200 Ton Capacity Mobile Crane
Indian Navy
MUMBAI, MAHARASHTRA
Progress
RAQuantity
1
Bid Type
Two Packet Bid
The Indian Air Force seeks a supplier for a crane lifting frame with 2 ton capacity, encompassing supply, installation, testing, commissioning, and operator training, along with any required statutory clearances. The scope allows a flexible quantity up to 25% added during contract execution, with delivery timelines linked to the original delivery period and extended periods as described. This procurement emphasizes end-to-end deployment, including on-site training and compliance duties. The contract structure accommodates bid price that covers all cost components for the complete lifecycle of the equipment.
Crane lifting frame with 2 TON capacity
Supply, Installation, Testing, Commissioning, and Operator Training
Statutory clearances if required by procurement terms
Delivery terms include option to increase quantity by 25% and corresponding delivery extension
Past Experience proofs acceptable: contract copies with invoices or client execution certificates
ATC-compliant certificates and documents must be uploaded
Option clause permits ±25% quantity variation at placement and during contract
Scope includes installation, testing, commissioning, operator training, and statutory clearances
Past experience proofs acceptable in multiple formats; ensure ATC-compliant documentation
Not specified in data; verify in ATC and bid documents
Delivery period starts from last date of original delivery order; extended time calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days
Not specified in data; refer to ATC for LD requirements
Proven experience in supplying, installing, and commissioning crane lifting frames or equivalent equipment
Capability to provide operator training and statutory clearance support
Compliance with bid documents, ATC, and corrigenda
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Navy
MUMBAI, MAHARASHTRA
Bharat Earth Movers Limited (beml)
KOLAR, KARNATAKA
Indian Army
AHMEDNAGAR, MAHARASHTRA
Indian Army
BIKANER, RAJASTHAN
Goa Shipyard Limited
SOUTH GOA, GOA
Tender Results
Loading results...
GST registration certificate
PAN card
Past project experience proofs (contract copies with invoices, execution certificates, or equivalent)
Technical bid documents
OEM authorization letters (if applicable)
Statutory clearance documents (if required)
Bid security/EMD documentation (as per ATC)
Start
21-Nov-2025, 7:00 pm
End
22-Nov-2025, 7:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ALKA ARTS Under PMA | Make : OEM Model : CRANE LIFTING FRAME 2 TON CAPACITY Title : CRANE LIFTING FRAME 2 TON CAPACITY | 09-11-2025 19:37:51 | Disqualified |
| 2 | arihant auto parts Under PMA | Make : OEM Model : CRANE LIFTING FRAME 2 TON CAPACITY Title : CRANE LIFTING FRAME 2 TON CAPACITY | 09-11-2025 22:09:28 | Disqualified |
| 3 | ARIHANT INDUSTRIES Under PMA | Make : ARIHNAT INDUSTRIES--Arihant Industries Model : CRANE LIFTING FRAME 2 TON CAPACITY Title : CRANE LIFTING FRAME 2 TON CAPACITY | 09-11-2025 19:23:43 | Qualified |
| 4 | GOURIKA INDIA LIMITED Under PMA | Make : GOURIKA INDIA LIMITED Model : GOURIKA INDIA LIMITED Title : CRANE LIFTING FRAME 2 TON CAPACITY | 08-11-2025 12:42:57 | Disqualified |
| 5 | MAHAVIR ENTERPRISE Under PMA | Make : MAHAVIR ENTERPRISES Model : CRANE LIFTING FRAME 2 TON CAPACITY Title : CRANE LIFTING FRAME 2 TON CAPACITY | 10-11-2025 08:20:27 | Qualified |
| 6 | nimbark traders Under PMA | Make : na Model : Unbranded CRANE LIFTING FRAME 2 TON CAPACITY Title : CRANE LIFTING FRAME 2 TON CAPACITY | 08-11-2025 13:10:17 | Disqualified |
| 7 | PARSVANATH ENTERPRISE Under PMA | Make : OEM Model : CRANE LIFTING FRAME 2 TON CAPACITY Title : CRANE LIFTING FRAME 2 TON CAPACITY | 09-11-2025 14:44:01 | Disqualified |
| 8 | Servicing Works And Defence Equipment Supplier Under PMA | Make : SWADESH Model : SWADESH2047 Title : CRANE LIFTING FRAME 2 TON CAPACITY | 10-11-2025 01:02:18 | Disqualified |
| 9 | VITRAG ENTERPRISE Under PMA | Make : OEM Model : CRANE LIFTING FRAME 2 TON CAPACITY Title : CRANE LIFTING FRAME 2 TON CAPACITY | 09-11-2025 20:04:47 | Disqualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | ARIHANT INDUSTRIES(MSE,MII)( MSE Social Category:OBC ) Under PMA | ₹3,76,000 | Item Categories : CRANE LIFTING FRAME 2 TON CAPACITY |
| L2 | MAHAVIR ENTERPRISE (MII) Under PMA | ₹4,15,000 | Item Categories : CRANE LIFTING FRAME 2 TON CAPACITY |
Key insights about GUJARAT tender market
Bidders must submit GST, PAN, experience proofs, financial statements, EMD, technical bid, and OEM authorizations per ATC. The scope includes supply, installation, testing, commissioning, and operator training, with quantity variation up to 25%. Ensure documentation aligns with ATC and corrigenda for eligibility.
Required documents include GST certificate, PAN card, past project experience proofs (contracts with invoices or execution certificates), financial statements, EMD documentation, technical bid, and OEM authorizations where applicable. ATC and corrigenda may add specific certificates to upload.
The specification calls for a crane lifting frame with a 2 TON capacity. Details on dimensions, mounting, or load testing are not provided here; bidders should refer to the BOQ/ATC for precise structural dimensions, safety certifications, and IS/ISO conformance requirements.
Delivery begins from the last date of the original delivery order. If quantity increases, extended time = (increased quantity ÷ original quantity) × original delivery period, with a minimum extension of 30 days. Original delivery period may be extended up to the contract’s limits.
Acceptable proofs include contract copies with invoices and bidder self-certification, execution certificates by the client with contract value, or third-party inspection notes. These must demonstrate successful previously delivered crane-related services or equipment supplies.
Bid submissions must include all certificates and documents requested in the Bid Document, ATC, and Corrigendum. Missing documents can lead to rejection, so ensure all specified attestations, standards, and approvals are uploaded before the bid closing.
While exact standards aren’t listed here, bidders should prepare for IS/ISO-related compliance and any organization-specific certifications noted in the ATC. Verify whether IS 550 or other defense-sector standards apply in the final bid package.
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS