Damodar Valley Corporation invites bids for PG clamps for Panther conductor and PG clamps for DOG conductor. The tender scope shows a quantity adjustment option up to 25% and delivery timelines aligned to the purchase order, with 45 days delivery from PO issuance. Location details are not fully specified in the data, but the procurement targets high-integrity clamps meeting rail/line standards for conductor installations. The ATC terms require firm, INR-based pricing exclusive of taxes, and online bill submission via a vendor portal. The contract contemplates transit insurance under Mega Risk Policy and a pay-at-CRAC mechanism with a 10-day payment window, signaling a streamlined payment cycle. A vendor may need to upload signed ATC acceptance, Letter of Bid, and banking details on GeM. These nuances indicate a standard utility-grade equipment procurement with strict adherence to price and delivery milestones.
Product names: PG clamps for Panther conductor; PG clamps for DOG conductor
Delivery timeline: 45 days from PO issuance
Pricing: Firm, INR, FOR destination, excluding taxes; itemized tax/fine print required
Payment: 100% within 10 days of CRAC with online bill submission
Insurance: Transit cover under Mega Risk Policy
Submission: Signed ATC, Letter of Bid, Banker details via GeM portal
Delivery within 45 days subject to 25% quantity variation
100% payment within 10 days after CRAC and online submission
Firm, INR-based FOR destination pricing with tax disclosures
100% payment within ten days of CRAC and online bill submission
Materials to be delivered within 45 days from date of PO; option for extended timing relative to quantity changes
Penalties not explicitly detailed in provided data; standard contractual LDs may apply
Experience in supplying conductor clamps or similar power transmission components
Manufacturing or authorized OEM capability for PG clamps
Financial stability evidenced by annual turnover capable of supporting procurement
Quantity
2
Category
PG clamp for Panther conductor
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
5 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
PG clamp for Panther conductor , PG clamp for DOG conductor
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Dhanbad
Delivery Pincodes
828116
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Susil Kumar Handal | 828116,Office of the SE, GOMD-IV, Damodar Valley Corporation, P.O- Kushunda, Dhanbad, Jharkhand | Dhanbad | Jharkhand | 828116 | 1 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
19-Oct-2026, 10:30 am
Opening Date
20-Oct-2026, 10:30 am
Discover companies most likely to bid on this tender
Declaration of Acceptance of All Terms and Conditions on bidder letterhead
Letter of Bid on bidder letterhead (as per Annexure -G)
Details of Banker for RTGS/NEFT (as per Annexure)
Key insights about JHARKHAND tender market
Bidders must first register on the GeM portal and upload the signed ATC, Letter of Bid, and Banker details. Ensure INR pricing FOR destination, firm through contract, and include transit insurance details via Mega Risk Policy. Delivery is within 45 days of PO; payment is 100% within 10 days after CRAC.
Required documents include Declaration of Acceptance of All Terms, signed Letter of Bid, and Banker details for RTGS/NEFT. Additional proof may include manufacturer authorization, GST registration, and technical compliance documents as per GeM portal formats.
Delivery must occur within 45 days from PO issuance. Prices must be firm and INR-based FOR destination. Payment terms specify 100% payment within 10 days of CRAC, contingent on online submission of bills.
The tender covers two product categories: PG clamps for Panther conductor and PG clamps for DOG conductor. No separate BoQ items listed; vendors should quote for each category on an FOR-destination basis with the same contract rates.
Transit insurance is arranged by DVC under Mega Risk Policy with the current underwriter. Vendors should note this and ensure delivery complies with insured routing and documentation requirements.
The Purchaser may increase or decrease quantity up to 25% during procurement and during the currency of the contract at contracted rates. Additional time is calculated using (increased quantity/original quantity) × original delivery period with a minimum 30 days.
Yes. Vendors must upload ATC acceptance, Letter of Bid, and Banker details on GeM portal formats. A unique bill ID is generated after submission and must accompany payment documentation as hard copy as required.
The tender data does not specify standards. Bidders should verify if ISI, ISO, or other power-conductor clamp standards are expected and align pricing and documentation accordingly on GeM submissions.