Bid Publish Date
17-Aug-2026, 12:12 pm
Bid End Date
02-Sep-2026, 11:00 am
Location
Progress
Bharatiya Rail Bijlee Company Limited invites bids for a Wave Trap component (category 313A2503) with OEM eligibility restricted to GE Vernova T&D India Limited or its authorized channel partners. No BOQ items are listed, and the estimated value and EMD are not disclosed in the available data. The procurement emphasizes an OEM-verified supply path and adherence to the purchaser’s option clause, allowing quantity adjustments up to 25% of the bid/contracted quantity. Delivery timelines will align with the original delivery order and may extend proportionally if options are exercised, with a minimum extension of 30 days. The opportunity is prepared as a software-enabled tender reserved for OEMs, underscoring strict vendor eligibility and compliance with OEM authorization requirements.
Key differentiators include the OEM-only participation rule, the potential for quarterly quantity flex, and the extended delivery framework tied to option exercise. This tender requires bidders to align with the purchaser’s delivery-calendar logic and minimum extension constraints, ensuring predictable project sequencing. Overall, bidders should prepare for a highly OEM-centric process with strict channel partner alignment and delivery planning.
Product/service names: Wave Trap (313A2503 category)
Quantities/values: not disclosed in tender data
EMD/estimated value: not disclosed
Experience: prior supply of wave trap or related high-voltage protection equipment advisable
Standards/Certification: OEM authorization requirement explicitly stated; no other standards listed
Delivery/installation: subject to last delivery order date with option-based extensions
OEM-only tender restricted to GE Vernova T&D India Limited or authorized partners
Quantity may change by up to 25% at contract placement and during currency
Delivery extensions calculated by a specified formula with a 30-day minimum
Not disclosed in the provided data; standard OEM procurement terms likely apply per GE Vernova T&D India Limited guidelines
Delivery period starts from the last date of original delivery order; extended delivery period if option exercised; minimum extension 30 days
Not specified in the available tender data
Must be GE Vernova T&D India Limited or an authorized channel partner
Demonstrate OEM authorization and past experience in wave trap or equivalent equipment
Comply with delivery extension and quantity variation terms
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
WAVE TRAP, 313A2503, GE/ALSTOM, 1.0/3150- M8583952218
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Aurangabad
Delivery Pincodes
824303
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Gajendra Singh Bandi | 824303,Bhartiya Rail Bijlee Company Limited- A subsidiary of NTPC Ltd. Nabinagar Khaira Thana AURANGABAD | Aurangabad | Bihar | 824303 | 1 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates in relevant wave trap supply or transformer protection equipment
Financial statements or turnover documents as required by OEM procurement
EMD/Security deposit documents (if applicable to OEM tenders)
Technical bid documents aligning with GE Vernova T&D India Limited requirements
OEM authorization letter confirming channel partnership eligibility
Key insights about BIHAR tender market
Bidders must be GE Vernova T&D India Limited or an authorized channel partner with OEM authorization. The tender permits quantity variation up to 25% and requires compliance with OEM-specific ATCs. Demonstrate relevant experience in supplying wave traps or equivalent HV protection equipment and submit standard bid documents, including GST, PAN, and financials.
Participation is restricted to the OEM GE Vernova T&D India Limited or its authorized partners. Prepare OEM authorization letters, technical bid aligned to wave trap category 313A2503, and plan for potential 25% quantity variation. Ensure delivery planning aligns with original delivery order dates and 30-day minimum extension rule.
Submit GST certificate, PAN, experience certificates for HV protection equipment, financial statements, EMD documents if applicable, OEM authorization or channel partner letter, and technical bid evidence showing compliance with OEM requirements and wave trap specifications.
No explicit technical specs published. Bidders should demonstrate OEM-aligned supply capability, familiarity with GE Vernova wave trap equipment, and ensure documentation validates OEM authorization. Expect compliance with OEM installation and operational standards as per GE Vernova guidelines.
Delivery starts from the last date of the original delivery order. If options are exercised, extension time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days; extensions may extend to the original delivery period.
EMD details are not disclosed in the provided tender data. Bidders should prepare to meet standard EMD requirements per OEM procurement guidelines and obtain confirmation from BRBCL or the tender portal before submission.
Check the official ATC document and OEM verification letter from GE Vernova T&D India Limited. Only bids from GE Vernova or authorized partners will pass technical evaluation; non-compliant bids will be rejected at the outset.
Delivery timing hinges on the last delivery order date with potential extensions via the option clause. Minimum 30-day extension, with the possibility of extending up to the original delivery period; coordinate with BRBCL for installation windows and site readiness.