Bids are Invited For Excavating over areas,Excavating over areas exc,Material and labour PCC,Returning filling in excava in JAMMU, JAMMU & KASHMIR

Bid Publish Date

13-Dec-2025, 11:01 am

Bid End Date

24-Dec-2025, 11:00 am

Progress

RA
Issue13-Dec-2025, 11:01 am
Reverse AuctionCompleted
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

2745

Category

Excavating over areas

Bid Type

Two Packet Bid

Categories 38

Indian Army has released a public tender for Excavating over areas, Excavating over areas exc, Material and labour PCC, Returning filling in excavated, Removing of excavated material soil, Formwork to sides of concrete foundations, Formwork to faces of walls retaining, Supply and fixing TMT steel, Material and Labour for RCC, Material and Labour for RCC Design, Material and labour, Formwork to soffits of suspended, Formwork to edges of concrete flats, Material and labour for mild steel, Material and labour for two coat, Material and labour for prepration, Material and labour for prepration of newly in JAMMU, JAMMU & KASHMIR. Quantity: 2745. Submission Deadline: 24-12-2025 11: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Excavating over areas , Excavating over areas exc , Material and labour PCC , Returning filling in excavated , Removing of excavated material soil , Formwork to sides of concrete foundations , Formwork to faces of walls retaining , Supply and fixing TMT steel , Material and Labour for RCC , Material and Labour for RCC Design , Material and labour , Formwork to soffits of suspended , Formwork to edges of concrete flats , Material and labour for mild steel , Material and labour for two coat , Material and labour for prepration , Material and labour for prepration of newly

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8699891.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 17 Items Sign in for GEM prices

#1

Excavating over areas

Excavating over areas n exc 1.5 m deep and getting out in any type of soil of soil complete all as specified and directed by Engr in Charge Approx 30.14 Cum

30 cum Delivery: 45 days
#2

Excavating over areas exc

Excavating over areas exc 1.5 m deep but n.exc 3.00m deep and getting out in any type of soil of soil complete all as specified and directed by Engr in Charge Approx 21.09 Cum

21 cum Delivery: 45 days
#3

Material and labour PCC

Material and labour PCC 1 ratio 3 ratio 6 C2 using 40 mm thick graded stone aggregate in foundation filling and mass concrete complete all as specified and directed by Engr in Charge Approx 2.01 Cum

2 cum Delivery: 45 days
#4

Returning filling in excavated

Returning filling in excavated approved soil any type of soil including spreading leveling watering and well ramming in layers not exc 25 cm thick each

11 cum Delivery: 45 days
#5

Removing of excavated material soil

Removing of excavated material soil from distance exc 1.5 Km and n exc 5.Km from excavated soil lacation as directed by Engr in Charge i.e Out side AF Stn or where low laying area complete all as specified and directed by Engr in Charge. Approx 39.76 Cum

40 cum Delivery: 45 days
#6

Formwork to sides of concrete foundations

Formwork to sides of concrete foundations footings bases of columns raft and raft beams sides and soffits if any of foundation and plinth beams and similar work vertical or to batter flat for rough finished surface of concrete complete all as specified and directed. Approx 20.50 Sqm

21 sqm Delivery: 45 days
#7

Formwork to faces of walls retaining

Formwork to faces of walls retaining walls abutments parapets and staircase railings and similar work including attached pillasters buttresses etc vertical or to batter flat rough finished surface complete all as specified and directed. Approx 92.25 Sqm

92 sqm Delivery: 45 days
#8

Supply and fixing TMT steel

Supply and fixing TMT steel bars 10mm dia and over cut to length bent to shape required including cranking bending rounded for hooping for columns hooking ends and binding with mild steel wire annealed not less than 0.9 mm dia or securing with clips complete all as specified and as directed by Engr In Charge. Approx 2267.13 Kg

2,267 kg Delivery: 45 days
#9

Material and Labour for RCC

Material and Labour for RCC Design mix M 30 using 20mm graded crushed stone aggregate as in foundations including rafts footings foundation beams plinth beams bases for columns etc basement slabs under reamed piles and mass concrete complete all as specified and as directed. Approx 3.60 Cum

4 cum Delivery: 45 days
#10

Material and Labour for RCC Design

Material and Labour for RCC Design mix M 30 using 20mm graded crushed stone aggregate as in Walls retaining walls basement walls ballast walls and the like any thickness above top of footings including attached pilasters and buttresses complete all as specified and as directed. Approx 9.32 Cum

9 cum Delivery: 45 days
#11

Material and labour

Material and labour for RCC Design mix M 30 using 20mm graded crushed stone aggregate as in Slabs supported on walls beams and columns in floors roofs landings balconies canopies deck slabs Culvert slab and in shelves and the like complete all as specified and as directed. Approx 5.40 Cum

5 cum Delivery: 45 days
#12

Formwork to soffits of suspended

Formwork to soffits of suspended slabs such as roof slabs floor slabs landings and similar work not exceeding 200mm thick Horizontal or sloping Approx 14.06 Sqm

14 sqm Delivery: 45 days
#13

Formwork to edges of concrete flats

Formwork to edges of concrete flats treads breaks in floors window cills concrete railings openings in concrete walls floor and roofs n exc 20 cm wide and sides of RCC PCC bands in walls horizontal or sloping and similar work exc 10cm but n exc 20cm wide. Approx 20.50 Rm

21 rm Delivery: 45 days
#14

Material and labour for mild steel

Material and labour for mild steel framed work such as grills gratings drain cover support etc with ends of bars shouldered and or riveted or forged into spikes framed guard bars barred iron doors adders framed balusters walk ways railings framework of water tanks and similar work conforming to Fe.290.Gde E 165. Approx 145.25 Kg

145 kg Delivery: 45 days
#15

Material and labour for two coat

Material and labour for two coat of synthetic enmel paint over a Coat of red oxide zinc chrome primer including prepration of new steel and iron surface over 10 cm width or girth complete all as specified and directed. Approx 5.72 Sqm

6 sqm Delivery: 45 days
#16

Material and labour for prepration

Material and labour for prepration of newly RCC wall surfaces and applying two coat of Acrylic distember over a coat of primer including prepration of surface complete all as specified and directed. Approx 42.53 Sqm

43 sqm Delivery: 45 days
#17

Material and labour for prepration of newly

Material and labour for prepration of newly RCC ceiling surfaces and applying two coat of Acrylic distember over a coat of primer including prepration of surface complete all as specified and directed Approx 14.06 Sqm

14 sqm Delivery: 45 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

13-Dec-2025

Reverse Auction Schedule

Completed

Start

17-Jan-2026, 5:00 pm

End

19-Jan-2026, 5:00 pm

Duration: 48 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
DAVINDER SINGH   Under PMA
-21-12-2025 13:20:12
2
M/S CCC (CHOUDHARY CONSTRUCTION COMPANY)   Under PMA
-20-12-2025 13:57:31
3
M/S PRATAP TRADING CO   Under PMA
-20-12-2025 18:24:24
4
MAHALUXMI BUILDERS   Under PMA
-20-12-2025 16:55:11

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1M/S CCC (CHOUDHARY CONSTRUCTION COMPANY)(MII)   Under PMA Winner ₹4,83,610Item Categories : Excavating over areas,Excavating over areas exc,Material and labour PCC,Returning filling in excava
L2M/S PRATAP TRADING CO (MSE,MII)   Under PMA₹5,82,558Item Categories : Excavating over areas,Excavating over areas exc,Material and labour PCC,Returning filling in excava
L3DAVINDER SINGH (MSE,MII)   Under PMA₹6,07,108Item Categories : Excavating over areas,Excavating over areas exc,Material and labour PCC,Returning filling in excava

🎉 L1 Winner

M/S CCC (CHOUDHARY CONSTRUCTION COMPANY)(MII)   Under PMA

Final Price: ₹4,83,610