1) RETURN IDLER OF SIZE 159mm DIA X 1000mm LONG FOR 1800mm CONVEYOR,2) RETURN IDLER 159 MM DIA X 17
Nlc India Limited
CUDDALORE, TAMIL NADU
Bid Publish Date
29-Jun-2026, 11:31 am
Bid End Date
13-Jul-2026, 12:00 pm
Location
Progress
Quantity
35
Category
RETURN IDLER PULLEY FOR TWIN BOOM STACKER 1 TO 5
Bid Type
Two Packet Bid
Rashtriya Ispat Nigam Limited invites bids for critical conveyor components: flat carrying impact idler for 1600 mm belt width conveyors and return idler pulley for twin boom stacker 1 to 5. The estimated scope is undefined in the available data, but the procurement targets replacement or upgrade of primary conveyor components at the plant. The award will follow GCC and detailed invitation terms, with bidder undertakings on document authenticity and non-collusive bidding. The unique clause allows quantity variation up to 25% during order and contract execution. This tender emphasizes compliance with ATC and the organization’s standard contract framework, with delivery timing linked to order dates and extended-period calculations. Location and project context are based on RINL’s Visakhapatnam operations; bidders should align with regional procurement practices.
Product/service names: flat carrying impact idler for 1600 mm belt width conveyors; return idler pulley for twin boom stacker 1–5
Estimated value: Not specified in data
Quantity: Not specified; subject to 25% variation per option clause
Standards/certifications: Not specified in data; follow GCC and Annexures
Delivery/location: Based on RINL Visakhapatnam plant operations; delivery terms per GCC
Warranty/AMC: Not specified in data; refer to Detailed Terms and Conditions
Key Term 1: Quantity may vary up to 25% during contract and delivery extension periods
Key Term 2: Delivery period adjustments calculated as (Increased/Original) × Original delivery period with minimum 30 days
Key Term 3: Compliance with GCC, Detailed Terms and Annexures; no scope change requests
Not specified in data; must be aligned with GCC terms
Delivery period starts from the last date of original delivery order; extension logic as per option clause with minimum 30 days
Not specified in data; refer to GCC for LD/BD terms
Experience in supplying conveyor idlers or related components
GCC-compliant bidder with valid GST and PAN
Non-Collusive Tendering Certificate and authenticity undertakings required
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
FLAT CARRING IMPACT IDLER FOR 1600 MM BELT WIDTH CONVEYORS , RETURN IDLER PULLEY FOR TWIN BOOM STACKER 1 TO 5
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Nlc India Limited
CUDDALORE, TAMIL NADU
The Fertilisers And Chemicals Travancore Limited
ERNAKULAM, KERALA
Damodar Valley Corporation
Purulia, WEST BENGAL
The Fertilisers And Chemicals Travancore Limited
ERNAKULAM, KERALA
Indian Army
JODHPUR, RAJASTHAN
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for related conveyor components
Financial statements (latest/annual report)
Bidders must meet GCC requirements and Annexure-1 authenticity undertakings. Provide GST, PAN, experience certificates for conveyors, and financial statements. Ensure compliance with the 25% quantity variation clause and submit Non-Collusive Tendering Certificate (Annexure-2). Delivery terms follow last order date with minimum 30 days extension.
Submit GST registration, PAN, experience certificates for related supply of idlers or pulleys, financial statements, EMD as per GCC (if applicable), technical bid documentation, OEM authorizations if required, and the authenticity/Non-Collusive certificates (Annexure-1/2). Ensure sign-off on all pages.
Technical specs specify a flat carrying impact idler for 1600 mm belt width conveyors and a return idler pulley for twin boom stackers (units 1–5). Specific dimension tolerances, load ratings, and material details are governed by GCC and annexures; exact IS/ISO standards are not listed in the data.
Delivery schedule is linked to the last date of the original delivery order, with the option to increase quantity up to 25% and extended delivery time calculated as (Increased quantity ÷ Original quantity) × Original period, minimum 30 days. Extensions may apply within original delivery period per option clause.
EMD details are not specified in the provided data; bidders should refer to GCC for exact EMD amount or exemptions. Payment terms follow GCC guidelines; explicit percentages and milestones are defined in the Detailed Terms and Conditions and Annexures.
Eligibility requires GCC compliance, authenticity undertakings (Annexure-1), Non-Collusive Tendering Certificate (Annexure-2), GST and PAN validity, and demonstrated experience in supplying conveyor components or similar idlers/pulleys to large plants.
Penalties/LD terms are not specified in the provided data; vendors should consult the GCC. Typically, LDs relate to late delivery or non-conforming goods as per the Detailed Terms and Conditions or contract; verify exact percentages and caps in the finalized GCC.
The purchaser may vary quantity up to 25% at contract award and during currency. Additional delivery time is calculated using the formula provided, with a minimum of 30 days. Ensure pricing reflects potential quantity fluctuations within this 25% window.
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
📍 Hamirpur, UTTAR PRADESH
National Aluminium Company Limited, Bhubaneswar
📍 KORAPUT, ODISHA
📍 TELANGANA
Nmdc Limited
📍 DANTEWADA, CHHATTISGARH
Gujarat Mineral Development Corporation (gmdc)
📍 VADODARA, GUJARAT
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS