Progress
Organization: Indian Army, Department Of Military Affairs, sourcing a range of IT and electrical equipment including UPS 1 KVA, Media Converter, Cat 6 UTP Cable, 4 Port USB Connector, RJ45 Connector, Printers (I-Card printing and Laser/Inkjet), All-in-One PC i7, Splitter and related cable assemblies. Location: WEST DELHI, DELHI - 110008. No explicit itemized quantities or estimated value provided; 11 BOQ items listed with N/A quantities. Terms grant a 25% quantity variation at contract placement and during currency, at contracted rates. The delivery window, base delivery period, and original delivery period are defined by the option clause, with minimum 30 days for extended delivery. This tender includes a buyer ATC document and a comprehensive option clause guiding scope expansion. Unique aspect: broad IT/electronics mix within a single procurement notice, with quantity flex and extended delivery rules.
Product/service names: UPS 1 KVA, Media Converter, Cat 6 UTP Cable, 4 Port USB Connector, RJ 45 Connector, I-Card Printer, All-in-One PC i7, Inkjet Printer, LaserJet Printer, Splitter, 2.5mm 3 Core Cable
Quantities: 11 BOQ items with N/A quantities
Estimated value: Not specified
Delivery/installation: implied; subject to option clause and extended delivery rules
Standards/certifications: Not specified in tender data; ATC document to define requirements
Experience: Not explicitly stated; ATC may specify technical capability
Warranty/Support: Not specified; ATC should clarify warranty terms
Option Clause allows quantity variation up to 25% at contract and during currency
Delivery period extended proportional to quantity change, min 30 days
ATC document governs specifics on eligibility, documentation, and compliance
Payment terms to be defined in ATC; bidders should expect standard government payment schedules after delivery/completion
Delivery period linked to original delivery order; extended delivery time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
Not specified in available data; refer to ATC for LD rates and warranty penalties
Experience in supplying IT/electrical equipment to government bodies
GST registration and PAN verification
OEM authorization for branded items where required
Quantity
80
Category
UPS 1 KVA
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
80 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
UPS 1 KVA , Media Converter with Installation , Cat 6 UTP Cable , 4 Port USB Connector , RJ 45 Connector , Printer for I- Card Printing , All in one PC i7 , Ink Jet Printer , Splitter , Cable 2.5mm 3 Core , Laser Jet Printer
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
SOUTH WEST DELHI
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | SOUTH WEST DELHI | SOUTH WEST DELHI | - | - | 40 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
UPS 1 KVA
UPS 1 KVA
Media Converter with Installation
Media Converter with Installation
Cat 6 UTP Cable
Cat 6 UTP Cable
4 Port USB Connector
4 Port USB Connector
RJ 45 Connector
RJ 45 Connector
Printer for I- Card Printing
Printer for I- Card Printing
All in one PC i7
All in one PC i7
Ink Jet Printer
Ink Jet Printer
Splitter
Splitter
Cable 2.5mm 3 Core
Cable 2.5mm 3 Core
Laser Jet Printer
Laser Jet Printer
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | UPS 1 KVA | UPS 1 KVA | 40 | nos | [email protected] | 15 | |
| 2 | Media Converter with Installation | Media Converter with Installation | 4 | nos | [email protected] | 15 | |
| 3 | Cat 6 UTP Cable | Cat 6 UTP Cable | 2 | bdl | [email protected] | 15 | |
| 4 | 4 Port USB Connector | 4 Port USB Connector | 2 | nos | [email protected] | 15 | |
| 5 | RJ 45 Connector | RJ 45 Connector | 1 | pkt | [email protected] | 15 | |
| 6 | Printer for I- Card Printing | Printer for I- Card Printing | 1 | nos | [email protected] | 15 | |
| 7 | All in one PC i7 | All in one PC i7 | 2 | nos | [email protected] | 15 | |
| 8 | Ink Jet Printer | Ink Jet Printer | 1 | nos | [email protected] | 15 | |
| 9 | Splitter | Splitter | 1 | nos | [email protected] | 15 | |
| 10 | Cable 2.5mm 3 Core | Cable 2.5mm 3 Core | 25 | mtr | [email protected] | 15 | |
| 11 | Laser Jet Printer | Laser Jet Printer | 1 | nos | [email protected] | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates (similar IT/electrical equipment deployments)
Financial statements (audited annual accounts)
EMD/Security deposit proof
Technical bid submission documents
OEM authorizations (where applicable)
Any ATC-specified certifications or compliance certificates
Key insights about DELHI tender market
Bidders must submit GST, PAN, experience certificates, financial statements, EMD, technical bid, and OEM authorizations as per the ATC. Ensure compliance with the 25% quantity variation clause and understand the delivery extension formula ((Increased quantity ÷ Original quantity) × Original delivery period) with a minimum of 30 days.
Submit GST certificate, PAN, experience certificates for similar deployments, audited financial statements, EMD proof, technical bid documents, and OEM authorizations. Ensure ATC-specified certifications are included and that all documents reflect current regulatory status for a defense-related tender.
Delivery terms tie to the original delivery period, with option-based extensions. If quantity increases, extended delivery time equals (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Ensure readiness for phased delivery as per ATC guidance.
Formal standard requirements are defined in the ATC document. Bidders should anticipate IS/ISO compliance or equivalent, along with OEM authorizations for branded items. Confirm specific standards during bid submission and ensure supplier quality documentation aligns with ATC.
EMD amount is not disclosed in the provided data; bidders must review the ATC document to determine exact EMD value, acceptable payment method, and submission timeline for security deposit.
Verify eligibility via ATC: ensure organizational registrations (GST, PAN), prior experience in government IT/equipment procurement, and required OEM authorizations. Confirm that you can meet delivery flexibility and installation scope if stated in ATC.