of RO purifiers of capacity 10LPH For 1st Year

Comprehensive Annual Maintenance Contract of RO purifiers of capacity 10LPH installed at various locations i/c providing and replacing all necessary consumabales, spares complete as required. The scope of CMC also covers replacement of prefilter, membrane once in a year & upto the satisfaction of EIC. MAKE - AQUA GUARD (Rate per Machine per Annum) a) For 1st Year

2 each Delivery: 730 days
#35

Comprehensive Annual Maintenance Contract of RO purifiers of capacity 10LPH For 2nd Year

Comprehensive Annual Maintenance Contract of RO purifiers of capacity 10LPH installed at various locations i/c providing and replacing all necessary consumabales, spares complete as required. The scope of CMC also covers replacement of prefilter, membrane once in a year & upto the satisfaction of EIC. MAKE - AQUA GUARD (Rate per Machine per Annum) a) For 2nd Year

2 each Delivery: 730 days
#36

Comprehensive Annual Maintenance Contract of RO purifiers of capacity 25LPH For 1st Year

Comprehensive Annual Maintenance Contract of RO purifiers of capacity 25LPH installed at various locations i/c providing and replacing all necessary consumables, spares complete as required. The scope of CMC also covers replacement of pre filter, membrane once in a year & up to the satisfaction of EIC. MAKE - KENT (Rate per Machine per Annum) a) For 1st Year

2 each Delivery: 730 days
#37

Comprehensive Annual Maintenance Contract of RO purifiers of capacity 25LPH For 2nd Year

Comprehensive Annual Maintenance Contract of RO purifiers of capacity 25LPH installed at various locations i/c providing and replacing all necessary consumables, spares complete as required. The scope of CMC also covers replacement of pre filter, membrane once in a year & up to the satisfaction of EIC. MAKE - KENT (Rate per Machine per Annum) b) For 2nd Year

2 each Delivery: 730 days
#38

Comprehensive Annual Maintenance Contract of RO purifiers of capacity 50LPH For 1st Year

Comprehensive Annual Maintenance Contract of RO purifiers of capacity 50LPH installed at various locations i/c providing and replacing all necessary consumables, spares complete as required. The scope of CMC also covers replacement of pre filter, membrane once in a year & up to the satisfaction of EIC. MAKE - KENT (Rate per Machine per Annum) a) For 1st Year

4 each Delivery: 730 days
#39

Comprehensive Annual Maintenance Contract of RO purifiers of capacity 50LPH For 2nd Year

Comprehensive Annual Maintenance Contract of RO purifiers of capacity 50LPH installed at various locations i/c providing and replacing all necessary consumables, spares complete as required. The scope of CMC also covers replacement of pre filter, membrane once in a year & up to the satisfaction of EIC. MAKE - KENT (Rate per Machine per Annum) b) For 2nd Year

4 each Delivery: 730 days
#40

Comprehensive Annual Maintenance Contract of RO purifiers of capacity 50LPH 5 Stage filteration system For 2nd Year

Comprehensive Annual Maintenance Contract of RO purifiers of capacity 50LPH, 5 Stage filteration system installed at various locations i/c providing and replacing all necessary consumables, spares complete as required. The scope of CMC also covers replacement of pre filter, membrane once in a year & up to the satisfaction of EIC. MAKE - WAE NOTE - CAMC of will be commence on after completion of Defect Liability Period from the date of completion of SITC work. (Rate per Machine per Annum) a) For 2nd Year

3 each Delivery: 730 days
#41

Comprehensive Annual Maintenance Contract of water fountain with single bubbler For 1st Year

Comprehensive Annual Maintenance Contract of water fountain with single bubbler comprising of preventive maintenance, breakdown maintenance, attending emergency calls etc.and including all necessary spares and consumables to keep the water fountain in perfect working condition as required. MAKE - WFS OASIS (Rate per Machine per Annum) a) For 1st Year

4 each Delivery: 730 days
#42

Comprehensive Annual Maintenance Contract of water fountain with single bubbler For 2nd Year

Comprehensive Annual Maintenance Contract of water fountain with single bubbler comprising of preventive maintenance, breakdown maintenance, attending emergency calls etc.and including all necessary spares and consumables to keep the water fountain in perfect working condition as required. MAKE - WFS OASIS (Rate per Machine per Annum) b) For 2nd Year

4 each Delivery: 730 days
#43

Comprehensive Annual Maintenance Contract of bi level drinking water fountain with bottle filler facility for 2nd year

Comprehensive Annual Maintenance Contract of bi-level drinking water fountain with bottle filler facility comprising of preventive maintenance,breakdown maintenance,attending emergency calls etc. and including all necessary spares and consumables to keep the water fountain in perfect working condition as required. MAKE - WFS OASIS NOTE - CAMC of will be commence on after completion of Defect Liability Period from the date of completion of SITC work. (Rate per Machine per Annum) a) For 2nd Year

3 each Delivery: 730 days
#44

Comprehensive Annual Maintenance Contract of RO plus UV based 80 Ltr Storage with cooling capacity 60LPH Integrated Water cooler cum purifier installed at various locations For 1st Year

Comprehensive Annual Maintenance Contract of RO+UV based 80 Ltr. Storage with cooling capacity 60LPH Integrated Water cooler cum purifier installed at various locations i/c providing and replacing all necessary consumables, spares complete as required. The scope of CMC also covers replacement of pre filter, membrane once in a year & up to the satisfaction of EIC. MAKE - BLUE STAR / AQUA GUARD (Rate per Machine per Annum) a) For 1st Year

6 each Delivery: 730 days
#45

Comprehensive Annual Maintenance Contract of RO plus UV based 80 Ltr Storage with cooling capacity 60LPH Integrated Water cooler cum purifier installed at various locations For 2nd Year

Comprehensive Annual Maintenance Contract of RO+UV based 80 Ltr. Storage with cooling capacity 60LPH Integrated Water cooler cum purifier installed at various locations i/c providing and replacing all necessary consumables, spares complete as required. The scope of CMC also covers replacement of pre filter, membrane once in a year & up to the satisfaction of EIC. MAKE - BLUE STAR / AQUA GUARD (Rate per Machine per Annum) b) For 2nd Year

6 each Delivery: 730 days
#46

Shifting reinstallation testing and commissioning of 1.5 TR or 2 TR split AC Indoor and Outdoor

Shifting, reinstallation, testing & commissioning of 1.5 TR/2 TR /split AC (Indoor & Outdoor) including supply and fixing of required copper pipe, drain pipe, power supply cable, fresh gas charging (if required) with suitable refrigerant gas complete as required.

5 job Delivery: 730 days
#47

Dismantling or Uninstallation of 1.5 TR or 2 TR or split AC Indoor and Outdoor

Dismantling/Un-installation of 1.5 TR/2 TR /split AC (Indoor & Outdoor) including removal of copper pipe, drain pipe, power supply cable etc and transporting and storing at desired location up to the satisfaction of EIC complete as required.

5 job Delivery: 730 days
#48

Supplying and laying of heavy duty CPVC drainpipe of size 25mm dia for condensate drain for water of AC

Supplying and laying of heavy duty CPVC drainpipe of size 25mm dia for condensate drain for water of AC including socket bends and necessary fixing arrangement on wall/floor etc complete as required.

50 mtr Delivery: 730 days
#49

Supply and fixing copper refrigerant piping size of 0.5 Inch upto 1.5 TR split AC with insulation up to outdoor unit etc

Supply and fixing copper refrigerant piping size of 1/2 Inch upto 1.5 TR split AC with insulation up to outdoor unit etc. as required & as per direction of EIC.

20 mtr Delivery: 730 days
#50

Supply and fixing copper refrigerant piping size of 0.25 Inch upto 2 TR split AC with insulation up to outdoor unit etc

Supply and fixing copper refrigerant piping size of 1/4 Inch upto 2 TR split AC with insulation up to outdoor unit etc. as required & as per direction of EIC.

20 mtr Delivery: 730 days
#51

Supply and fixing copper refrigerant piping size of 0.625 Inch upto 2 TR split AC with insulation up to outdoor unit etc

Supply and fixing copper refrigerant piping size of 5/8 Inch upto 2 TR split AC with insulation up to outdoor unit etc. as required & as per direction of EIC.

10 mtr Delivery: 730 days
#52

Day to day operation of all types of Window or split or ductable split and VRV or VRF type HVAC system all types of water cooler cum purifiers and drinking water fountain for 1st year

Day to day operation of all types of Window/split/ductable split & VRV/VRF type HVAC system, all types of water cooler cum purifiers and drinking water fountain installed at various locations on daily basis and taking prompt action to report the concerned personnel for rectification action ensuring serviceability/satisfactory working condition & maintenance of record/documentations etc complete as required by engaging following manpower in 8 hours shifts basis on all days including Sundays & National Holidays as per direction of EIC - 01 No. Skilled, 01 No. Semi skilled 01 No. Unskilled a) For 1st Year

12 month Delivery: 730 days
#53

Day to day operation of all types of Window or split or ductable split and VRV or VRF type HVAC system all types of water cooler cum purifiers and drinking water fountain for 2nd year

Day to day operation of all types of Window/split/ductable split & VRV/VRF type HVAC system, all types of water cooler cum purifiers and drinking water fountain installed at various locations on daily basis and taking prompt action to report the concerned personnel for rectification action ensuring serviceability/satisfactory working condition & maintenance of record/documentations etc complete as required by engaging following manpower in 8 hours shifts basis on all days including Sundays & National Holidays as per direction of EIC - 01 No. Skilled, 01 No. Semi skilled 01 No. Unskilled b) For 2nd Year

12 month Delivery: 730 days

Categories 91

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data