Progress
Organization: Indian Army, Department Of Military Affairs. Location: JAISALMER, RAJASTHAN - 342302. Procurement scope: multiple barrel handling and lifting equipment including Barrel Trolley, Hydraulic Barrel Stacker with Foot Paddle and Brake Mechanism, Scissor Lift with Rollers capacity, Hydraulic Drum Palletiser capacity, and Electric Barrel Lifter with Decanting and Brake Mechanism. Quantity flexibility: up to 25% increase/decrease at contract award and during currency. ATC/Terms: ATC document references buyer-specific terms; delivery period adjustments calculated by (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. No explicit estimated value or EMD disclosed. This tender covers 5 items in the BOQ with generic placeholders; highlights the need to review ATC for exact compliance.
Key Term 1: Up to 25% quantity variation allowed during contract and currency
Key Term 2: Delivery period adjustments follow a formula with minimum 30 days
Key Term 3: EMD and exact payment terms are not specified in the provided data
No explicit payment terms published; verify in ATC and tender documents; ensure alignment with delivery milestones
Delivery begins from the last date of original delivery order; extended periods calculated as (Increased quantity ÷ Original quantity) × Original delivery period; minimum 30 days
Not specified in available data; confirm LD provisions in ATC and contract documents
Experience in supplying or maintaining barrel handling and lifting equipment
Demonstrated ability to meet delivery schedules under military procurement terms
Compliance with ATC terms and safety standards for military equipment
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | M/S TARUNA CONSTRUCTION COMPANY Under PMA | - | 23-08-2026 17:46:06 | |
| 2 | STACKER S AND MOVER S (I) MFG. CO. Under PMA | - | 21-08-2026 13:48:04 | |
| 3 | SUNCITY ENTERPRISES Under PMA | - | 23-08-2026 15:06:58 | |
| 4 | VAASUJI ENTERPRISES Under PMA | - | 23-08-2026 22:27:28 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SUNCITY ENTERPRISES(MSE)( MSE Social Category:OBC ) Under PMA | Item Categories : Barrel Trolley,Hydraulic Barrel Stacker with Foot Paddle and Brake Mechanism,Scissor Lift with Roll | |
| L2 | VAASUJI ENTERPRISES (MSE)( MSE Social Category:OBC ) Under PMA | Item Categories : Barrel Trolley,Hydraulic Barrel Stacker with Foot Paddle and Brake Mechanism,Scissor Lift with Roll | |
| L3 | M/S TARUNA CONSTRUCTION COMPANY (MSE)( MSE Social Category:OBC ) Under PMA | Item Categories : Barrel Trolley,Hydraulic Barrel Stacker with Foot Paddle and Brake Mechanism,Scissor Lift with Roll |
Quantity
7
Category
Barrel Trolley
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
1
OEM Avg. Turnover
1
Past Performance
30 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Barrel Trolley , Hydraulic Barrel Stacker with Foot Paddle and Brake Mechanism , Scissor Lift with Rollers capacity , Hydraulic Drum Palletiser capacity , Electric Barrel Lifter and Decanting with Brake Mechanism
Pre-Bid Date
17-08-2026 10:00:00
Pre-Bid Venue
OC, 199 PET PL ASC
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
JAISALMER
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | JAISALMER | JAISALMER | - | - | 3 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Barrel Trolley
Barrel Trolley
Hydraulic Barrel Stacker with Foot Paddle and Brake Mechanism
Hydraulic Barrel Stacker with Foot Paddle and Brake Mechanism
Scissor Lift with Rollers capacity
Scissor Lift with Rollers capacity
Hydraulic Drum Palletiser capacity
Hydraulic Drum Palletiser capacity
Electric Barrel Lifter and Decanting with Brake Mechanism
Electric Barrel Lifter and Decanting with Brake Mechanism
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Barrel Trolley | Barrel Trolley | 3 | nos | gem_clk | 45 | |
| 2 | Hydraulic Barrel Stacker with Foot Paddle and Brake Mechanism | Hydraulic Barrel Stacker with Foot Paddle and Brake Mechanism | 1 | nos | gem_clk | 45 | |
| 3 | Scissor Lift with Rollers capacity | Scissor Lift with Rollers capacity | 1 | nos | gem_clk | 45 | |
| 4 | Hydraulic Drum Palletiser capacity | Hydraulic Drum Palletiser capacity | 1 | nos | gem_clk | 45 | |
| 5 | Electric Barrel Lifter and Decanting with Brake Mechanism | Electric Barrel Lifter and Decanting with Brake Mechanism | 1 | nos | gem_clk | 45 |
GST Registration Certificate
Permanent Account Number (PAN) Card
Experience Certificates (relevant to barrel handling equipment)
Financial Statements / Balance Sheets (last 2-3 years)
EMD submission proof (if required in ATC)
Technical bid documents / compliance certificates
OEM authorizations or dealership certificates (if required by ATC)
Key insights about RAJASTHAN tender market
To bid, submit the required bidder documents (GST, PAN, experience, financials, OEM authorizations) and ensure compliance with the ATC terms. Prepare technical bid showing product names: Barrel Trolley, Hydraulic Barrel Stackers, Scissor Lift, Hydraulic Drum Palletiser, and Electric Barrel Lifter with Decanting. Review the 25% quantity variation clause and delivery-time formula prior to submission.
Required documents include GST certificate, PAN card, 2-3 years of financial statements, experience certificates for similar equipment, OEM authorizations if applicable, and proof of EMD submission (if demanded in ATC). Technical bid and safety compliance certificates should be included to demonstrate capability.
Delivery starts after the original delivery order. If quantity changes by up to 25%, the additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extensions may reach the original delivery period. Verify exact periods in ATC.
Categories include Barrel Trolley, Hydraulic Barrel Stackers with Foot Paddle and Brake, Scissor Lift with Rollers, Hydraulic Drum Palletiser, and Electric Barrel Lifter with Decanting Brake. No discrete technical specs are provided in the data; await ATC for dimensions and capacities.
No EMD amount is disclosed in the available tender data. Bidders should check the ATC document to confirm whether an EMD is required, along with acceptable payment method and validity period.
The current data does not specify standards; bidders must rely on ATC for any mandatory safety standards, compliance certificates, and OEM authorizations. Prepare ISO/IS standards alignment and safety testing plans if demanded by ATC.
BOQ shows 5 items with N/A quantities; bidders should review the BOQ/ATC attachments for exact item quantities, unit measurements, and delivery milestones. Ensure your proposal aligns item-by-item with the Army’s listed equipment names.
The option clause permits 25% quantity variation at award and during currency, at contracted rates. Plan for scale-up or scale-down in supply chain, ensure pricing remains valid for adjusted volumes, and align delivery planning with extended timelines if exercised.