Progress
Konkan Railway Corporation Limited announces a tender for 4 Drawer Vertical File Cabinet PR GR 470 MM 620 MM, Godrej Interio Glass Door Storwel, Godrej MOVBACK TO BACK 2 PERSON RECTANGULAR WORK STATION, Diva Revolving Mid Back with Fixed Loop Arm Chair, Plastic Fiber Moulded chair injection moulded glass fiber reinforced polypropylene with standard Make Nilkamal cello or equivalent in SOUTH GOA, GOA. Quantity: 20. Submission Deadline: 04-09-2026 21: 00: 00. Last date to apply is approaching fast!
Quantity
20
Category
Godrej MOVBACK TO BACK 2 PERSON RECTANGULAR WORK STATION
Bid Type
Single Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
5 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
1
OEM Avg. Turnover
1
Past Performance
40 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
4 Drawer Vertical File Cabinet PR GR 470 MM 620 MM , Godrej Interio Glass Door Storwel , Godrej MOVBACK TO BACK 2 PERSON RECTANGULAR WORK STATION , Diva Revolving Mid Back with Fixed Loop Arm Chair , Plastic Fiber Moulded chair injection moulded glass fiber reinforced polypropylene with standard Make Nilkamal cello or equivalent
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
21
Delivery Locations
1
Delivery Cities
South Goa
Delivery Pincodes
403601
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Mohammad Nurani Saied | 403601,SENIOR MATERIALS MANAGER STORES DEPOT QUEPEM ROAD OPP ESI HOSPITAL MADGAON GOA 403601 GSTIN :30AAACK3725H1Z1 | South Goa | Goa | 403601 | 2 | 21 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
4 Drawer Vertical File Cabinet PR GR 470 MM 620 MM
4 Drawer Vertical File Cabinet PR GR 470 MM 620 MM
Godrej Interio Glass Door Storwel
Godrej Interio Glass Door Storwel
Godrej MOVBACK TO BACK 2 PERSON RECTANGULAR WORK STATION
Godrej MOVBACK TO BACK 2 PERSON RECTANGULAR WORK STATION
Diva Revolving Mid Back with Fixed Loop Arm Chair
Diva Revolving Mid Back with Fixed Loop Arm Chair
Plastic Fiber Moulded chair injection moulded glass fiber reinforced polypropylene with standard Make Nilkamal cello or equivalent
Plastic Fiber Moulded chair injection moulded glass fiber reinforced polypropylene with standard Make Nilkamal cello or equivalent
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 4 Drawer Vertical File Cabinet PR GR 470 MM 620 MM | 4 Drawer Vertical File Cabinet PR GR 470 MM 620 MM | 2 | nos | ammmao | 21 | |
| 2 | Godrej Interio Glass Door Storwel | Godrej Interio Glass Door Storwel | 2 | nos | ammmao | 21 | |
| 3 | Godrej MOVBACK TO BACK 2 PERSON RECTANGULAR WORK STATION | Godrej MOVBACK TO BACK 2 PERSON RECTANGULAR WORK STATION | 4 | nos | ammmao | 21 | |
| 4 | Diva Revolving Mid Back with Fixed Loop Arm Chair | Diva Revolving Mid Back with Fixed Loop Arm Chair | 8 | nos | ammmao | 21 | |
| 5 | Plastic Fiber Moulded chair injection moulded glass fiber reinforced polypropylene with standard Make Nilkamal cello or equivalent | Plastic Fiber Moulded chair injection moulded glass fiber reinforced polypropylene with standard Make Nilkamal cello or equivalent | 4 | nos | ammmao | 21 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer