TenderDekho Logo
Closed GEM

Bharat Heavy Electricals Limited GI Strip & GI Pipe Tender 2025 - Heavy Industry Procurement in India

Bid Publish Date

05-Nov-2025, 11:15 am

Bid End Date

15-Nov-2025, 1:00 pm

Progress

RA
Issue05-Nov-2025, 11:15 am
Reverse AuctionCompleted
Award17-Dec-2025, 1:38 am

Key Highlights

  • • GI STRIP 75X10, GI STRIP 50X6, 35x6 GI STRIP, 25 x 3 GI Strip, 65MM 3M GI PIPE ELECTROD HVY DUTY CL-C
  • • Option Clause: quantity increase/decrease up to 25% at contracted rates
  • • Delivery time adjustment calculation: (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
  • • Data Sheet must exactly match product specifications; mismatch could lead to bid rejection

Tender Overview

Bharat Heavy Electricals Limited invites bids for procurement of GI STRIP 75X10, GI STRIP 50X6, 35x6 GI STRIP, 25 x 3 GI Strip, 65MM 3M GI PIPE ELECTROD HVY DUTY CL-C under the Department of Heavy Industry. The BOQ lists 5 items with unspecified quantities, and an estimated value is not disclosed. The tender includes an option clause allowing up to 25% quantity variance at contracted rates, with delivery time adjustments calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days. Key differentiator is the option-based expansion and strict term compliance. This tender focuses on metallic strips and heavy-duty GI pipes, typical for electrical/mechanical infrastructure projects. The organization emphasizes data-sheet validation and non-liquidation declarations, signaling a compliance-driven bid environment.

Technical Specifications & Requirements

  • Item scope includes GI STRIPs in multiple dimensions and a 65MM 3M GI PIPE ELECTROD HVY DUTY CL-C.
  • Data Sheet must be uploaded and match offered parameters; mismatches may cause rejection.
  • End User Certificate handling follows Buyer format when required.
  • 2 key compliance terms: non-liquidation status for bidders and end-to-end data validation.
  • The tender imposes an option clause enabling quantity changes up to 25% during and after contract formation.
  • No specific performance metrics or ISO/BIS standards are listed; emphasis is on documentation and contract terms.

Terms, Conditions & Eligibility

  • EMD/secure payment terms not numerically specified in the provided data; bidders must assume standard government practice unless stated otherwise.
  • Bidder must provide PAN, GSTIN, cancelled cheque, and EFT mandate duly certified by bank.
  • Data Sheet and End User Certificate procedures must be adhered to; non-compliance risks bid rejection.
  • The contract may be terminated for non-compliance, delivery failure, bankruptcy, or misrepresentation.
  • The supplier must avoid liquidation proceedings and maintain financial standing; an undertaking is required.
  • Overall, this procurement is structured around compliance, documentation rigor, and flexible quantity management to accommodate project needs.

Key Specifications

    • Product names: GI STRIP 75X10, GI STRIP 50X6, 35x6 GI STRIP, 25 x 3 GI Strip, 65MM 3M GI PIPE ELECTROD HVY DUTY CL-C
    • Quantities: Not disclosed in BOQ; 5 items stated
    • EMD/Estimated value: Not specified
    • Delivery: Conditional on option clause; minimum 30 days if extended
    • Compliance: Data Sheet must align with offered parameters; End User Certificate format when required
    • Eligibility: No liquidation or bankruptcy; undertakings required

Terms & Conditions

  • Option clause permits ±25% quantity variation at contract rates

  • Delivery period adjustments calculated by (increased quantity/original quantity) × original period

  • Bidder must provide PAN, GSTIN, cancelled cheque, EFT Mandate; Data Sheet must match

  • End User Certificate provided in Buyer format when requested

  • Contract termination triggers include non-delivery, misrepresentation, bankruptcy

  • Undertaking on non-liquidation status required from bidders

Important Clauses

Payment Terms

Not explicitly stated; infer standard government terms apply unless noted

Delivery Schedule

Delivery time aligned with option clause; min 30 days for increased quantity

Penalties/Liquidated Damages

Contract termination possible for repeated delivery delays or non-compliance

Bidder Eligibility

  • Not under liquidation or bankruptcy; non-contravention undertaking required

  • Ability to supply GI strips and heavy-duty GI pipes meeting tender scope

  • Compliance with data sheet verification and End User Certificate procedures

Advertisement

Technical Results

S.No Seller Item Date Status
1
ADEEP INDUSTRIES   Under PMA
-14-11-2025 17:02:09
2
ADVANCE POWER PRODUCTS LLP   Under PMA
-15-11-2025 12:47:13
3
DHRUVA TECHNOLOGIES PRIVATE LIMITED   Under PMA
-14-11-2025 17:27:30
4
HI-TECH ENGINEERS   Under PMA
-14-11-2025 16:45:29
5
INDIA ELECTRICALS SYNDICATE   Under PMA
-07-11-2025 11:08:33
6
M/S SARAL INDUSTRIES   Under PMA
-06-11-2025 22:04:03
7
PATNY SYSTEMS PVT LTD   Under PMA
-14-11-2025 12:57:35
8
PINAX STEEL INDUSTRIES PRIVATE LIMITED   Under PMA
-15-11-2025 12:43:35
9
PREMIER POWER PRODUCTS (CALCUTTA) PVT LTD.   Under PMA
-14-11-2025 18:04:37
10
Rajasthan Metal Smelting Co.   Under PMA
-15-11-2025 11:53:50
11
SREE JAGANNATH ENGINEERING WORKS   Under PMA
-14-11-2025 17:16:59

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1PINAX STEEL INDUSTRIES PRIVATE LIMITED(MII)   Under PMA Winner ₹32,63,051Item Categories : GI STRIP 75X10,GI STRIP 50X6,35x6 GI STRIP,25 x 3 GI Strip,65MM 3M GI PIPE ELECTROD HVY DUTY CL-C
L2ADVANCE POWER PRODUCTS LLP (MSE,MII)   Under PMA₹32,66,868Item Categories : GI STRIP 75X10,GI STRIP 50X6,35x6 GI STRIP,25 x 3 GI Strip,65MM 3M GI PIPE ELECTROD HVY DUTY CL-C
L3INDIA ELECTRICALS SYNDICATE (MSE,MII)   Under PMA₹33,95,000Item Categories : GI STRIP 75X10,GI STRIP 50X6,35x6 GI STRIP,25 x 3 GI Strip,65MM 3M GI PIPE ELECTROD HVY DUTY CL-C
L4HI-TECH ENGINEERS (MSE,MII)   Under PMA₹34,00,400Item Categories : GI STRIP 75X10,GI STRIP 50X6,35x6 GI STRIP,25 x 3 GI Strip,65MM 3M GI PIPE ELECTROD HVY DUTY CL-C
L5SREE JAGANNATH ENGINEERING WORKS (MSE,MII)   Under PMA₹34,50,393Item Categories : GI STRIP 75X10,GI STRIP 50X6,35x6 GI STRIP,25 x 3 GI Strip,65MM 3M GI PIPE ELECTROD HVY DUTY CL-C
L6DHRUVA TECHNOLOGIES PRIVATE LIMITED (MII)   Under PMA₹35,74,000Item Categories : GI STRIP 75X10,GI STRIP 50X6,35x6 GI STRIP,25 x 3 GI Strip,65MM 3M GI PIPE ELECTROD HVY DUTY CL-C
L7PREMIER POWER PRODUCTS (CALCUTTA) PVT LTD. (MII)   Under PMA₹36,96,889Item Categories : GI STRIP 75X10,GI STRIP 50X6,35x6 GI STRIP,25 x 3 GI Strip,65MM 3M GI PIPE ELECTROD HVY DUTY CL-C
L8ADEEP INDUSTRIES (MSE,MII)   Under PMA₹37,84,850Item Categories : GI STRIP 75X10,GI STRIP 50X6,35x6 GI STRIP,25 x 3 GI Strip,65MM 3M GI PIPE ELECTROD HVY DUTY CL-C
L9PATNY SYSTEMS PVT LTD (MII)   Under PMA₹40,21,971Item Categories : GI STRIP 75X10,GI STRIP 50X6,35x6 GI STRIP,25 x 3 GI Strip,65MM 3M GI PIPE ELECTROD HVY DUTY CL-C
L10M/S SARAL INDUSTRIES (MSE,MII)   Under PMA₹41,44,000Item Categories : GI STRIP 75X10,GI STRIP 50X6,35x6 GI STRIP,25 x 3 GI Strip,65MM 3M GI PIPE ELECTROD HVY DUTY CL-C

🎉 L1 Winner

PINAX STEEL INDUSTRIES PRIVATE LIMITED(MII)   Under PMA

Final Price: ₹32,63,051

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Reverse Auction Schedule

Completed

Start

02-Dec-2025, 4:00 pm

End

03-Dec-2025, 5:42 pm

Duration: 26 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

10815

Category

GI STRIP 75X10

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

5 Days

Requirements

Min. Avg. Annual Turnover

16

OEM Avg. Turnover

16

Past Performance

70 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

GI STRIP 75X10 , GI STRIP 50X6 , 35x6 GI STRIP , 25 x 3 GI Strip , 65MM 3M GI PIPE ELECTROD HVY DUTY CL-C

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENTBHARAT HEAVY ELECTRICALS LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8550253.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

GI STRIP 75X10

GI STRIP 75X10_PY9755001018

6,000 m Delivery: 120 days
#2

GI STRIP 50X6

GI STRIP 50X6_PY9755001026

2,500 m Delivery: 120 days
#3

35x6 GI STRIP

35x6 GI STRIP_PY9755001034

800 m Delivery: 120 days
#4

25 x 3 GI Strip

25 x 3 GI Strip_PY9755001093

1,500 m Delivery: 120 days
#5

65MM 3M GI PIPE ELECTROD HVY DUTY CL-C

65MM 3M GI PIPE ELECTROD HVY DUTY CL-C_PY9755002049

15 nos Delivery: 120 days

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate certified by bank

5

Data Sheet of offered products

6

End User Certificate (in Buyer format when applicable)

7

Undertaking confirming bidder’s non-liquidation status

8

Any OEM data sheets or authorizations if applicable

Frequently Asked Questions

Key insights about ODISHA tender market

How to bid for GI strip and pipe tender in India 2025

Bidders should prepare PAN, GSTIN, cancelled cheque, EFT mandate, and a detailed Data Sheet. Ensure data-sheet accuracy and have an undertaking on non-liquidation. The bid must reflect compliance with the option clause allowing up to 25% quantity variation and include End User Certificate format if required by the buyer.

What documents are required for BHEL procurement tender 2025

Submit PAN, GSTIN, cancelled cheque, EFT Mandate, Data Sheet of offered products, and End User Certificate if requested. Include an undertaking confirming non-liquidation status and any OEM authorizations if applicable. Ensure all documents are certified and match the bid’s product specifications.

What are the delivery terms for GI strip tender 2025

Delivery terms rely on the option clause allowing quantity adjustments up to 25%. If quantity increases, the delivery period scales as (increased/original quantity) × original period, with a minimum extension of 30 days. Delivery timelines start from the last date of the original delivery order.

What standards or certifications are required for these GI products

The provided tender data does not list explicit standards; emphasis is on data-sheet accuracy and End User Certificate. Vendors should ensure product data sheets reflect actual specifications and any applicable OEM or industry certifications per internal policy.

When is the bid submission deadline for BHEL GI items

The tender data provided does not include explicit dates. Bidders should monitor the official procurement portal for submission deadlines and ensure timely data-sheet submission, BIDDER undertakings, and all required documents to avoid disqualification.

How to verify data sheet alignment with product specifications

Upload the Data Sheet of offered products and cross-check with the exact item dimensions (75X10, 50X6, 35x6, 25x3, 65MM 3M), material grade, finish, and tolerances. Any mismatch can lead to rejection; ensure the sheet clearly maps to the BOQ items.

What happens if bidder faces delivery delays under the option clause

If delivery is delayed or quantities change, term clauses allow contract adjustments within contracted rates and extended timelines. The minimum extended delivery period is 30 days, ensured by calculating the additional time per the clause formula and extending only within original contract scope.

What is the risk if no BOM is provided for these GI items

Without an accurate Data Sheet/BOM, the bid risks rejection due to parameter mismatches. Provide complete BOM, item dimensions, weights, material grade, coating, and tolerances to comply with procurement requirements.