TenderDekho Logo
GEM

Bids are Invited For Spade (V2) in PANNA, MADHYA PRADESH

Bid Publish Date

20-Feb-2026, 1:26 pm

Bid End Date

02-Mar-2026, 2:00 pm

EMD

₹5,000

Progress

Issue20-Feb-2026, 1:26 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

A tender has been published for Board Of Secondary Education Spade (V2) (Q4) in PANNA, MADHYA PRADESH. Quantity: 1 by. Submission Deadline: 02-03-2026 14: 00: 00. Check eligibility and apply.

Documents 4

GeM-Bidding-9018346.pdf

Main Document

Other Documents

OTHER

CATALOG-Specification-1

CATALOG Specification

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

SPADE

Board Of Secondary Education

PANNA, MADHYA PRADESH

Posted: 26 April 2025
Closed: 6 May 2025
GEM

SPADE

Board Of Secondary Education

PANNA, MADHYA PRADESH

Posted: 26 April 2025
Closed: 6 May 2025
GEM

SPADE

Indian Army

Posted: 28 August 2025
Closed: 8 September 2025
GEM

SPADE

N/a

SHAHJAHANPUR, UTTAR PRADESH

Posted: 5 March 2025
Closed: 17 March 2025
GEM

SPADE

N/a

MUZAFFARNAGAR, UTTAR PRADESH

Posted: 4 March 2025
Closed: 14 March 2025
GEM

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Dimensional Parameters Length of Blade in mm (tolerance (+-10mm) 300mm
Dimensional Parameters Width of Blade in mm (tolerance +-10mm) 150mm
Dimensional Parameters Thickness of Blade sheet in mm (tolerance +-0.3mm) 2.5mm
Dimensional Parameters Length of shaft in mm (tolerance +- 50mm) 900mm
Dimensional Parameters Diameter of Shaft in mm (tolerance +- 10mm ) 75mm
Material Parameters Material of Blade Mild Steel
Material Parameters Type of Handle Straight

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

11

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer