Ready Relevent and Resurgent,1962 The war was not,India peace keeping force in srilanka,Interventio
Indian Army
FAIZABAD, UTTAR PRADESH
Bid Publish Date
06-Jan-2026, 8:32 pm
Bid End Date
16-Jan-2026, 9:00 pm
Location
Progress
Quantity
17
Category
1962 The war that was not by Shiv Kunal Verma
Bid Type
Two Packet Bid
The Indian Army (Department Of Military Affairs) in POONCH, JAMMU & KASHMIR seeks procurement related to books under a formal tender process. The scope includes varied titles (17 BOQ items) with mandatory pre-bid meeting and sample submission. Estimated value is not disclosed; quantity adjustments allowed up to 25% per order. Compliance with GST, MSME, and PAN are required to participate. The contract emphasizes delivery timelines linked to order dates and option-based extensions, with strict ATC compliance for bidders. This procurement targets reputable suppliers of academic and military history literature, seeking reliable fulfillment for institutional libraries and training centers, with emphasis on document authenticity and timely delivery.
Product/service names: Books (educational/military history) as per BOQ
Quantities: 17 items in BOQ (exact quantities not disclosed)
EMD/Estimated value: Not disclosed in available data
Experience: Minimum three years for past similar procurements
Standards/Compliance: GST, MSME, PAN, and item-specific conformance
Delivery: Option to increase quantity up to 25% with extended timelines
Warranty/Support: Not specified in provided data
Pre-bid meeting is mandatory for participation
ATC: submission of GST, MSME, turnover and experience certificates
Delivery quantity flexibility up to 25% at contracted rates
Sample submission required before technical bid opening
Not explicitly stated; bidders should follow standard government tender terms and ensure compliance with EMD/security deposits and delivery-linked payments as per contract.
Delivery period tied to last date of original delivery order; additional time calculated as (increased quantity/original quantity) × original period, minimum 30 days.
Not specified in provided data; standard LD clauses may apply per Indian Army procurement terms.
Must participate in mandatory pre-bid meeting
Must provide GST, PAN, MSME certificates and last three years’ experience certificates
Must submit samples before technical bid opening
Indian Army
FAIZABAD, UTTAR PRADESH
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
Indian Army
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | 1962 The war that was not by Shiv Kunal Verma | 1962 The war that was not by Shiv Kunal Verma | 1 | pieces | ocfri@39rr | 15 |
| 2 | Indian peace keeping force in Sri Lanka by Dipender Singh | Indian peace keeping force in Sri Lanka by Dipender Singh | 1 | pieces | ocfri@39rr | 15 |
| 3 | Unrestricted Warfare Chines Master Plan to Destroy America by Col Qiao Liang and Col Wang Xiangsui | Unrestricted Warfare Chines Master Plan to Destroy America by Col Qiao Liang and Col Wang Xiangsui | 1 | pieces | ocfri@39rr | 15 |
| 4 | Himalayan Blunder by Brig JP Dalvi | Himalayan Blunder by Brig JP Dalvi | 1 | pieces | ocfri@39rr | 15 |
| 5 | Intervention in Sri Lanka the IPKF Experience re told by Maj Gen Harkirat Singh | Intervention in Sri Lanka the IPKF Experience re told by Maj Gen Harkirat Singh | 1 | pieces | ocfri@39rr | 15 |
| 6 | Defeat into Victory Battling Japan in Burma and India 1942 45 by field Marshal Viscount Slim | Defeat into Victory Battling Japan in Burma and India 1942 45 by field Marshal Viscount Slim | 1 | pieces | ocfri@39rr | 15 |
| 7 | Strategy The Indirect Approach by Liddle Heart | Strategy The Indirect Approach by Liddle Heart | 1 | pieces | ocfri@39rr | 15 |
| 8 | End of Empire British and the Japanese Invasion of India 1944 by Robert Lyman | End of Empire British and the Japanese Invasion of India 1944 by Robert Lyman | 1 | pieces | ocfri@39rr | 15 |
| 9 | Official History of Operations in Jammu and Kashmir 1947 48 by Dr S N Prasad and Shri Dharam Pal | Official History of Operations in Jammu and Kashmir 1947 48 by Dr S N Prasad and Shri Dharam Pal | 1 | pieces | ocfri@39rr | 15 |
| 10 | Field Marshal KM Cariappa His Life and Time By Brig CB Khanduri | Field Marshal KM Cariappa His Life and Time By Brig CB Khanduri | 1 | pieces | ocfri@39rr | 15 |
| 11 | Slender was the thread Kashmir Confrontation 1947 48 by Lt Gen LP Sen | Slender was the thread Kashmir Confrontation 1947 48 by Lt Gen LP Sen | 1 | pieces | ocfri@39rr | 15 |
| 12 | Grey Zone Warfare Way ahead for India by Lt Gen Dushiyant Singh | Grey Zone Warfare Way ahead for India by Lt Gen Dushiyant Singh | 1 | pieces | ocfri@39rr | 15 |
| 13 | Kitne Gazi Aye Kitne Gazi Gaye By Lt Gen KJS Dhilon | Kitne Gazi Aye Kitne Gazi Gaye By Lt Gen KJS Dhilon | 1 | pieces | ocfri@39rr | 15 |
| 14 | Living Gita | Living Gita | 1 | pieces | ocfri@39rr | 15 |
| 15 | The Complete Selection of Swamy Vivekananda | The Complete Selection of Swamy Vivekananda | 1 | pieces | ocfri@39rr | 15 |
| 16 | Prakriti Acharya Prashant | Prakriti Acharya Prashant | 1 | pieces | ocfri@39rr | 15 |
| 17 | The power of Positive Mind | The power of Positive Mind | 1 | pieces | ocfri@39rr | 15 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Last three years experience certificates
MSME certificate
Annual turnover certificate
MII certificate
Sample documents to be submitted before opening of technical bid
OEM authorization (if applicable)
Key insights about JAMMU AND KASHMIR tender market
Bidders must attend the mandatory pre-bid meeting, submit samples before bid opening, and provide GST, PAN, MSME certificates, and last three years’ experience certificates. Ensure conformity with item specifications and OEM authorizations where applicable, and follow delivery terms linked to order dates.
Submit GST certificate, PAN card, MSME certificate, last three years experience certificates, annual turnover certificate, MII certificate, and pre-bid meeting attendance proof. Include samples prior to technical bid opening and any OEM authorizations relevant to the supplied titles.
Delivery begins from the last date of the original delivery order. If quantity increases by up to 25%, additional time is calculated as (increased quantity/original quantity) × original period, with a minimum of 30 days.
Yes, the purchaser may increase or decrease quantity up to 25% at the bid quantity and during the currency of the contract at contracted rates, ensuring delivery timelines adjust accordingly.
Bidders must provide GST and MSME certificates, PAN, and annual turnover certificate. In some cases, MII certificates and OEM authorizations may be required to demonstrate compliance with item-specific specifications.
The pre-bid meeting is compulsory and enables bidders to clarify scope, present samples, and align on submission requirements. Attendees gain key insights into the 17 BOQ items and ATC clauses, ensuring bid compliance.
Samples must be provided before opening of the technical bid. They should demonstrate conformity with item specifications and be accompanied by the bidder’s documentation package including GST, PAN, MSME, and experience certificates.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS