TenderDekho Logo
Closed GEM

Hindustan Petroleum Corporation Ltd Security Equipment Tender 2026 GeM ATC Compliance and Quantity Clause

Bid Publish Date

14-Aug-2026, 10:15 am

Bid End Date

24-Aug-2026, 3:00 pm

Progress

Issue14-Aug-2026, 10:15 am
AwardPending

Tender Overview

Hindustan Petroleum Corporation Ltd invites bids for a security equipment procurement under GeM with an extensive clause set. The BoQ lists 129 items, though itemized quantities are not disclosed. A flexible quantity option up to 25% allows bidders to anticipate adjustments during contract execution. Bidders must align with the purchaser’s integrity requirements and ATC documentation. The tender emphasizes GST considerations and delivery timeline adaptability, signaling a broad, long-form supply contract across multiple security components or services. The absence of explicit product specifications suggests the contract may cover a range of protective equipment or related security infrastructure, with potential for phased delivery aligned to project milestones. The unique interplay of option quantities and GST treatment requires precise forecasting, risk assessment, and robust supply chain planning for successful submission.

Technical Specifications & Requirements

  • No explicit product specifications provided in the tender data; bidders should scrutinize the BoQ and ATC for implicit scope.
  • Option Clause: quantity may be increased/decreased by up to 25% of bid quantity at contract placement and during currency, with delivery time adjusted by formula: (increased quantity ÷ original quantity) × original period, minimum 30 days.
  • GST note: bidder to determine applicable GST; reimbursement governed by actuals or lower of quoted rate.
  • Integrity Pact: mandatory upload of signed agreement as per buyer policy.
  • ATC/document references: an additional ATC document is required.
  • BoQ context: 129 total items hints at multi-line security equipment or services.

Terms, Conditions & Eligibility

  • EMD not specified in data; bidders should verify in terms and ATC.
  • Delivery timeline: “delivery period” flexible via option clause; base delivery starts after order date.
  • GST compliance: bidder responsible for GST calculation; reimbursement limited to actuals or lower rate.
  • Integrity Pact compliance: upload signed pact with bid.
  • Quantity flexibility: up to 25% variation allowed during/after contract at contracted rates.
  • ATC requirements: mandatory inclusion of Buyer ATC documents with bid.
  • BOQ: 129 items; exact itemization not disclosed in available data.

Key Specifications

  • BoQ contains 129 items indicating a broad security equipment scope

  • Option clause permits ±25% quantity adjustment at contract and during currency

  • Delivery period calculations depend on original vs. increased quantity with minimum 30 days

  • GST payable by bidder; reimbursement as actual or lower quoted rate

  • Integrity Pact submission is mandatory

  • ATC document required; exact product standards not listed in provided data

Terms & Conditions

  • Option Clause: +/-25% quantity variation with contractual rates

  • GST: bidder bears tax; reimbursement mechanism defined by terms

  • Integrity Pact: signed copy must be uploaded with bid

  • ATC: compliance with buyer-specific terms and additional file

  • BoQ: 129 items; item-level specifics not disclosed here

Important Clauses

Payment Terms

GST handling by bidder; reimbursement as actuals or lower rate as per terms

Delivery Schedule

Delivery period linked to order date; extended time proportionate to quantity changes, minimum 30 days

Penalties/Liquidated Damages

Not explicitly stated in data; rely on standard GeM/T&C or ATC references

Bidder Eligibility

  • Must submit signed Integrity Pact

  • Must comply with GST provisions applicable to bidder

  • Experience in security equipment procurement preferred

Authority & Contact

Department

NA

Office Name

Petroleum House

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

1602

Category

CLUTCH PLATE FOR LEYLAND SPLY INSTLN

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

36

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

730

Delivery Locations

1

Delivery Cities

24 Paraganas North

Delivery Pincodes

700052

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
SUBRATA BAG700052,Hindustan Petroleum Corporation Ltd, Kolkata (Dum Dum) ASF, NSCBI Airport, Near Cargo Gate No. 5, Kolkata- 70005224 Paraganas NorthWest Bengal7000524730-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASHINDUSTAN PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9749628.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 129 Items Sign in for GEM prices

#1

CLUTCH PLATE FOR LEYLAND SPLY INSTLN

CLUTCH PLATE FOR LEYLAND SPLY INSTLN

4 eac Delivery: 730 days
#2

CLUTCH PLATE FOR TATA SPLY INSTLN

CLUTCH PLATE FOR TATA SPLY INSTLN

6 eac Delivery: 730 days
#3

CLUTCH PLATE FOR EICHER SPLY INSTLN

CLUTCH PLATE FOR EICHER SPLY INSTLN

6 eac Delivery: 730 days
#4

PRESSURE PLATE FOR LEYLAND SPLY INSTLN

PRESSURE PLATE FOR LEYLAND SPLY INSTLN

2 eac Delivery: 730 days
#5

PRESSURE PLATE FOR TATA SPLY INSTLN

PRESSURE PLATE FOR TATA SPLY INSTLN

4 eac Delivery: 730 days
#6

PRESSURE PLATE FOR EICHER SPLY INSTLN

PRESSURE PLATE FOR EICHER SPLY INSTLN

4 eac Delivery: 730 days
#7

FLY WHEEL EICHER SPLY INSTLN

FLY WHEEL EICHER SPLY INSTLN

2 eac Delivery: 730 days
#8

FLY WHEEL TATA SPLY INSTLN

FLY WHEEL TATA SPLY INSTLN

2 eac Delivery: 730 days
#9

FLY WHEEL FACING LEYALND SPLY INSTLN

FLY WHEEL FACING LEYALND SPLY INSTLN

1 eac Delivery: 730 days
#10

CLUTCH RELEASE BEARINGLEYLAND

CLUTCH RELEASE BEARINGLEYLAND

3 eac Delivery: 730 days
#11

CLUTCH RELEASE BEARINGTATA

CLUTCH RELEASE BEARINGTATA

6 eac Delivery: 730 days
#12

CLUTCH RELEASE BEARINGEICHER

CLUTCH RELEASE BEARINGEICHER

6 eac Delivery: 730 days
#13

FUEL FILTER LEYLAND

FUEL FILTER LEYLAND

2 eac Delivery: 730 days
#14

FUEL FILTER TATA

FUEL FILTER TATA

20 eac Delivery: 730 days
#15

FUEL FILTER EICHER

FUEL FILTER EICHER

15 eac Delivery: 730 days
#16

MAIN FUEL FILTER TATAEICHER

MAIN FUEL FILTER TATAEICHER

20 eac Delivery: 730 days
#17

MAIN FUEL FILTER LEYLAND

MAIN FUEL FILTER LEYLAND

12 eac Delivery: 730 days
#18

OIL FILTER LEYLAND

OIL FILTER LEYLAND

3 eac Delivery: 730 days
#19

OIL FILTER EICHER

OIL FILTER EICHER

12 eac Delivery: 730 days
#20

OIL FILTER TATA

OIL FILTER TATA

16 eac Delivery: 730 days
#21

AIR FILTER LEYLAND

AIR FILTER LEYLAND

2 eac Delivery: 730 days
#22

AIR FILTER TATA

AIR FILTER TATA

8 eac Delivery: 730 days
#23

AIR FILTER EICHER

AIR FILTER EICHER

6 eac Delivery: 730 days
#24

FUEL FILTER CUM WATER SEPARATOR EICHER

FUEL FILTER CUM WATER SEPARATOR EICHER

6 eac Delivery: 730 days
#25

FUEL FILTER CUM WATER SEPARATOR TATA

FUEL FILTER CUM WATER SEPARATOR TATA

8 eac Delivery: 730 days
#26

PTO PUMP HOUSING SPLY INSTLN TATA

PTO PUMP HOUSING SPLY INSTLN TATA

2 eac Delivery: 730 days
#27

PTO PUMP HOUSING SPLY INSTLN EICHER

PTO PUMP HOUSING SPLY INSTLN EICHER

3 eac Delivery: 730 days
#28

PTO SEAL SPLY INSTLN EICHERTATALEYLAND

PTO SEAL SPLY INSTLN EICHERTATALEYLAND

20 eac Delivery: 730 days
#29

PTO BEARING SPLY INSTLN

PTO BEARING SPLY INSTLN

30 eac Delivery: 730 days
#30

ROLLER BEARING EICHER

ROLLER BEARING EICHER

10 eac Delivery: 730 days
#31

PTO SHAFT EICHER

PTO SHAFT EICHER

4 eac Delivery: 730 days
#32

PTO PINION

PTO PINION

4 eac Delivery: 730 days
#33

TATAEICHERLEYLAND AIR CMPRSR KIT SPLY

TATAEICHERLEYLAND AIR CMPRSR KIT SPLY

4 eac Delivery: 730 days
#34

THROTTLE LIMIT SWITCH SPLY INSTLN

THROTTLE LIMIT SWITCH SPLY INSTLN

200 eac Delivery: 730 days
#35

REVOLVING LIGHT FOR REFUELLER SPLY FIXN

REVOLVING LIGHT FOR REFUELLER SPLY FIXN

4 eac Delivery: 730 days
#36

REVOLVING LIGHT FOR JEEP SPLY FIXN

REVOLVING LIGHT FOR JEEP SPLY FIXN

2 eac Delivery: 730 days
#37

AUTO BULB PACKET FOR REFUELER SPLY FIXN

AUTO BULB PACKET FOR REFUELER SPLY FIXN

10 eac Delivery: 730 days
#38

CABIN ROOF HOOD LIGHT TATALEYLAND REF

CABIN ROOF HOOD LIGHT TATALEYLAND REF

25 eac Delivery: 730 days
#39

CABIN ROOF HOOD LIGHT EICHER REFUELER

CABIN ROOF HOOD LIGHT EICHER REFUELER

15 eac Delivery: 730 days
#40

CTRL PANEL LED INDICATOR SPLY FIXN

CTRL PANEL LED INDICATOR SPLY FIXN

5 eac Delivery: 730 days
#41

PISTON FOR REFUELERLEYLAND SPLY INSTLN

PISTON FOR REFUELERLEYLAND SPLY INSTLN

1 set Delivery: 730 days
#42

PISTON FOR REFUELER EICHERTATA SPLY IN

PISTON FOR REFUELER EICHERTATA SPLY IN

3 set Delivery: 730 days
#43

PISTON RING SPLY LEYLAND INSTLN

PISTON RING SPLY LEYLAND INSTLN

1 set Delivery: 730 days
#44

PISTON RING EICHERTATA SPLY INSTLN

PISTON RING EICHERTATA SPLY INSTLN

3 set Delivery: 730 days
#45

ENGINE HEAD CYLINDER SPLY INSTLN

ENGINE HEAD CYLINDER SPLY INSTLN

3 eac Delivery: 730 days
#46

HEAD GASKET SET LEYLAND SPLY INSTLN

HEAD GASKET SET LEYLAND SPLY INSTLN

1 eac Delivery: 730 days
#47

HEAD GASKET SET TATAEICHER SPLY INSTLN

HEAD GASKET SET TATAEICHER SPLY INSTLN

3 eac Delivery: 730 days
#48

VALVE GUIDE FOR ENGINETATAEICHER SPLY

VALVE GUIDE FOR ENGINETATAEICHER SPLY

3 set Delivery: 730 days
#49

VALVE GUIDE FOR ENGINELEYLAND SPLY FIXN

VALVE GUIDE FOR ENGINELEYLAND SPLY FIXN

1 set Delivery: 730 days
#50

GEAR SELECTOR CABLE SPLY INSTLN EICHER

GEAR SELECTOR CABLE SPLY INSTLN EICHER

5 eac Delivery: 730 days
#51

GEAR LEVER END SPLY INSTLN

GEAR LEVER END SPLY INSTLN

10 eac Delivery: 730 days
#52

RADIATOR HOSE PIPE FOR BOWSER SPLY INSTL

RADIATOR HOSE PIPE FOR BOWSER SPLY INSTL

20 eac Delivery: 730 days
#53

CLUTCH BOOSTER SPLY AND FIXN

CLUTCH BOOSTER SPLY AND FIXN

10 eac Delivery: 730 days
#54

CLUTCH SLAVE CYLINDER SPLY FIXN

CLUTCH SLAVE CYLINDER SPLY FIXN

10 eac Delivery: 730 days
#55

CLUTCH MASTER CYLINDER SPLY FIXN

CLUTCH MASTER CYLINDER SPLY FIXN

10 eac Delivery: 730 days
#56

ENGINE HEAD REPAIRING

ENGINE HEAD REPAIRING

6 eac Delivery: 730 days
#57

HEAD VALVEENGINE TATAEICHER SPLY FIXN

HEAD VALVEENGINE TATAEICHER SPLY FIXN

3 set Delivery: 730 days
#58

HEAD VALVEENGINE LEYLAND SPLY FIXN

HEAD VALVEENGINE LEYLAND SPLY FIXN

1 set Delivery: 730 days
#59

GUIDE FOR ENGINETATAEICHER SPLY FIXN

GUIDE FOR ENGINETATAEICHER SPLY FIXN

3 set Delivery: 730 days
#60

GUIDE FOR ENGINELEYLAND SPLY FIXN

GUIDE FOR ENGINELEYLAND SPLY FIXN

1 set Delivery: 730 days
#61

CONNECTING ROD SPLY FIXN EICHERLEYLAND

CONNECTING ROD SPLY FIXN EICHERLEYLAND

4 set Delivery: 730 days
#62

OIL PUMP SPLY AND FIXNTATAEICHERLEYLA

OIL PUMP SPLY AND FIXNTATAEICHERLEYLA

4 eac Delivery: 730 days
#63

ANABOND FOR GASKET MAKER SPLY FIXN

ANABOND FOR GASKET MAKER SPLY FIXN

100 eac Delivery: 730 days
#64

OIL SEAL ENGINE PORT TATAEICHERLEYLAND

OIL SEAL ENGINE PORT TATAEICHERLEYLAND

10 eac Delivery: 730 days
#65

FANBELT

FANBELT

10 eac Delivery: 730 days
#66

CLUTCH COVER ASSY SET

CLUTCH COVER ASSY SET

4 eac Delivery: 730 days
#67

HYDRAULIC HOSE PIPE

HYDRAULIC HOSE PIPE

5 eac Delivery: 730 days
#68

MAIN POPULAR SHAFT HEAVY VEHICLE EICHER

MAIN POPULAR SHAFT HEAVY VEHICLE EICHER

3 eac Delivery: 730 days
#69

UNIVERSAL JOINT FOR PTO PUMP

UNIVERSAL JOINT FOR PTO PUMP

100 eac Delivery: 730 days
#70

UNIVERSAL JOINT FOR HEAVY VEHICLE

UNIVERSAL JOINT FOR HEAVY VEHICLE

2 eac Delivery: 730 days
#71

ENGINE WATER PUMP ASSY

ENGINE WATER PUMP ASSY

8 eac Delivery: 730 days
#72

PULLEY FOR ENGINE

PULLEY FOR ENGINE

2 eac Delivery: 730 days
#73

WIPER BLADE SET ALL VEHICLE

WIPER BLADE SET ALL VEHICLE

30 eac Delivery: 730 days
#74

BRAKE ACTUATOR

BRAKE ACTUATOR

4 eac Delivery: 730 days
#75

BRAKE DIAPHRAGM

BRAKE DIAPHRAGM

10 eac Delivery: 730 days
#76

BRAKE RATCHET

BRAKE RATCHET

6 eac Delivery: 730 days
#77

DASHBOAD SWITCH

DASHBOAD SWITCH

5 eac Delivery: 730 days
#78

BRAKE CONTROLING VALVE

BRAKE CONTROLING VALVE

3 eac Delivery: 730 days
#79

BRAKE RELEASE VALVE

BRAKE RELEASE VALVE

4 eac Delivery: 730 days
#80

DDU ASSY VALVE

DDU ASSY VALVE

2 eac Delivery: 730 days
#81

DDU FULL KIT SET

DDU FULL KIT SET

3 eac Delivery: 730 days
#82

MAIN BUSH FOR REFUELER

MAIN BUSH FOR REFUELER

5 eac Delivery: 730 days
#83

CONNECTING BUSH

CONNECTING BUSH

5 eac Delivery: 730 days
#84

SEAT FOR ENGINE HEAD

SEAT FOR ENGINE HEAD

4 set Delivery: 730 days
#85

LINER FOR REFUELER ENGINE EICHERTATA

LINER FOR REFUELER ENGINE EICHERTATA

3 eac Delivery: 730 days
#86

LINER FOR REFUELER ENGINE LEYLAND

LINER FOR REFUELER ENGINE LEYLAND

1 eac Delivery: 730 days
#87

MINI BLADE FUSE FOR REFUELER

MINI BLADE FUSE FOR REFUELER

25 eac Delivery: 730 days
#88

CLUTCH SPRING KIT SET

CLUTCH SPRING KIT SET

3 eac Delivery: 730 days
#89

MAIN SHAFT BEARING

MAIN SHAFT BEARING

5 eac Delivery: 730 days
#90

PINION BEARING

PINION BEARING

5 eac Delivery: 730 days
#91

REAR HUB BEARING OUTER

REAR HUB BEARING OUTER

10 eac Delivery: 730 days
#92

REAR HUB BEARING INNER

REAR HUB BEARING INNER

10 eac Delivery: 730 days
#93

FRONT HUB BEARING OUTER

FRONT HUB BEARING OUTER

6 eac Delivery: 730 days
#94

FRONT HUB BEARING INNER

FRONT HUB BEARING INNER

6 eac Delivery: 730 days
#95

REAR HUB PACKING

REAR HUB PACKING

10 eac Delivery: 730 days
#96

FRONT HUB PACKING

FRONT HUB PACKING

10 eac Delivery: 730 days
#97

REAR HUB OIL SEAL

REAR HUB OIL SEAL

20 eac Delivery: 730 days
#98

FRONT HUB OIL SEAL

FRONT HUB OIL SEAL

10 eac Delivery: 730 days
#99

Gear Lever Cross

Gear Lever Cross

3 eac Delivery: 730 days
#100

Tie Rod Full Kit

Tie Rod Full Kit

3 eac Delivery: 730 days
#101

Coolant Tank EICHER

Coolant Tank EICHER

3 eac Delivery: 730 days
#102

Coolant Tank TATA

Coolant Tank TATA

2 eac Delivery: 730 days
#103

DIESEL TANK CAP TATA

DIESEL TANK CAP TATA

5 eac Delivery: 730 days
#104

Alternetor New for refueler engine

Alternetor New for refueler engine

3 eac Delivery: 730 days
#105

Self Charger New

Self Charger New

4 eac Delivery: 730 days
#106

Dynamo for Engine

Dynamo for Engine

5 eac Delivery: 730 days
#107

Self Cut Out for starter

Self Cut Out for starter

10 eac Delivery: 730 days
#108

Battery On off switch

Battery On off switch

9 eac Delivery: 730 days
#109

Head Light LEYLANDTATA

Head Light LEYLANDTATA

4 eac Delivery: 730 days
#110

Head Light EICHER

Head Light EICHER

4 eac Delivery: 730 days
#111

Indicator Light rear

Indicator Light rear

20 eac Delivery: 730 days
#112

Musical Flasher 24 V

Musical Flasher 24 V

50 eac Delivery: 730 days
#113

Mini Blade Fuse for car

Mini Blade Fuse for car

60 eac Delivery: 730 days
#114

PTO Cross Holder

PTO Cross Holder

20 eac Delivery: 730 days
#115

PTO Cross bearing

PTO Cross bearing

100 eac Delivery: 730 days
#116

PTO york teeth

PTO york teeth

20 eac Delivery: 730 days
#117

Self Armature

Self Armature

6 eac Delivery: 730 days
#118

Carbon Holder

Carbon Holder

10 eac Delivery: 730 days
#119

DEF filter Set TATAEICHERLEYLAND

DEF filter Set TATAEICHERLEYLAND

40 eac Delivery: 730 days
#120

Battery Clamp

Battery Clamp

30 eac Delivery: 730 days
#121

Single Pair Push Switch EICHERTATALEYL

Single Pair Push Switch EICHERTATALEYL

15 eac Delivery: 730 days
#122

Brake light switch TATAEICHER

Brake light switch TATAEICHER

20 eac Delivery: 730 days
#123

Air Tank TATAEICHERLEYLAND

Air Tank TATAEICHERLEYLAND

4 eac Delivery: 730 days
#124

Centre Rubber

Centre Rubber

5 eac Delivery: 730 days
#125

FOG light

FOG light

10 eac Delivery: 730 days
#126

WATERPRROF IP65 24 V 2.4 W LED MODULE

WATERPRROF IP65 24 V 2.4 W LED MODULE

30 eac Delivery: 730 days
#127

FUEL LEVEL SENSOR TATAEICHERLEYLAND

FUEL LEVEL SENSOR TATAEICHERLEYLAND

10 eac Delivery: 730 days
#128

CHECKING ENGINE PERFORMANCE TATA

CHECKING ENGINE PERFORMANCE TATA

16 eac Delivery: 730 days
#129

CHECKING ENGINE PERFORMANCE EICHER

CHECKING ENGINE PERFORMANCE EICHER

12 eac Delivery: 730 days

Categories 88

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates (relevant to security equipment procurement)

4

Financial statements (last 2-3 years)

5

EMD/Security deposit documentation (as applicable per final ATC)

6

Technical bid documents (compliance sheets, deviations if any)

7

OEM authorizations or authorized distributor letters (if product-specific)

8

Signed Integrity Pact (as per Buyer policy)

9

Copy of signed ATC document referenced by buyer

Frequently Asked Questions

Key insights about WEST BENGAL tender market

How to bid in HPCL security equipment tender 2026 GeM

Bidders should prepare GST registration, PAN, financial statements, experience certificates, and an Integrity Pact. Ensure a signed ATC and OEM authorizations if required. Submit technical bid with compliance checklists and verify BoQ item coverage. Delivery timelines hinges on the option clause and contract terms.

What documents are required for HPCL GeM procurement 2026

Submit GST certificate, PAN, last 2-3 years financials, experience certificates in security equipment, EMD documents if applicable, signed Integrity Pact, technical bid documents, and OEM authorizations. Ensure ATC file is included as per buyer policy for HPCL tender.

What are the delivery terms for HPCL 2026 security tender

Delivery starts from order date with an option to extend as per quantity changes up to 25%. Extended delivery time is calculated by (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.

How is GST handled in HPCL GeM tender 2026

Bidder pays GST; reimbursement will be the lower of the actual applicable rate or the bidder’s quoted GST percent, capped by tender terms. Ensure GST compliance in all invoices and bids.

What is the significance of 129 BoQ items in HPCL tender

129 items indicate a broad scope of security equipment/services; item-level specifics aren’t disclosed here. Bidders should review the BoQ and ATC for exact coverage, due dates, and installation/service requirements.

What is required to satisfy Integrity Pact for this HPCL tender

Upload a scanned signed Integrity Pact accompanying the bid as per buyer policy. Ensure all sections are completed, with authorized signatories and seal, to comply with HPCL GeM procurement standards.