Split Air Conditioner (Ceiling Mount Type), as per IS: 1391 (part 2)
Aligarh Muslim University (amu)
ALIGARH, UTTAR PRADESH
Progress
Quantity
6
Bid Type
Two Packet Bid
Organization: Indian Air Force. Product: Split Air Conditioner (Ceiling Mount Type) compliant with IS 1391 (Part 2). Estimated value: ₹600,000; EMD: ₹18,000. Location: not specified; procurement under Department of Military Affairs. Scope: supply, installation, testing, commissioning, and operator training; statutory clearances if any. Delivery/option clause: 25% quantity increase/decrease permitted at contracted rates; delivery period linked to last date of original delivery order with minimum 30 days, extended as per option. Differentiator: IS 1391 Part 2 compliance, after-sales service expectations, and on-site installation requirements. Unique aspect: mandatory OEM service support and escalation matrix; dedicated service staff in India.
Key differentiators include the 2-year warranty, OEM service network, and post-installation training with maintenance SLAs. The tender emphasizes a comprehensive scope including training and statutory clearances, ensuring end-to-end readiness for air force installations.
This tender targets suppliers able to fulfill supply, installation, testing, commissioning, and training obligations while meeting IS standards and after-sales commitments in India.
EMD of ₹18,000 required; bid security to be furnished as per terms
Option clause allows ±25% quantity variation at contracted rates
Delivery period begins after original DO date; minimum 30 days extension
2-year OEM warranty; certificates to be submitted on delivery
Dedicated toll-free service support and escalation matrix required
Not specified in tender; bidders must align with standard IAF procurement payment practices and provide warranty certificates at delivery
Delivery period to commence from last date of original delivery order; additional time formula applies with minimum 30 days
Not specified; ensure compliance with OEM warranty and timely service; SLAs should govern service performance
Experience in supplying and installing split air conditioners targeting defense or government projects
Demonstrated after-sales service presence in INDIA with local service centers
Compliance with IS 1391 Part 2 and ability to provide OEM warranties
Aligarh Muslim University (amu)
ALIGARH, UTTAR PRADESH
Iocl- Wrpl
Central Warehousing Corporation (cwc)
JAIPUR, RAJASTHAN
Indian Institute Of Management (iim)
LUCKNOW, UTTAR PRADESH
P.c.c.f.,orissa,bhubaneswar
KHORDHA, ODISHA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
- GST registration certificate
- PAN card
- Experience certificates demonstrating similar air conditioning installations (if available)
- Financial statements or solvency documents
- EMD payment proof (₹18,000)
- Technical compliance certificates (IS 1391 Part 2) or equivalent
- OEM authorization / authorization letter from manufacturer
- Detailed installation, commissioning, and maintenance SLA documents
- Service center details near consignee locations
Extended Deadline
05-Dec-2025, 9:00 am
Opening Date
05-Dec-2025, 9:30 am
Extended Deadline
03-Dec-2025, 9:00 am
Opening Date
03-Dec-2025, 9:30 am
Extended Deadline
01-Dec-2025, 5:00 pm
Opening Date
01-Dec-2025, 5:30 pm
Extended Deadline
01-Dec-2025, 9:00 am
Opening Date
01-Dec-2025, 9:30 am
Key insights about KARNATAKA tender market
Bidders must submit GST, PAN, EMD ₹18,000 proof, and OEM authorization; ensure IS 1391 Part 2 compliance and provide 2-year OEM warranty. Include installation, testing, commissioning, operator training, and service SLAs; provide service center details across INDIA and escalation matrix for after-sales support.
Required documents include GST certificate, PAN, experience certificates, financial statements, EMD payment proof, IS 1391 Part 2 compliance certificates, OEM authorization, installation and maintenance SLAs, and service center details near consignee locations.
The contract allows a ±25% quantity variation at contracted rates; delivery period starts from the last date of the original delivery order with a minimum 30-day extension; additional time is calculated as (extra quantity/original quantity) × original period.
A 2-year warranty from final acceptance or completion of installation is required; OEM warranty certificates must be provided; bidders must have a dedicated service team and India-based service centers with a defined escalation matrix.
Suppliers must provide equipment compliant with IS 1391 (Part 2); ensure conformity certificates and installation/commissioning as per standard requirements; include training for operators and statutory clearances if applicable.
Bidder must furnish proof of EMD ₹18,000 as per tender terms; payment method (DD/online) should align with organization’s payment guidelines and be submitted with the bid documents.
Scope includes Supply, Installation, Testing, Commissioning, and Training of operators; delivery must include any statutory clearances required; post-installation service support and maintenance SLAs should be included.
Bidders must provide a list of service centers near consignee destinations and an escalation matrix; this ensures timely servicing and defect rectification during the warranty period across INDIA.
Industrial Training Department
📍 IDUKKI, KERALA
Indian Institute Of Technology (iit)
Indian Council Of Medical Research (icmr)
📍 KOLKATA, WEST BENGAL
Electronics Corporation Of India Limited
📍 HYDERABAD, TELANGANA
Access all tender documents at no cost
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS