Wilfit 1,Wilfit 2,Wilfit 3,Wilfit 4,Wilfit 5,Wilfit 6,Wilfit 7,Wilfit 8,Wilfit 9
Indian Army
TIRUVALLUR, TAMIL NADU
Bid Publish Date
03-Nov-2025, 11:43 am
Bid End Date
14-Nov-2025, 12:00 pm
EMD
₹18,896
Location
Progress
RAQuantity
2337
Category
Wilfit 1
Bid Type
Two Packet Bid
The Indian Army under the Department Of Military Affairs issues a tender for multiple Wilfit categories (Wilfit 1–Wilfit 7) with an EMD of ₹18,896. The procurement scope includes 7 items (BOQ shows N/A quantities) and requires a functional service centre in each consignee state for carry-in warranties or on-site warranty where applicable. A Detailed Design Drawing approval is required within 5 days of award, with buyer-approved modifications within another 5 days. The estimated value is not disclosed; bidding hinges on turnover and bank guarantees, with FDR-based EMD allowed. The contract emphasizes pre/post-dispatch inspection and strict adherence to approved drawings to avoid LD due to drawing delays.
EMD amount: ₹18,896
Service centre requirement: in every state of consignee locations for carry-in warranty
Detailed Design Drawings: submission within 5 days of award; approval within 5 days or modification list provided
Inspection: Pre-dispatch at Seller premises or Post receipt at consignee site as per ATC
Delivery terms: LD may be waived if drawing approval delay is Buyer-caused
FDR-based EMD: bank endorsement required; hardcopy delivered within 5 days of bid end date
Service centres must be established within 30 days if not existing; documentary proof required for payment release
Detailed design drawings must be approved by Buyer within 5 days of award; non-approval triggers delivery re-schedule without LD
Turnover evidence for last 3 financial years; audited statements or CA certificate; turnover threshold specified in bid document
Payment release linked to submission of functional/service centre proof and EMD/FDR endorsement; LD applicability depending on drawing approval delays
Delivery period subject to drawing approval; if Buyer delays, delivery timeline re-fixed without LD
LD applicable for delays not attributable to Buyer drawing approval; specifics to be defined in ATC
Minimum average turnover over last 3 financial years as per bid document
Functional Service Centre presence or commitment to establish within 30 days of award
Compliance with EMD/FDR submission and endorsement requirements
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
TIRUVALLUR, TAMIL NADU
Indian Army
TIRUVALLUR, TAMIL NADU
Indian Army
TIRUVALLUR, TAMIL NADU
Indian Army
TIRUVALLUR, TAMIL NADU
Indian Army
TIRUVALLUR, TAMIL NADU
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Wilfit 1 | LV7/MARUTI 15410M830A1 FILTER ASSEMBLY FUEL | 316 | nos | procoffr3@9dou | 30 |
| 2 | Wilfit 2 | LV7/STLN 2520-72-0473321 SPEEDO METER CABLE | 54 | nos | procoffr3@9dou | 30 |
| 3 | Wilfit 3 | LV7/TATA 2654-7231-0120 DOOR LOCK FRONT LH | 34 | nos | procoffr3@9dou | 30 |
| 4 | Wilfit 4 | LV7/STLN 5930-001314 BLACK OUT CHANGE OVER | 29 | nos | procoffr3@9dou | 30 |
| 5 | Wilfit 5 | LV7/MARUTI 09481M10102 FUSE 10 AMP | 1,293 | nos | procoffr3@9dou | 30 |
| 6 | Wilfit 6 | LV7/STLN 6220-72-0472414 LIGHT FOG | 592 | nos | procoffr3@9dou | 30 |
| 7 | Wilfit 7 | LV7/STLN 6350-72-0000099 HORN ELECTRICAL | 19 | nos | procoffr3@9dou | 30 |
GST registration certificate
PAN card
Audited financial statements for the last 3 years or CA certificate indicating turnover
Evidence of EMD submission (FDR if chosen) and endorsement
Technical bid documents showing compliance with buyer terms
OEM authorizations (if applicable) and service center details
Experience certificates for similar Wilfit procurement
Start
21-Nov-2025, 9:00 pm
End
22-Nov-2025, 9:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | M/S DEEPAK ENTERPRISES(MII) Under PMA Winner | ₹6,27,697 | Item Categories : Wilfit 1,Wilfit 2,Wilfit 3,Wilfit 4,Wilfit 5,Wilfit 6,Wilfit 7 |
| L2 | M/S GULSHAN LAL (MII) Under PMA | ₹6,53,559 | Item Categories : Wilfit 1,Wilfit 2,Wilfit 3,Wilfit 4,Wilfit 5,Wilfit 6,Wilfit 7 |
| L3 | M/S SAT TRADERS (MII) Under PMA | ₹7,07,540 | Item Categories : Wilfit 1,Wilfit 2,Wilfit 3,Wilfit 4,Wilfit 5,Wilfit 6,Wilfit 7 |
🎉 L1 Winner
M/S DEEPAK ENTERPRISES(MII) Under PMA
Final Price: ₹6,27,697
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, three-year turnover evidence (audited or CA certificate), and EMD using either payment or FDR with endorsement. Include OEM authorizations and service centre details. Submit Detailed Design Drawings within 5 days of award and respond to Buyer modification lists within 5 days. Ensure inspection options align with ATC.
Submit proof of functional service centre in each consignee state's location or a commitment letter to establish within 30 days of award. Include certificate of registration, service capability overview, and contact details. Payment release depends on service centre evidence and performance readiness for carry-in warranty.
Inspection may be Pre-dispatch at Seller premises if ATC selects it, or Post receipt inspection at the consignee site. The chosen option will be indicated in ATC; ensure compliance with inspection criteria and readiness for rapid acceptance testing to avoid delays.
EMD can be provided as Fixed Deposit Receipt (FDR) in favor of A/C CO, 9 INF DOU, C/O 56 APO, with bank endorsement. Upload scanned FDR copy with bid and deliver hardcopy within 5 days of bid end date. Endorsement should permit withdrawal only on demand or with pledgee sanction.
Successful bidders must submit Detailed Design Drawings within 5 days of award for Buyer approval. If the buyer lists modifications, those must be incorporated. Delivery period may be refixed if there is a drawing approval delay, with no LD charged for the buyer-induced delay.
Provide the average annual turnover for the last three financial years ending 31st March, supported by audited balance sheets or a CA/CMA certificate indicating turnover. If the bidder is under 3 years old, use completed years post-incorporation for turnover calculations.
Payment terms rely on documentary evidence and approval milestones, with LD applicable only for supplier delays not caused by Buyer drawing approvals. Exact percentages and milestone dates are defined in the ATC and contract, with potential 30-day payment windows after acceptance depending on supply chain compliance.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS