TenderDekho Logo
GEM

Indian Army White Board & Misc Goods Tender Jorhat Assam 2025 - ISI/IS 550 Style Compliance Noted & 63A Switch Requirement

Bid Publish Date

04-Dec-2025, 6:32 pm

Bid End Date

15-Dec-2025, 7:00 pm

Location

Progress

Issue04-Dec-2025, 6:32 pm
Technical12-May-2025, 10:17 pm
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

37

Category

WHITE BOARD 3X4

Bid Type

Two Packet Bid

Key Highlights

  • Organization: Indian Army
  • Location: Jorhat, Assam
  • Category includes: WHITE BOARD 3X4, ROPE JUTE H AND V, CHANGEOVER SWITCH 63AMP, PAPER SHREDDER, AMPLIFIER 500W, COLLAR MIKE, EXTENSION BOARD
  • Quantity flexibility: up to 25% increase/decrease at contract placement and during currency
  • Advance sample process: 2 samples required within 5 days of award; approval/modifications within 5 days
  • Detailed Design Drawings: required approval from buyer before fabrication; delays in approval extend delivery with no LD
  • Delivery/extension rules: calculated extension time based on quantity change; minimum 30 days
  • Scope: Only supply of goods; no BOQ quantities specified in data

Categories 9

Tender Overview

Indian Army (Department Of Military Affairs) invites bids for the procurement of multiple classroom and auxiliary items including a WHITE BOARD 3X4, ROPE JUTE H AND V, CHANGEOVER SWITCH 63AMP, PAPER SHREDDER, AMPLIFIER 500W, COLLAR MIKE, and EXTENSION BOARD in JORHAT, ASSAM – 785001. The procurement scope is strictly Only supply of Goods across 7 items (BOQ shows 7 entries). The buyer reserves a quantity adjustment of up to 25% during contract formation and execution. Bidders must submit Detailed Design Drawings within 5 days of award and comply with any drawing modifications communicated by the buyer. An advance sample (2 units) must be approved before bulk manufacturing, with the same 5-day window for approval or modification lists. Delivery timelines may be adjusted if approvals lag, with LD not applicable for buyer-approved delays. This tender emphasizes strict adherence to buyer-specified drawings and samples as the baseline for delivery.

  • Organization: Indian Army
  • Location: Jorhat, Assam
  • Category/Items: WHITE BOARD 3X4, ROPE JUTE H and V, CHANGEOVER SWITCH 63AMP, PAPER SHREDDER, AMPLIFIER 500W, COLLAR MIKE, EXTENSION BOARD
  • Quantity/Value: Not disclosed; 7 items in BOQ; EMD not specified
  • Key differentiator: Mandatory drawings approval, advance samples, option for quantity variation up to 25%

Technical Specifications & Requirements

  • No explicit product specifications available in the tender data
  • Scope: Only supply of Goods for the listed items
  • Critical process requirements include: submission of Detailed Design Drawings within 5 days of award; buyer to approve or return with modification list within 5 days; advance 2-sample approval before bulk production; samples supplied free of cost unless otherwise specified; if drawing/sample approval delays occur, delivery period is re-fixed with no LD
  • Delivery timeline adjustments are tied to drawing/sample approval periods; no technical performance metrics specified
  • No ISI/ISO standards, brand mandates, or OEM restrictions mentioned in the provided data

Terms & Eligibility

  • Option clause allows ±25% quantity variation during contract and extended delivery time calculations: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • Advance sample requirements: submit 2 samples within 5 days; approval or modification list within 5 days; bulk supply to reflect approved sample
  • Drawings approval: Detailed Design Drawings to be approved by buyer before fabrication; non-approval may extend delivery without LD
  • Scope: Supply of Goods only; all related samples/test costs borne by contractor unless stated otherwise
  • EMD/Financial terms: not specified in the data; GST/PAN not listed; no explicit payment terms or warranty details provided

Key Specifications

  • Product/service names and categories: WHITE BOARD 3X4, ROPE JUTE H AND V, CHANGEOVER SWITCH 63A, PAPER SHREDDER, AMPLIFIER 500W, COLLAR MIKE, EXTENSION BOARD

  • Quantities: not specified in tender data (BOQ shows 7 items, values not disclosed)

  • EMD/Estimated value: not disclosed

  • Experience requirements: not specified in tender data

  • Quality/standards: none specified; no ISI/ISO requirements listed

  • Delivery/installation: supply-only; drawings and sample approvals required

Terms & Conditions

  • 25% quantity variation right at order and during contract

  • Approval cycle: Detailed Design Drawings within 5 days of award

  • Advance samples: 2 units required within 5 days for approval

  • Delivery timelines may extend for approvals with no Liquidated Damages

  • Scope: supply of Goods only; no fabrication or installation services described

Important Clauses

Payment Terms

Not specified in tender data

Delivery Schedule

Delivery period adjustable based on drawing/sample approvals; minimum 30 days extension rule for increased quantity

Penalties/Liquidated Damages

No LD mentioned; delays due to buyer drawing/sample approvals may re-fix delivery without LD

Bidder Eligibility

  • Evidence of capability to supply multi-item goods

  • Compliance with advanced drawing and sample approval process

  • Financial capability to handle 7-item procurement (values not disclosed)

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

WHITE BOARD 3X4 , ROPE JUTE H AND V , CHANGEOVER SWITCH 63AMP , PAPER SHREDDER , AMPLIFIER 500W , COLLAR MIKE , EXTENSION BOARD

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8674505.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

WHITE BOARD 3X4

WHITE BOARD 3X4

3 nos Delivery: 10 days
#2

ROPE JUTE H AND V

ROPE JUTE H AND V

25 mtr Delivery: 10 days
#3

CHANGEOVER SWITCH 63AMP

CHANGEOVER SWITCH 63AMP

1 nos Delivery: 10 days
#4

PAPER SHREDDER

PAPER SHREDDER

1 nos Delivery: 10 days
#5

AMPLIFIER 500W

AMPLIFIER 500W

1 nos Delivery: 10 days
#6

COLLAR MIKE

COLLAR MIKE

1 nos Delivery: 10 days
#7

EXTENSION BOARD

EXTENSION BOARD

5 nos Delivery: 10 days

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply contracts

4

Financial statements (profit & loss, balance sheet) for the last 2-3 years

5

EMD/Security deposit documentation (amount not specified in data)

6

Technical bid documents showing compliance with drawings/samples

7

OEM authorizations or dealer certifications if applicable

Technical Results

S.No Seller Item Date Status
1
jorhat refrigeration   Under PMA
-05-12-2025 22:17:48
2
M/S RADHA TRADERS   Under PMA
-13-12-2025 15:59:08
3
M/S SHIV SHAKTI TRADERS   Under PMA
-04-12-2025 23:15:14
4
MOHAN AND COMPANY   Under PMA
-13-12-2025 00:27:22

Financial Results

Rank Seller Price Item
L1
M/S SHIV SHAKTI TRADERS   Under PMA
Item Categories : WHITE BOARD 3X4,ROPE JUTE H AND V,CHANGEOVER SWITCH 63AMP,PAPER SHREDDER,AMPLIFIER 500W,COLLAR MIKE
L2
MOHAN AND COMPANY (MSE)( MSE Social Category:General )    Under PMA
Item Categories : WHITE BOARD 3X4,ROPE JUTE H AND V,CHANGEOVER SWITCH 63AMP,PAPER SHREDDER,AMPLIFIER 500W,COLLAR MIKE
L3
jorhat refrigeration (MSE)( MSE Social Category:General )    Under PMA
Item Categories : WHITE BOARD 3X4,ROPE JUTE H AND V,CHANGEOVER SWITCH 63AMP,PAPER SHREDDER,AMPLIFIER 500W,COLLAR MIKE

Frequently Asked Questions

Key insights about ASSAM tender market

How to bid for Indian Army tender in Jorhat Assam 2025

Bidders must submit GST, PAN, financials, experience certificates, and technical bid documents. The tender requires approval of Detailed Design Drawings within 5 days of award and 2 advance samples for approval. Ensure compliance with the scope of supply and submit any OEM authorizations if applicable.

What documents are required for Indian Army goods tender in Assam

Required documents include GST registration, PAN card, business license, last 3 years financial statements, experience certificates for similar supply, EMD documentation, technical bid, and OEM authorization letters where applicable. Prepare samples for approval as per purchase terms.

What are the delivery terms for 7-item goods supply tender in Jorhat

Delivery timelines are linked to approval of Detailed Design Drawings and advance samples. If approvals delay, delivery period is re-fixed with no liquidated damages. The option to increase quantity up to 25% exists and affects delivery calculations.

What are the key technical requirements for the items listed

The tender explicitly lists items but provides no technical specifications. The process requires the submission of detailed drawings and advance samples. Ensure readiness to supply a 3x4 whiteboard, rope jute components, 63A changeover switch, and other listed goods as per buyer-approved drawings.

When is the sample approval deadline in this procurement

Two advance samples must be submitted within 5 days of award. The buyer will approve or provide a list of modifications within 5 days. Delays in approval imply a re-fixed delivery timeline without LD penalties.

What standards or brand requirements are specified for this bid

No explicit standards (IS/ISO/ISI) or brand/OEM requirements are specified in the available data. Bidders should rely on buyer-approved drawings and sample conformity to ensure compliance with the contract specifications.

What is the scope of supply for this Indian Army tender

The scope is limited to the supply of goods only, covering 7 listed items. The BOQ items are not quantified in the data, and the submission must include compliant samples and drawings as part of the bid package.

What is the impact of the 25% option clause on delivery timelines

The option clause allows a 25% quantity variance. Delivery time scales with the increased or decreased quantity using a formula, with a minimum extension of 30 days. Original delivery periods apply if not specified.