Bid Publish Date
14-Nov-2025, 6:58 pm
Bid End Date
25-Nov-2025, 7:00 pm
Location
Progress
Quantity
11
Category
Pressure Plate
Bid Type
Two Packet Bid
The Indian Army, Department of Military Affairs, invites bids for a range of vehicle spares and assemblies including pressure plate, clutch plate, release bearing, fuel pump assembly, lamp assembly (right-hand), spacer washer, top clamp, relay valve front, clutch cylinder assembly, de-aeration tank, and fog light assembly. Location: Baramulla, Jammu & Kashmir (193101). The BOQ lists 11 items but specifications are not disclosed. The procurement incorporates an option clause permitting ±25% quantity variation at contracted rates and a delivery timeline governed by the last original delivery order. A unique warranty framework ties performance to the Defence Food Specification, with post-acceptance sampling by CFL/FIU. The tender emphasizes compliance with Defence-related standards and inspection protocols, signaling a defense-aerospace/defense-vehicle spares scope.
Option clause enabling +/-25% quantity variation at contracted rates and extended delivery time calculations
Warranty tied to Defence Food Specification with post-acceptance sampling by CFL/FIU
CFL/FIU sampling process requires supplier presence within three working days for sample collection
Not specified in available data; bidders should align with standard defense procurement payment practices upon DFS conformity and acceptance
Delivery period starts from the last date of the original delivery order; additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days
Not specified in available data; bidders should assume standard penalties for delivery delays as per defense procurement norms
Experience in supplying defense vehicle spares or DFS-compliant products
Demonstrated ability to meet DFS conformity criteria and post-acceptance sampling requirements
Regulatory compliance with GST and PAN; ability to provide financial statements and performance history
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Pressure Plate , Clutch Plate , Release Bearing , Fuel Pump Assy , Lamp Assy Comb RH , Spacer Washer , Top Clamp , Relay Valve Front , Clutch Cylinder assy , De-aeration tank , Fog Light Assy
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Pressure Plate
Pressure Plate
Clutch Plate
Clutch Plate
Release Bearing
Release Bearing
Fuel Pump Assy
Fuel Pump Assy
Lamp Assy Comb RH
Lamp Assy Comb RH
Spacer Washer
Spacer Washer
Top Clamp
Top Clamp
Relay Valve Front
Relay Valve Front
Clutch Cylinder assy
Clutch Cylinder assy
De-aeration tank
De-aeration tank
Fog Light Assy
Fog Light Assy
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Pressure Plate | Pressure Plate | 1 | nos | [email protected] | 15 | |
| 2 | Clutch Plate | Clutch Plate | 1 | nos | [email protected] | 15 | |
| 3 | Release Bearing | Release Bearing | 1 | nos | [email protected] | 15 | |
| 4 | Fuel Pump Assy | Fuel Pump Assy | 1 | nos | [email protected] | 15 | |
| 5 | Lamp Assy Comb RH | Lamp Assy Comb RH | 1 | nos | [email protected] | 15 | |
| 6 | Spacer Washer | Spacer Washer | 1 | nos | [email protected] | 15 | |
| 7 | Top Clamp | Top Clamp | 1 | nos | [email protected] | 15 | |
| 8 | Relay Valve Front | Relay Valve Front | 1 | nos | [email protected] | 15 | |
| 9 | Clutch Cylinder assy | Clutch Cylinder assy | 1 | nos | [email protected] | 15 | |
| 10 | De-aeration tank | De-aeration tank | 1 | nos | [email protected] | 15 | |
| 11 | Fog Light Assy | Fog Light Assy | 1 | nos | [email protected] | 15 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates of similar defense vehicle spares supply
Financial statements (last 2-3 years)
EMD/Security deposit documents (if applicable per tender terms)
Technical bid documents demonstrating DFS conformity or related standards
OEM authorizations or supplier certificates (if applicable)
Defence-specific quality certificates or DFS compliance evidence
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ABBAZ TRADERS Under PMA | - | 17-11-2025 21:32:26 | |
| 2 | CHINAR ENTERPRISES Under PMA | - | 16-11-2025 16:35:02 | |
| 3 | RAINA ENTERPRISES Under PMA | - | 17-11-2025 21:45:27 | |
| 4 | SURJEET SINGH & BROTHERS Under PMA | - | 19-11-2025 11:32:05 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | CHINAR ENTERPRISES(MSE)( MSE Social Category:General ) Under PMA | Item Categories : Pressure Plate,Clutch Plate,Release Bearing,Fuel Pump Assy,Lamp Assy Comb RH,Spacer Washer,Top Clam | |
| L2 | RAINA ENTERPRISES Under PMA | Item Categories : Pressure Plate,Clutch Plate,Release Bearing,Fuel Pump Assy,Lamp Assy Comb RH,Spacer Washer,Top Clam | |
| L3 | ABBAZ TRADERS Under PMA | Item Categories : Pressure Plate,Clutch Plate,Release Bearing,Fuel Pump Assy,Lamp Assy Comb RH,Spacer Washer,Top Clam | |
| L4 | SURJEET SINGH & BROTHERS Under PMA | Item Categories : Pressure Plate,Clutch Plate,Release Bearing,Fuel Pump Assy,Lamp Assy Comb RH,Spacer Washer,Top Clam |
Key insights about JAMMU AND KASHMIR tender market
Bidders must demonstrate DFS conformity for each vehicle spare item and provide DEFENCE DFS documentation; submit GST, PAN, experience certificates, financial statements, OEM authorizations, and technical bid. Ensure capability to participate in CFL/FIU sampling and comply with the 25% quantity variation option.
Required documents include GST registration, PAN, experience certificates in defense spares, financial statements for the last 2-3 years, EMD documents if applicable, OEM authorizations, and technical compliance certificates demonstrating DFS conformity and warranty terms.
Warranty must cover conformity to Defence Food Specification and defect-free performance; warranty period is as per DFS attached, valid from acceptance; CFL/FIU sampling may occur post-acceptance to verify DFS compliance and product quality.
Delivery period begins from the last date of the original delivery order. If quantities increase by up to 25%, extended time is (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days additional time.
Eligibility relies on DFS compliance, prior defense spares supply experience, GST and PAN validity, financial stability, and OEM authorizations where applicable; bidders must be ready for CFL/FIU sampling post-acceptance.
Key clauses include option quantity variations (±25%), DFS warranty terms, CFL/FIU sampling rights, potential stock acceptance conditions, and delivery timelines; ensure all 11 BOQ items can be supplied with DFS conformity and relevant certifications.
Obtain DFS compliance certificates from the manufacturer or authorized agency; provide documentation proving spares meet DFS criteria, along with testing and sampling readiness for CFL/FIU verification at stock depots.
The BOQ lists 11 items including pressure plate, clutch plate, release bearing, fuel pump assembly, lamp assembly RH, spacer washer, top clamp, relay valve front, clutch cylinder, de-aeration tank, and fog light assembly; exact quantities not disclosed in the data provided.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS