TenderDekho Logo
GEM

Procurement Opportunity: Sanitary Napkins Incinetator Machine with Smoke Control Unit in SHEOHAR, BIHAR

Bid Publish Date

21-Feb-2026, 7:50 pm

Bid End Date

03-Mar-2026, 8:00 pm

Progress

Issue21-Feb-2026, 7:50 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 3

A tender has been published for Sitamarhi District Panchayats Sanitary Napkins Incinetator Machine with Smoke Control Unit (Q3) in SHEOHAR, BIHAR. Quantity: 1 by. Submission Deadline: 03-03-2026 20: 00: 00. Check eligibility and apply.

Documents 4

GeM-Bidding-9026547.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Sanitary Napkins Incinetator Machine with Smoke Control Unit

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

MAU, UTTAR PRADESH

Posted: 8 May 2025
Closed: 19 May 2025
GEM

Sanitary Napkins Incinetator Machine with Smoke Control Unit

N/a

DURG, CHHATTISGARH

Posted: 4 February 2025
Closed: 10 March 2025
GEM

Sanitary Napkins Incinetator Machine with Smoke Control Unit

Bagalkot District Panchayats

BAGALKOT, KARNATAKA

Posted: 13 February 2025
Closed: 24 February 2025
GEM

Sanitary Napkins Incinetator Machine with Smoke Control Unit

E-nagar Palika Government Of Madhya Pradesh

Posted: 19 December 2024
Closed: 9 January 2025
GEM

Sanitary Napkins Incinetator Machine with Smoke Control Unit

N/a

PRATAPGARH, UTTAR PRADESH

Posted: 13 January 2025
Closed: 23 January 2025
GEM

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
GENERAL Stand provided Yes, No
DIMENSIONS OF MAIN UNIT Thickness of thermal Insulation material (mm) 25, 40
DIMENSIONS OF MAIN UNIT Thickness of MS/SS sheet of burning chamber (internal) (mm) (Min) 3, 5, 1 Or higher
DIMENSIONS OF MAIN UNIT Machine Weight(kg) 5-15, 16-30, 31-50, 51-250
DIMENSIONS OF MAIN UNIT Thickness of door including insulation (mm) 20, 25, 40, 50, 60
DIMENSIONS OF MAIN UNIT Flexible emission Outlet pipe dia (mm) 25, 40, 50, 63, 76
MATERIAL OF MACHINE UNIT Material of Housing cabinet (External) Mild Steel(CRCA) sheet, Stainless Steel sheet of SS-304 grade
MATERIAL OF MACHINE UNIT Material of Burning chamber (Internal) Mild Steel(CRCA) sheet, Stainless Steel sheet of SS-304 grade
MATERIAL OF MACHINE UNIT Material of Thermal Insulation High Density Ceramic Fiber sheet, High Density Ceramic Board
CONTROL & FUNCTIONAL FEATURES Temperature indicator provided Yes, No
CONTROL & FUNCTIONAL FEATURES Minimum Burning temperature (degree C) 800, 950
CONTROL & FUNCTIONAL FEATURES Burning Capacity per day (Number of Napkins) 15-50, 51-100, 100-200, 200-500, 500-700, 700-1000, 1000-1250
CONTROL & FUNCTIONAL FEATURES Burning Capacity at a time (Number of Napkins) 1-15, 16-25, 26-50
CONTROL & FUNCTIONAL FEATURES Burning time of full capacity Napkins/pads (minutes) (Max) 5, 10, 15, 20, 25, 30, 35, 40, 45, 50, 55, 60, 3
ELECTRICAL AND SAFETY FEATURES Automatic digital controller for time Yes, No
ELECTRICAL AND SAFETY FEATURES Automatic digital controller for temperature Yes, No
SMOKE CONTROL UNIT (SCU) Type of SCU (Smoke Control Unit) Top mounted, Side Mounted, Separate unit, Not Required
SMOKE CONTROL UNIT (SCU) Material of housing of Smoke Control Unit (SCU) Mild Steel(CRCA) cabinet, Stainless Steel of SS-304 grade, NA
SMOKE CONTROL UNIT (SCU) Both carbon Control and Foul odour Control Chambers for filteration of smoke emission Yes, Not Required
SMOKE CONTROL UNIT (SCU) Number of filters in Carbon control chamber One, Two, Three, Not Required
SMOKE CONTROL UNIT (SCU) Type of filters in Carbon control chamber Teflon filter, Activated Carbon filter, Steel mesh filterr, Teflon filter & Activated Carbon filter, Teflon filter, Activated Carbon filter & Steel mesh filter, Ceramic blanket as a filter, Not Required
SMOKE CONTROL UNIT (SCU) Number of filters in Odour control chamber One, Two, Three, Not Required
SMOKE CONTROL UNIT (SCU) Blower RPM 1800, 2700, 0
PERFORMANCE REQUIREMENTS Warranty in Years (Option of comprehensive warranty is available through bidding only, which if opted will supersede normal warranty in the catalogue) 1, 2, 3, 4, 5 Or higher

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer