Bid Publish Date
13-Aug-2026, 6:19 pm
Bid End Date
26-Aug-2026, 7:00 pm
EMD
₹60,000
Location
Progress
RABorder Roads Organisation invites bids for Rotational Moulded Polyethylene Water Storage Tanks (V3) conforming to IS 12701 for deployment in Darjeeling, West Bengal. The tender requires an EMD of ₹60,000, and the scope involves multiple tank units across 10 items listed in the BOQ (though item specifics are not provided). Bidders must demonstrate prior supply to central/state govt or PSU bodies for at least 3 years, with OEM/manufacturer authorization where applicable. A data sheet upload is mandatory to verify parameter alignment with product specifications. An option clause allows quantity adjustments up to 50%, with delivery adjustments calculated on a pro-rata basis. The tender emphasizes data-sheet matching to avoid mismatches that could lead to rejection.
EMD of ₹60,000 payable at bid submission
3 years govt/PSU supply experience required
OEM authorization must accompany distributor bids
Mandatory Data Sheet upload; parameter matching critical
Option clause allows 50% quantity variation
Data/disclosure declarations must be on bidder letterhead
Payment terms to be as per contract; no fixed terms stated here; ensure alignment with govt norms in final agreement.
Delivery period linked to original delivery date; extension via option clause subject to 30+ days minimum logic; extended delivery time proportional to quantity variation.
Penalties/LD, if any, to be specified in contract; bidder to consider potential delays given option-based delivery adjustments.
Not under liquidation, court receivership, or bankruptcy
Regular manufacturer/supplier of similar govt category products for 3 years
OEM authorization required if bidding via authorized distributors
Start
02-Sep-2026, 4:00 pm
End
03-Sep-2026, 4:00 pm
Duration: 24 hours
Reverse Auction Document
⏳ RA scheduled. Ensure you are registered to participate.
Quantity
1815
Category
Title1
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
80 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701 (Q3) , Title1 , Title2 , Title3 , Title4 , Title5 , Title6 , Title7 , Title8 , Title9 , Title10
Advisory Bank
State Bank of India
ePBG Percentage
4%
ePBG Duration (Months)
3
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Darjeeling
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Darjeeling | Darjeeling | - | - | 3 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Title1
PPGI Sheet 8 Feet x 3 Feet x 0.63 mm (Green Colour)
Title2
Instant Patchmate (Pot hole patch rep kit)
Title3
Electric Water dispenser (Hot & Cold) (20 Ltr)
Title4
LED ceiling lights 6/7 Watt Round 4 inch / 6 inch
Title5
Rexine Black (Water Proof)
Title6
Barbed wire for fencing
Title7
Standard sand
Title8
Cube Mould
Title9
Benzene
Title10
PVC Wall panel 10 feet x 1 feet with accessories
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Title1 | PPGI Sheet 8 Feet x 3 Feet x 0.63 mm (Green Colour) | 130 | nos | consignee764brtf | 30 | |
| 2 | Title2 | Instant Patchmate (Pot hole patch rep kit) | 8 | mt | consignee764brtf | 30 | |
| 3 | Title3 | Electric Water dispenser (Hot & Cold) (20 Ltr) | 8 | nos | consignee764brtf | 30 | |
| 4 | Title4 | LED ceiling lights 6/7 Watt Round 4 inch / 6 inch | 89 | nos | consignee764brtf | 30 | |
| 5 | Title5 | Rexine Black (Water Proof) | 120 | mtr | consignee764brtf | 30 | |
| 6 | Title6 | Barbed wire for fencing | 304 | kg | consignee764brtf | 30 | |
| 7 | Title7 | Standard sand | 100 | kg | consignee764brtf | 30 | |
| 8 | Title8 | Cube Mould | 10 | nos | consignee764brtf | 30 | |
| 9 | Title9 | Benzene | 43 | kg | consignee764brtf | 30 | |
| 10 | Title10 | PVC Wall panel 10 feet x 1 feet with accessories | 1,000 | sqft | consignee764brtf | 30 |
GST registration certificate
PAN card
Experience certificates (3 years govt/PSU supply proof)
Financial statements (last 3 years)
EMD deposit proof (₹60,000)
Data Sheet of the offered Rotational Moulded Polyethylene Water Storage Tanks
Manufacturer Authorization/OEM authorization (if bidding through distributor)
Non-disclosure declaration on bidder letterhead
Any relevant contracts showing yearly quantities supplied
Key insights about WEST BENGAL tender market
To bid, submit the Data Sheet aligning with IS 12701 specs, provide OEM authorization if using distributors, and attach ₹60,000 EMD. Ensure 3-year govt/PSU supply history with contract copies; non-disclosure on bidder letterhead; comply with 50% option clause for quantity variation.
Required documents include GST and PAN cards, three years of govt/PSU supply certificates, last three years financial statements, EMD proof of ₹60,000, data sheet for tanks, OEM authorization if applicable, and the non-disclosure declaration on bidder letterhead.
Key specs: Rotational Moulded Polyethylene Water Storage Tanks (V3) conforming to IS 12701; data sheet must reflect these parameters; delivery terms linked to original order date with option-based quantity adjustments up to 50%.
EMD is ₹60,000. Submit proof of payment with bid, via online transfer or as specified in the tender, ensuring the same bidder name appears on the EMD document and bid documents for verification.
The bidder must meet the minimum average annual turnover criterion for the last three financial years ending 31st March; exact value will be specified in tender documents and should be supported by audited statements.
If the purchaser exercises the option, order quantity may rise by up to 50% and delivery time will be recalculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Submit Manufacturer/Original Equipment Manufacturer authorization with the distributor’s name, designation, email, phone, and address; ensure the OEM is clearly identifiable within the bid package.
IS 12701 compliance must be demonstrated via the Data Sheet and supporting certifications; the data sheet should directly reflect the standard and tank specifications and be verifiable by the buyer.