TenderDekho Logo
Active GEM

Bids are Invited For SOR 1,SOR 2,SOR 3,SOR 4,SOR 5,SOR 6,SOR 7,SOR 8,SOR 9,SOR 10,SOR 11,SOR 12,SOR 13,SOR 14,SOR 15,SOR in WEST DELHI, DELHI

Bid Publish Date

29-Jul-2026, 3:58 pm

Bid End Date

12-Sep-2026, 4:00 pm

EMD

₹1,50,000

Value

₹74,90,522

Progress

Issue29-Jul-2026, 3:58 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

167

Category

SOR 1

Bid Type

Single Packet Bid

Categories 21

A tender has been published for Railtel Corporation Of India Limited SOR 1, SOR 2, SOR 3, SOR 4, SOR 5, SOR 6, SOR 7, SOR 8, SOR 9, SOR 10, SOR 11, SOR 12, SOR 13, SOR 14, SOR 15, SOR 16 in WEST DELHI, DELHI. Quantity: 167 by. Submission Deadline: 12-09-2026 16: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SOR 1 , SOR 2 , SOR 3 , SOR 4 , SOR 5 , SOR 6 , SOR 7 , SOR 8 , SOR 9 , SOR 10 , SOR 11 , SOR 12 , SOR 13 , SOR 14 , SOR 15 , SOR 16

Advisory Bank

ICICI

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

New Delhi

Delivery Pincodes

110023

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Swatantra Gupta110023,Plate-A, 6th Floor, NBCC Building, Tower-II, East Kidwai Nagar, New DelhiNew DelhiDelhi110023390-

Authority Records

MINISTRY OF RAILWAYS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9538645.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 16 Items Sign in for GEM prices

#1

SOR 1

Supply of 15 TR chilled water based precision AC units (PAHU) working in master-slave mode with in controller unit with three years of warranty.

3 number Delivery: 90 days
#2

SOR 2

Installation, Testing and Commissioning of above units replacing the existing unit as per site conditions.

3 number Delivery: 90 days
#3

SOR 3

Supply and replacement of butterfly water valve (reputed make/ISI mark).

8 number Delivery: 90 days
#4

SOR 4

Supply, installation, testing and commissioning of chilled water pressure gauges (reputed make/ISI mark).

6 number Delivery: 90 days
#5

SOR 5

Supply, installation, testing and commissioning of temperature gauges (reputed make/ISI mark).

6 number Delivery: 90 days
#6

SOR 6

Supply, installation and commissioning of humidfier water piping along with accessories.

40 mtr Delivery: 90 days
#7

SOR 7

Supply and installation of drain piping as per site requirement.

30 mtr Delivery: 90 days
#8

SOR 8

Supply and installation of stands for units.

3 number Delivery: 90 days
#9

SOR 9

Supply and installation of air grills for server room to increase the cooling to optimum level in server room as per the requirement assessed by the bidder.

5 number Delivery: 90 days
#10

SOR 10

Supply and installation of return air grills for the data centre as per site requirement and for ensuring optimum cooling.

10 mtr Delivery: 90 days
#11

SOR 11

Rectification/modification of chilled water pipe as per site requirement including all accessories.

40 mtr Delivery: 90 days
#12

SOR 12

Supply and installation of the Y stainer for PAHU inlet

3 number Delivery: 90 days
#13

SOR 13

Any civil work required for the above work completion (Bidder must visit the site for the inspection and check for civil work requirements and quote accordingly.

1 lumsum Delivery: 90 days
#14

SOR 14

Comprehensive AMC of AC units for 5 years post 3 years warranty period.

5 year Delivery: 2,190 days
#15

SOR 15

Supply of components which are required to be replaced periodically to meet out the obligations of comprehensive AMC. Bidder to mention the details (names of items, their qty., periodicity of change, and item wise & total cost of replacement during the entire period of warranty and AMC i.e. 3+5 years

1 lumsum Delivery: 90 days
#16

SOR 16

Buyback of 11/15 existing Stulz make SEC500CW units including unit stands.

3 number Delivery: 90 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC)

8

Additional Doc 3 (Requested in ATC)

9

Additional Doc 4 (Requested in ATC)

10

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

11

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer