TenderDekho Logo
Active GEM

Indian Army Department Of Military Affairs Tender for Air Dryer, Isolator Switch & Related Components 2026

Bid Publish Date

02-Sep-2026, 8:57 am

Bid End Date

12-Sep-2026, 9:00 am

Progress

Issue02-Sep-2026, 8:57 am
AwardPending

Key Highlights

  • Organization: Indian Army, Department Of Military Affairs
  • Product categories: AIR DRYER, ISOLATOR SWITCH, SPRING BRAKE CHAMBER, FUEL FILTER, SOLENOID SWITCH, BEARING INNER, ROLLER BEARING OUTER, PUMP HYDRAULIC RAM, COVER ASY, DRIVEN DISC, RELEASE BEARING
  • Delivery variation: 25% quantity increase/decrease allowed during contract
  • Warranty: 1 year from final acceptance or post-installation testing; OEM warranty certificates required

Tender Overview

The Indian Army under the Department Of Military Affairs invites bids for a consolidated list of mechanical components including AIR DRYER, ISOLATOR SWITCH, SPRING BRAKE CHAMBER, FUEL FILTER, SOLENOID SWITCH, BEARING INNER, ROLLER BEARING OUTER, PUMP HYDRAULIC RAM, COVER ASY, DRIVEN DISC, and RELEASE BEARING, across 11 items. The scope encompasses supply, installation, testing, commissioning, operator training, and statutory clearances. The tender emphasizes a flexible quantity clause allowing up to 25% variation in order quantity during both initial and extended delivery periods, with delivery time recalibrations based on the original quantity. Estimated value and exact quantities are not disclosed, but the BOQ lists 11 items with unspecified quantities. This procurement aims to equip military platforms with high-reliability components while ensuring post-sale service coverage across India.

Technical Specifications & Requirements

  • Scope: Supply, Installation, Testing, Commissioning, and Operator Training; post-installation support and statutory clearances where required
  • Warranty: 1 year from final acceptance or after installation, with OEM warranty certificates
  • After-sales: well-established national service network in India; service centers near consignee locations must be uploaded with the bid
  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate certified by bank; vendor code creation required
  • OEM support: original equipment manufacturer warranties; on-site troubleshooting and maintenance commitments
  • 11-item BOQ: items listed but quantities not disclosed in the provided data; bidders should prepare to scale per acceptance
  • Delivery terms: option to adjust delivery period based on the extended quantity calculation; minimum 30 days extension if needed
  • Compliance: ensure installation and testing readiness with operator training included; statutory sign-offs where applicable

Terms, Conditions & Eligibility

  • EMD/Security: not explicitly stated; bidders must rely on standard government procurement norms
  • Delivery: delivery period recalculation subject to original delivery period with minimum 30 days
  • Payment: terms not specified; bidders should anticipate standard government practice (milestone-based) and OEM warranty submission
  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate; OEM authorizations may be required
  • Warranty: 1 year from acceptance; OEM certificates to be submitted at delivery
  • After-sales: established India-based service network and near-consignee centres must be uploaded
  • Quantity variance: up to 25% variation in order quantity during contract execution

Key Specifications

  • Air Dryer: component category listed, no explicit performance spec provided

  • Isolator Switch: listed in BOQ; no electrical rating provided

  • Spring Brake Chamber: listed in BoQ; no bore/pressure specs provided

  • Fuel Filter: listed; no micron rating specified

  • Solenoid Switch: listed; no coil voltage or current rating provided

  • Bearing Inner / Roller Bearing Outer: listed; no load rating or dimension given

  • Pump Hydraulic Ram: listed; no displacement or pressure rating provided

  • Cover Assembly, Driven Disc, Release Bearing: listed; no material specs provided

  • Quality/Standard: Not specified in data; bidders should rely on OEM specs

Terms & Conditions

  • Quantity variation up to 25% with corresponding delivery time recalculation

  • 1-year warranty from acceptance; OEM certificates at delivery

  • PAN, GSTIN, cancelled cheque, EFT mandate required for bid submission

Important Clauses

Payment Terms

Not explicitly stated; bidders should prepare for standard government terms and OEM warranty submission

Delivery Schedule

Delivery period starts from last date of original delivery order; extended period if option exercised; minimum 30 days extension

Penalties/Liquidated Damages

Not specified; implied compliance with standard government procurement penalties, if any

Bidder Eligibility

  • Demonstrated capacity to supply mechanical components listed (11 items)

  • Compliance with Indian procurement norms and ability to provide OEM warranty certificates

  • Presence of India-based service centers for installation, commissioning, training, and maintenance

Tender Data

Bid Details

Quantity

13

Category

AIR DRYER

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

AIR DRYER , ISOLATOR SWITCH , SPRING BRAKE CHAMBER , FUEL FILTER , SOLENOID SWITCH , BEARING INNER , ROLLER BEARING OUTER , PUMP HYDRAULIC RAM , COVER ASSY , DRIVEN DISC , RELEASE BEARING

Pre-Bid & Qualification

Pre-Bid Date

11-09-2026 10:00:00

Pre-Bid Venue

THE SELLER SHALL MEET THE BUYER AT THE BUYER S DESIGNATED LOCATION FOR VERIFICATION OF PRODUCT SPECIFICATIONS AND QUALITY OF PRODUCT SAMPLE BEFORE PARTICIPATION IN THE BID. IF THE SELLER IS FROM AN OUTSIDE LOCATION, THEY WILL CONTACT THE BUYER FOR CLARIFICATION OF PRODUCT. IN CASE THE SELLER BECOMES THE L1 BIDDER, INSTALLATION OF THE PRODUCT AT THE BUYER S SITE SHALL BE THE SOLE RESPONSIBILITY OF THE SELLER. THE PRODUCT SAMPLE AND DEMONSTRATION SHALL BE PROVIDED FREE OF COST BY THE SELLER. ALL INSTALLATION COSTS INCLUDING LABOR, TRAVEL, TOOLS, AND CONSUMABLES, SHALL BE BORNE ENTIRELY BY THE SELLER. ALL ABOVE CHARGES FOR THE PRODUCT ARE INCLUDED IN BID AMOUNT. IF THE SELLER FAILS TO FULFILL THESE CONDITIONS OR DEFAULTS ON COMMITMENTS, THE BUYER RESERVES THE RIGHT TO CANCEL THE BID/CONTRACT AT ANY STAGE WITHOUT FINANCIAL LIABILITY

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

JALANDHAR CITY

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-JALANDHAR CITYJALANDHAR CITY--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9834238.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

AIR DRYER

STLN

1 nos Delivery: 15 days
#2

ISOLATOR SWITCH

STLN

1 nos Delivery: 15 days
#3

SPRING BRAKE CHAMBER

STLN

1 nos Delivery: 15 days
#4

FUEL FILTER

STLN

1 nos Delivery: 15 days
#5

SOLENOID SWITCH

STLN

1 nos Delivery: 15 days
#6

BEARING INNER

STLN

2 nos Delivery: 15 days
#7

ROLLER BEARING OUTER

STLN

2 nos Delivery: 15 days
#8

PUMP HYDRAULIC RAM

STLN

1 nos Delivery: 15 days
#9

COVER ASSY

STLN

1 nos Delivery: 15 days
#10

DRIVEN DISC

STLN

1 nos Delivery: 15 days
#11

RELEASE BEARING

STLN

1 nos Delivery: 15 days

Categories 19

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card

2

GSTIN Certificate

3

Cancelled Cheque

4

EFT Mandate certified by Bank

5

OEM Authorization (if applicable)

6

Technical Compliance Certificates (OEM warranties)

7

Service Centre details near consignee destinations

8

Proof of installation, commissioning, and training capacity

9

Industry certifications relevant to listed components (if any)

Frequently Asked Questions

Key insights about PUNJAB tender market

How to bid for the Indian Army air dryer and related components tender in 2026

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate; provide OEM authorization if applicable; ensure OEM warranty certificates are ready at delivery; include service center details and evidence of installation capability; comply with 25% quantity variation terms and 1-year warranty requirements.

What documents are required for the army procurement of mechanical components in 2026

Required documents include PAN, GSTIN, cancelled cheque, EFT mandate certified by bank, OEM authorizations, OEM warranty certificates, installation/comissioning training capability proof, and service center details near consignee locations; these accompany the bid for vendor code creation.

What are the warranty and post-sales requirements for army component supply

Warranty period is 1 year from final acceptance or post-installation testing; OEM warranties must be provided at delivery; bidders must prove national service network and service centers proximity to consignee destinations for after-sales support.

What is the delivery variation clause for quantity changes in this tender

Purchaser may increase or decrease quantity up to 25% at contract placement and during currency; delivery time recalculated as (increased quantity/original quantity) × original delivery period, minimum 30 days; extension allowed within original delivery frame.

What specifications are available for the listed components in the army tender

No explicit performance specs are provided; bidders should rely on OEM product specifications for items like air dryer, isolator switch, brake chamber, fuel filter, solenoid switch, and bearings; ensure ISI/ISO certifications if applicable and factory testing data on request.

What are the submission timelines and contract scope for installation and training

Scope includes supply, installation, testing, commissioning, and operator training; training and statutory clearances are included where required; no explicit dates in data; bidders should prepare for on-site commissioning timelines aligned with delivery and acceptance testing.

How to demonstrate eligibility for Indian Army procurement of mechanical components

Prove governance: PAN and GST compliance, bank EFT mandate, cancelled cheque; file OEM authorizations and service capability; show prior installation experience, and provide OEM warranty documentation; confirm national service network with maintenance capability across India.

What is required for OEM warranty submissions in this tender

Submit OEM warranty certificates at the time of goods delivery; confirm authorized service centers in India; provide details of warranty scope, response times, spares availability, and after-sales support commitments in the bid.