Bid Publish Date
08-Oct-2026, 10:51 am
Bid End Date
29-Oct-2026, 9:00 am
EMD
₹51,900
Value
₹25,95,410
Progress
Public procurement opportunity for North Eastern Electric Power Corporation Limited Supply and installation New Chemical Earthing with Chamber pit and hardware, Supply and installation new Copper Plate Earthing With chamber pit for colony and hardware, Earthing Treatment for the solar plant with hardware, 11 KV Pole Painting including cross arms and structures, 33 KV Pole Painting including cross arms and structures, Painting 33 KV Substation with all equipment instrument transformers supports etc, Lightning Arrester Copper supply with earthing installation for colony, GI Flat 25 3 mm supply with installation, Installation of LV MS cable tray channel with Stand on LV side of Transformers at Solar plant, Transformers painting of Solar Plant, HT cable Termination kit Joint Charges, Supply of 33 KV 3 core 185 sqmm Cable Kit Outdoor Termination, Supply of 33 KV 3 core 185 sqmm Cable Kit Indoor Termination, Supply of 33 KV 3 core 400 sqmm Cable Kit Indoor Termination, Supply of 33 KV 3 core 400 sqmm Cable Kit Outdoor Termination, A Supply of 11 KV 3 core 70 sqmm UG Cable Kit Outdoor Termination, B Supply of 11 KV 3 core 70 sqmm UG Cable Kit Straight joint kit Termination, C Supply of 11 KV 3 core 70 sqmm AB Cable Kit Outdoor termination kit. Quantity: 962 issued by. Submission Deadline: 29-10-2026 09: 00: 00. View full details and respond.
Quantity
962
Category
Supply and installation New Chemical Earthing with Chamber pit and hardware
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Bid Splitting Applied
No
Min. Avg. Annual Turnover
12
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply and installation New Chemical Earthing with Chamber pit and hardware , Supply and installation new Copper Plate Earthing With chamber pit for colony and hardware , Earthing Treatment for the solar plant with hardware , 11 KV Pole Painting including cross arms and structures , 33 KV Pole Painting including cross arms and structures , Painting 33 KV Substation with all equipment instrument transformers supports etc , Lightning Arrester Copper supply with earthing installation for colony , GI Flat 25 3 mm supply with installation , Installation of LV MS cable tray channel with Stand on LV side of Transformers at Solar plant , Transformers painting of Solar Plant , HT cable Termination kit Joint Charges , Supply of 33 KV 3 core 185 sqmm Cable Kit Outdoor Termination , Supply of 33 KV 3 core 185 sqmm Cable Kit Indoor Termination , Supply of 33 KV 3 core 400 sqmm Cable Kit Indoor Termination , Supply of 33 KV 3 core 400 sqmm Cable Kit Outdoor Termination , A Supply of 11 KV 3 core 70 sqmm UG Cable Kit Outdoor Termination , B Supply of 11 KV 3 core 70 sqmm UG Cable Kit Straight joint kit Termination , C Supply of 11 KV 3 core 70 sqmm AB Cable Kit Outdoor termination kit
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
20
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Sepahijala
Delivery Pincodes
799131
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Goutam Debnath | 799131,Tripura Gas Based Power Station NEEPCO, Monarchak, PO-Dhanpur, Sonamura, Sepahijala District, Tripura | Sepahijala | Tripura | 799131 | 50 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Supply and installation New Chemical Earthing with Chamber pit and hardware
Chemical Earthing with hardware Reputed Firm
Supply and installation new Copper Plate Earthing With chamber pit for colony and hardware
Copper plate earthing Reputed Firm
Earthing Treatment for the solar plant with hardware
Earthing treatment material Reputed Firm
11 KV Pole Painting including cross arms and structures
A Paint make Asian paint Berger Dulux
33 KV Pole Painting including cross arms and structures
B Paint make Asian paint Berger Dulux
Painting 33 KV Substation with all equipment instrument transformers supports etc
C Paint make Asian paint Berger Dulux
Lightning Arrester Copper supply with earthing installation for colony
LA copper earthing material Reputed firm
GI Flat 25 3 mm supply with installation
GI Flat Reputed Firm
Installation of LV MS cable tray channel with Stand on LV side of Transformers at Solar plant
Items to be utilised Reputed Firm
Transformers painting of Solar Plant
Paint make Asian paint Berger Dulux
HT cable Termination kit Joint Charges
To be decided through GeM
Supply of 33 KV 3 core 185 sqmm Cable Kit Outdoor Termination
A 3M Joint mask Heat shrink
Supply of 33 KV 3 core 185 sqmm Cable Kit Indoor Termination
B 3M Joint mask Heat shrink
Supply of 33 KV 3 core 400 sqmm Cable Kit Indoor Termination
C 3M Joint mask Heat shrink
Supply of 33 KV 3 core 400 sqmm Cable Kit Outdoor Termination
D 3M Joint mask Heat shrink
A Supply of 11 KV 3 core 70 sqmm UG Cable Kit Outdoor Termination
F 3M Joint mask Heat shrink
B Supply of 11 KV 3 core 70 sqmm UG Cable Kit Straight joint kit Termination
G 3M Joint mask Heat shrink
C Supply of 11 KV 3 core 70 sqmm AB Cable Kit Outdoor termination kit
H 3M Joint mask Heat shrink
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Supply and installation New Chemical Earthing with Chamber pit and hardware | Chemical Earthing with hardware Reputed Firm | 50 | nos | goutamdebnath | 60 | |
| 2 | Supply and installation new Copper Plate Earthing With chamber pit for colony and hardware | Copper plate earthing Reputed Firm | 26 | nos | goutamdebnath | 60 | |
| 3 | Earthing Treatment for the solar plant with hardware | Earthing treatment material Reputed Firm | 120 | nos | goutamdebnath | 60 | |
| 4 | 11 KV Pole Painting including cross arms and structures | A Paint make Asian paint Berger Dulux | 10 | nos | goutamdebnath | 60 | |
| 5 | 33 KV Pole Painting including cross arms and structures | B Paint make Asian paint Berger Dulux | 14 | nos | goutamdebnath | 60 | |
| 6 | Painting 33 KV Substation with all equipment instrument transformers supports etc | C Paint make Asian paint Berger Dulux | 1 | lot | goutamdebnath | 60 | |
| 7 | Lightning Arrester Copper supply with earthing installation for colony | LA copper earthing material Reputed firm | 17 | nos | goutamdebnath | 60 | |
| 8 | GI Flat 25 3 mm supply with installation | GI Flat Reputed Firm | 500 | mtr | goutamdebnath | 60 | |
| 9 | Installation of LV MS cable tray channel with Stand on LV side of Transformers at Solar plant | Items to be utilised Reputed Firm | 160 | mtr | goutamdebnath | 60 | |
| 10 | Transformers painting of Solar Plant | Paint make Asian paint Berger Dulux | 6 | nos | goutamdebnath | 60 | |
| 11 | HT cable Termination kit Joint Charges | To be decided through GeM | 12 | nos | goutamdebnath | 60 | |
| 12 | Supply of 33 KV 3 core 185 sqmm Cable Kit Outdoor Termination | A 3M Joint mask Heat shrink | 4 | nos | goutamdebnath | 60 | |
| 13 | Supply of 33 KV 3 core 185 sqmm Cable Kit Indoor Termination | B 3M Joint mask Heat shrink | 10 | nos | goutamdebnath | 60 | |
| 14 | Supply of 33 KV 3 core 400 sqmm Cable Kit Indoor Termination | C 3M Joint mask Heat shrink | 4 | nos | goutamdebnath | 60 | |
| 15 | Supply of 33 KV 3 core 400 sqmm Cable Kit Outdoor Termination | D 3M Joint mask Heat shrink | 2 | nos | goutamdebnath | 60 | |
| 16 | A Supply of 11 KV 3 core 70 sqmm UG Cable Kit Outdoor Termination | F 3M Joint mask Heat shrink | 10 | nos | goutamdebnath | 60 | |
| 17 | B Supply of 11 KV 3 core 70 sqmm UG Cable Kit Straight joint kit Termination | G 3M Joint mask Heat shrink | 6 | nos | goutamdebnath | 60 | |
| 18 | C Supply of 11 KV 3 core 70 sqmm AB Cable Kit Outdoor termination kit | H 3M Joint mask Heat shrink | 10 | nos | goutamdebnath | 60 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer