The Directorate Of Training And Employment, Lucknow, under the Uttar Pradesh Vocational Education And Skill Development Department, seeks supply of a wide range of training lab components including ROUNDUP GENERAL-PURPOSE PCB items, TRAINER KITS, terminal blocks, banana plugs, patch cords, low voltage transformers, rectifier diodes, capacitors, voltage regulators (7805-7905), PCB cleaners, fuses, lamps, RCs, relays, switches, LEDs, indicators, wires, sockets, boxes, and related accessories. The bidder must quote against 127 BOQ items, with an estimated value not disclosed in the available data. The scope covers bulk procurement for skill development institutes in Lucknow, Uttar Pradesh, with a notable emphasis on completing diverse electrical and electronics education hardware. A key differentiator is the inclusion of a broad spectrum of components spanning basic lab hardware to advanced electronic parts, enabling a comprehensive trainer-kit ecosystem. The tender highlights a quantity flex clause up to 25% and delivery timelines linked to the original delivery schedule, with potential extension rules. Unique aspects include the generic but expansive catalog and the need to harmonize diverse electronics components under one contract. This procurement appears designed to support hands-on training in multiple trades under UP’s skill development mandate.

Technical Specifications & Requirements

  • No formal technical specifications were published in the extract; BOQ contains 127 items across trainer kits, PCB components, wiring, switches, relays, power supplies, meters, and safety accessories.
  • Expected focus areas include: general electronics lab equipment, wiring materials, standard electrical components, connectors, switches, fuses, LEDs, meters (voltmeter, ammeter), IS/IEC-compatible parts, and lab consumables.
  • Important terms embedded in the buyer terms include a 25% quantity option clause and extended delivery period rules starting from the last delivery order date. The ATC document is referenced but not displayed here. Bids must align with the stated option and delivery framework.
  • Minimum product categorization implied: educational lab hardware, PCB/diodes, capacitors, regulators, and associated lab consumables.
  • No explicit standards (IS/ISO) were listed in the provided data; bidders should verify compliance with local UP government procurement guidelines and the ATC file.

Terms, Conditions & Eligibility

  • EMD details are not visible in the extract; bidders should review the ATC for exact EMD amount and payment method.
  • Delivery terms allow a 25% quantity variation at contract placement and during the currency of the contract with rates unchanged.
  • The delivery period calculation follows a formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
  • The purchaser may extend delivery time up to the original delivery period during option exercise; bidders must comply.
  • No explicit warranty, payment schedule, or penalty clauses are provided in the extract; refer to the ATC for details on LD, penalties, and AMC requirements.

Key Specifications

  • Product/service category: training lab components, trainer kits, PCB-related items, general electrical lab hardware

  • Qty/Value: 127 BOQ items; exact quantities not disclosed

  • EMD: Not disclosed in available data; verify in ATC

  • Experience: Prior supply of educational electronics lab equipment recommended by ATC

  • Quality/Standards: Not specified in extract; confirm IS/IEC compliance and supplier certifications in ATC

  • Delivery: 25% quantity variation allowed; minimum delivery window 30 days; extension rules apply

Terms & Conditions

  • EMD amount and submission method must be confirmed in ATC

  • Delivery quantity variations up to 25% allowed

  • Delivery period calculated with a minimum 30 days; extensions possible

Important Clauses

Delivery Schedule

Quantity variations can be up to 25% at contract and during currency; delivery period follows (increased/original) × original period, minimum 30 days.

Option Clause

Purchaser may adjust quantity by ±25% and extend delivery within contracted rates; bidders must comply.

ATC Reference

ATC document uploaded by purchaser; bidders must view and comply with all terms specified therein.

Bidder Eligibility

  • GST registration and PAN submission

  • Experience in supplying educational electronics lab equipment

  • Compliance with ATC terms and bid submission requirements

Tender Data

Bid Details

Quantity

12728

Category

Roundup

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

70 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Roundup , Blank PCB Plat - GENERAL-PURPOSE PCB , Breadboard - TRAINER KITS , Terminal Blocks Banana Plugs Patch cords , TRANSFORMER low voltage , RECTIFIER DIODES And FILTER CAPACITORS , VOLTAGE REGULATOR ICs 7805-7905 , CLEANING ALCOHOL- PCB CLE ANER , FUSES LAMP LOADS , LOGIC GATE ICs 7400 SERIES OR EQUIV , Relays contactors SCRs TRIACs , LDR , Different types Switches SPST SPDT DPDT , Bulb 100W , Botton holder , PVC Copper wire 1.0MM , PVC Copper wire 1.5MM , PVC Copper wire 2.5MM , PVC Copper wire 4.00MM , PVC Copper wire0.75MM , Switch 6Amp , Switch 16Amp , Switch two way 6Amp , Indicator 6Amp , Kit Kat fuse 6Amp , Kit Kat fuse 16Amp , PVC Tape , 2 Pin top , Socket 3pin 6 Amp , Socket five pin 6 Amp , Socket 2pin , Pendant holder , PVC box 4x4 , PVC box 8x10 , PVC box 4x8 , PVC box 6x8 , PVC box 12 Module , Combined 16 Amp switch socket , Aluminum Cable 6mm Two Core , Aluminum Cable 10mm Two Core , M.C.B Box , PVC Pipe wiring pipe , Socket 16 Amp , LED Bulb 12W , LED Bulb 7W , LED Bulb 9W , Voltmeter 0- 300 v , Ampermeter 1-5Amp , MCB 6 Amp Single Pole , MCB 25 Amp , Isolator 63 Amp 4 Pole , Changeover 3 Phase 200Amp , Flexible Wire 23-76 , Flux , Soldering wire , Chart Paper , Board Marker , Pen black red blue , Register 100 page , Four Fold File , Parmanent Marker , G.I Wire , Hexa blade , Paint- golden brown black red blue , Primer , Tarpin oil , Brush 4 inch , Brush 3 inch , Brush 1 inch , Brush roller 8 inch , Hand wash 200ml , Hand scissor , Ultra lotion , Pain relief lotion , RESISTERE , CAPACITOR , DIOD , TRANSISTOR , UJT , FET , MOSFET , SCR , LOGIC GATE IC , 9V BATTERY , REGULATED IC , IC BASE 16PIN 14PIN , Caluculator , Copper Tube , LPG Can 250 gm , Brazing Rod , R-22 Gas , R-32 Gas , R-410 Gas , Capacitor 45mfd 36mfd 40mfd 50mfd , Capacitor 2.5mfd 3mfd 3.75mfd , Refrigerant Oil , Thermostat , Filter , Dettol Liquid 100ml , Battery 9Ah 12volt , Grease , Sketch Pen -Black Blue , Whitener , Sewing Machine Dori , Hand Needle , Sewing Machine Needle 16N , Sewing Machine Oil , Tube Light 20watt , Tube Light 40watt , Margin Tape , Cobra File office File , Zener diodes assorted , Transistor small signal , Single Core Jumper Wire , IC , Preset , Stapler , Stapler -big Size , Carbon Copies , Cutter , Gum sticks , Fevigum glue , Broom

Payment Timelines

Payments shall be made to the Seller within 20 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Gorakhpur

Delivery Pincodes

273158

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Manoj Kumar273158,Govt ITI Campierganj Loharpurwa GorakhpurGorakhpurUttar Pradesh2731581015-

Authority Records

VOCATIONAL EDUCATION AND SKILL DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9757680.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Directorate Of Training And Employment, Lucknow

Office Name

Govt Iti Chargawan Gorakhpur

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 127 Items Sign in for GEM prices

#1

Roundup

liquid

10 ltr Delivery: 15 days
#2

Blank PCB Plat - GENERAL-PURPOSE PCB

FOR SOLDERING PRACTICE

24 nos Delivery: 15 days
#3

Breadboard - TRAINER KITS

As per Buyer According

12 nos Delivery: 15 days
#4

Terminal Blocks Banana Plugs Patch cords

FOR CIRCUIT CONNECTIONS

50 nos Delivery: 15 days
#5

TRANSFORMER low voltage

12-0-12 V 9-0-9 V 10 nos Each

20 nos Delivery: 15 days
#6

RECTIFIER DIODES And FILTER CAPACITORS

FOR POWER SUPPLY LABS

24 nos Delivery: 15 days
#7

VOLTAGE REGULATOR ICs 7805-7905

FOR REGULATED SUPPLY EXPERIMENTS

24 nos Delivery: 15 days
#8

CLEANING ALCOHOL- PCB CLE ANER

FOR BOARD CLEANING

5 cane Delivery: 15 days
#9

FUSES LAMP LOADS

FOR EXPERIMENTS FAULT SIMULATION

50 nos Delivery: 15 days
#10

LOGIC GATE ICs 7400 SERIES OR EQUIV

AND OR NOT NAND

100 nos Delivery: 15 days
#11

Relays contactors SCRs TRIACs

For power control circuits

24 nos Delivery: 15 days
#12

LDR

As per Buyer According

50 nos Delivery: 15 days
#13

Different types Switches SPST SPDT DPDT

10 Nos Each

30 nos Delivery: 15 days
#14

Bulb 100W

Philips

50 nos Delivery: 15 days
#15

Botton holder

Havells

150 nos Delivery: 15 days
#16

PVC Copper wire 1.0MM

Havells

1,800 mtr Delivery: 15 days
#17

PVC Copper wire 1.5MM

Havells

1,350 mtr Delivery: 15 days
#18

PVC Copper wire 2.5MM

Havells

1,350 mtr Delivery: 15 days
#19

PVC Copper wire 4.00MM

Havells

450 mtr Delivery: 15 days
#20

PVC Copper wire0.75MM

Havells

450 mtr Delivery: 15 days
#21

Switch 6Amp

Havells

150 nos Delivery: 15 days
#22

Switch 16Amp

Havells

30 nos Delivery: 15 days
#23

Switch two way 6Amp

Havells

50 nos Delivery: 15 days
#24

Indicator 6Amp

Havells

50 nos Delivery: 15 days
#25

Kit Kat fuse 6Amp

Havells

50 nos Delivery: 15 days
#26

Kit Kat fuse 16Amp

Havells

30 nos Delivery: 15 days
#27

PVC Tape

Anchor

200 nos Delivery: 15 days
#28

2 Pin top

Havells

25 nos Delivery: 15 days
#29

Socket 3pin 6 Amp

Havells

50 nos Delivery: 15 days
#30

Socket five pin 6 Amp

Havells

100 nos Delivery: 15 days
#31

Socket 2pin

6 amp

50 nos Delivery: 15 days
#32

Pendant holder

Havells

50 nos Delivery: 15 days
#33

PVC box 4x4

4 Module

70 nos Delivery: 15 days
#34

PVC box 8x10

8 Module

25 nos Delivery: 15 days
#35

PVC box 4x8

4 Module

25 nos Delivery: 15 days
#36

PVC box 6x8

6 Module

20 nos Delivery: 15 days
#37

PVC box 12 Module

12 Module

25 nos Delivery: 15 days
#38

Combined 16 Amp switch socket

Havells

25 nos Delivery: 15 days
#39

Aluminum Cable 6mm Two Core

6mm

180 mtr Delivery: 15 days
#40

Aluminum Cable 10mm Two Core

10mm

180 mtr Delivery: 15 days
#41

M.C.B Box

Havells

10 nos Delivery: 15 days
#42

PVC Pipe wiring pipe

Conduict Pipe

50 fit Delivery: 15 days
#43

Socket 16 Amp

Havells

30 nos Delivery: 15 days
#44

LED Bulb 12W

Philips

25 nos Delivery: 15 days
#45

LED Bulb 7W

Philips

100 nos Delivery: 15 days
#46

LED Bulb 9W

Philips

125 nos Delivery: 15 days
#47

Voltmeter 0-300 v

As per Buyer According

10 nos Delivery: 15 days
#48

Ampermeter 1-5Amp

As per Buyer According

10 nos Delivery: 15 days
#49

MCB 6 Amp Single Pole

Havells

20 nos Delivery: 15 days
#50

MCB 25 Amp

Havells

20 nos Delivery: 15 days
#51

Isolator 63 Amp 4 Pole

Havells

3 nos Delivery: 15 days
#52

Changeover 3 Phase 200Amp

As per Buyer According

1 nos Delivery: 15 days
#53

Flexible Wire 23-76

As per Buyer According

5 coils Delivery: 15 days
#54

Flux

As per Buyer According

50 nos Delivery: 15 days
#55

Soldering wire

As per Buyer According

1 kg Delivery: 15 days
#56

Chart Paper

As per Buyer According

200 nos Delivery: 15 days
#57

Board Marker

Doms

150 nos Delivery: 15 days
#58

Pen black red blue

Reynolds

150 nos Delivery: 15 days
#59

Register 100 page

Classmat

50 nos Delivery: 15 days
#60

Four Fold File

As per Buyer According

50 nos Delivery: 15 days
#61

Parmanent Marker

Doms

30 nos Delivery: 15 days
#62

G.I Wire

As per Buyer According

4 kg Delivery: 15 days
#63

Hexa blade

As per Buyer According

1,000 nos Delivery: 15 days
#64

Paint- golden brown black red blue

Asian

50 ltr Delivery: 15 days
#65

Primer

Asian

10 ltr Delivery: 15 days
#66

Tarpin oil

As per Buyer According

20 ltr Delivery: 15 days
#67

Brush 4 inch

As per Buyer According

10 nos Delivery: 15 days
#68

Brush 3 inch

As per Buyer According

10 nos Delivery: 15 days
#69

Brush 1 inch

As per Buyer According

10 nos Delivery: 15 days
#70

Brush roller 8 inch

As per Buyer According

10 nos Delivery: 15 days
#71

Hand wash 200ml

Dettol

100 nos Delivery: 15 days
#72

Hand scissor

As per Buyer According

10 nos Delivery: 15 days
#73

Ultra lotion

As per Buyer According

10 nos Delivery: 15 days
#74

Pain relief lotion

As per Buyer According

10 nos Delivery: 15 days
#75

RESISTERE

1 kom 10kom 330kom 47kom 470kom

250 nos Delivery: 15 days
#76

CAPACITOR

10muef 100muef 47muef 0.1muef

250 nos Delivery: 15 days
#77

DIOD

IN4007 2N5402 IN4148 IN914

400 nos Delivery: 15 days
#78

TRANSISTOR

BC547 BC557

200 nos Delivery: 15 days
#79

UJT

2N2646

50 nos Delivery: 15 days
#80

FET

BFW61

50 nos Delivery: 15 days
#81

MOSFET

1A06AA

50 nos Delivery: 15 days
#82

SCR

CR106 TXN600451

100 nos Delivery: 15 days
#83

LOGIC GATE IC

7400 7402 7404 7408 7432 7486 74266

350 nos Delivery: 15 days
#84

9V BATTERY

As per Buyer According

25 nos Delivery: 15 days
#85

REGULATED IC

7805 7812 7912 7905

200 nos Delivery: 15 days
#86

IC BASE 16PIN 14PIN

50 nos Each

100 nos Delivery: 15 days
#87

Caluculator

Cassio

4 nos Delivery: 15 days
#88

Copper Tube

1by2

5 mtr Delivery: 15 days
#89

Copper Tube

1by4

5 mtr Delivery: 15 days
#90

Copper Tube

3by8

5 mtr Delivery: 15 days
#91

Copper Tube

5by8

5 mtr Delivery: 15 days
#92

LPG Can 250 gm

As per Buyer According

10 nos Delivery: 15 days
#93

Brazing Rod

As per Buyer According

1 kg Delivery: 15 days
#94

R-22 Gas

As per Buyer According

5 can Delivery: 15 days
#95

R-32 Gas

As per Buyer According

5 can Delivery: 15 days
#96

R-410 Gas

As per Buyer According

5 can Delivery: 15 days
#97

Capacitor 45mfd 36mfd 40mfd 50mfd

As per Buyer According

40 nos Delivery: 15 days
#98

Capacitor 2.5mfd 3mfd 3.75mfd

As per Buyer According

30 nos Delivery: 15 days
#99

Refrigerant Oil

As per Buyer According

5 ltr Delivery: 15 days
#100

Thermostat

As per Buyer According

10 nos Delivery: 15 days
#101

Filter

As per Buyer According

5 packet Delivery: 15 days
#102

Dettol Liquid 100ml

As per Buyer According

50 nos Delivery: 15 days
#103

Battery 9Ah 12volt

As per Buyer According

2 nos Delivery: 15 days
#104

Grease

As per Buyer According

2 kg Delivery: 15 days
#105

Sketch Pen -Black Blue

As per Buyer According

150 nos Delivery: 15 days
#106

Whitener

As per Buyer According

30 nos Delivery: 15 days
#107

Sewing Machine Dori

As per Buyer According

20 nos Delivery: 15 days
#108

Hand Needle

As per Buyer According

10 pkt Delivery: 15 days
#109

Sewing Machine Needle 16N

As per Buyer According

10 pkt Delivery: 15 days
#110

Sewing Machine Oil

As per Buyer According

50 nos Delivery: 15 days
#111

Tube Light 20watt

As per Buyer According

20 nos Delivery: 15 days
#112

Tube Light 40watt

As per Buyer According

20 nos Delivery: 15 days
#113

Margin Tape

Tailor Tape

10 nos Delivery: 15 days
#114

Cobra File office File

As per Buyer According

50 nos Delivery: 15 days
#115

Zener diodes assorted

5V 12V

50 nos Delivery: 15 days
#116

Transistor small signal

NPN PNP BC547 BC557

50 nos Delivery: 15 days
#117

Single Core Jumper Wire

FOR BREADBOARD-TRAINER USE

50 nos Delivery: 15 days
#118

IC

IC 555

50 nos Delivery: 15 days
#119

Preset

10 K

20 nos Delivery: 15 days
#120

Stapler

Small

10 nos Delivery: 15 days
#121

Stapler -big Size

As per Buyer According

5 nos Delivery: 15 days
#122

Carbon Copies

As per Buyer According

2 pkt Delivery: 15 days
#123

Cutter

As per Buyer According

10 nos Delivery: 15 days
#124

Gum sticks

As per Buyer According

10 nos Delivery: 15 days
#125

Fevigum glue

As per Buyer According

50 nos Delivery: 15 days
#126

Broom

As per Buyer According

50 nos Delivery: 15 days
#127

Different types Switches SPST SPDT DPDT

10 Nos Each

30 nos Delivery: 15 days

Categories 98

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar training-lab equipment supply

4

Financial statements (last 3 years)

5

EMD/Security deposit documents

6

Technical bid documents and compliance certificates

7

OEM authorizations or authorized distributor certificates

8

Any mandatory ATC/documents referenced in Buyer Added Terms

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for training lab equipment tender in Lucknow UP 2026

Bidders should first register with the UP procurement portal, review the ATC for EMD, delivery terms, and 25% quantity option. Prepare GST, PAN, financials, and OEM authorizations. Submit technical and financial bids as per portal guidelines, ensuring IS/IEC compliance if specified in ATC.

What documents are required for Lucknow training lab procurement

Required documents include GST registration, PAN card, experience certificates in similar education equipment, financial statements, EMD documents, technical compliance certificates, OEM authorizations, and ATC-specified bids. Ensure submission of all items in the documented sequence of the portal.

What are the delivery terms for UP trainer kit tender 2026

Delivery terms allow up to 25% quantity variation at contract and during currency. Delivery period is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Extensions may be granted to complete the order.

Which certifications or standards are required for this Lucknow tender

The extract does not list explicit standards; bidders should verify IS/IEC compliance and any OEM-specific certifications in the ATC. Ensure all components in the trainer kits align with UP government procurement guidelines and relevant educational equipment standards.

When is the bid submission deadline for the UP training equipment

The exact bid submission deadline is not provided in the extract. Bidders must consult the ATC document and UP procurement portal for the final date, along with any revisions or addenda issued during the tender process.

What is the EMD amount for the Lucknow trainer kit procurement

The EMD amount is not disclosed in the available data; bidders must refer to the ATC for the exact EMD figure, acceptable payment methods, and submission proof required with the bid.