Progress
Bharat Electronics Limited (BEL) invites bids for the Supply Installation Testing and Commissioning of laptops high end to be delivered to BEL, PANCHKULA, HARYANA 133301. The scope includes supply, installation, testing and commissioning with a GST-inclusive bid. The ATC allows the purchaser to adjust quantity up to 50% during and after contract, influencing both delivery schedules and total orders. Key commercial terms include payment terms of 90% within 45 days after receipt of accepted material and 10% after installation with a 5% PBG during warranty plus 2 months. Delivery terms are “FOR BEL PANCHKULA” with liquidated damages at 0.5% per week up to 10%, and options for repurchase or order cancellation if delays occur. This procurement emphasizes timely delivery, post-installation support, and compliance with BEL’s delivery economics.
Product/service names: Laptop High End (no model/brand given)
Quantity/Value: Not specified; scope includes Supply, Installation, Testing and Commissioning
EMD/Estimate: Not explicitly stated; PBG 5% of PO value during warranty
Standards/Certifications: Not specified in data
Delivery: FOR BEL PANCHKULA, warranty period terms imply post-installation support
Experience: Not explicitly stated; requires capability for SITC of laptops
Warranty/Support: PBG validity through warranty + 2 months; LD penalties apply
Option clause allows quantity variation up to 50% at contract and during currency
Delivery term FOR BEL PANCHKULA with LD at 0.5% per week up to 10%
Payment: 90% within 45 days after receipt; 10% after installation with 5% PBG
90% payment within 45 days after receipt of accepted material; 10% on successful installation with PBG of 5% valid through warranty + 2 months
Delivery must meet purchase order dates; option clause allows quantity changes up to 50% with extended delivery calculations
0.5% of delayed value per week up to 10%; BEL may repurchase or cancel order if delays occur
Ability to supply high-end laptops with SITC capability to BEL
Compliance with GST and PAN requirements and EFT mandate
Experience in laptop supply/installations and post-installation support
Quantity
4
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Warranty Period
02 months
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Laptop High End
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
38
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
49
Delivery Locations
1
Delivery Cities
PANCHKULA
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | PANCHKULA | PANCHKULA | - | - | 4 | 49 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
GST certificate and financial statements
Experience certificates related to laptop high-end supply/installation
Technical bid documents and OEM authorizations (if applicable)
PBG or performance security document
Key insights about HARYANA tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate with the bid. Include GST-inclusive price, meet the SITC scope (supply, installation, testing, commissioning), and comply with BEL's delivery, LD, and PBG terms. Ensure payment terms align with 90%/45 days and 10% post-installation.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, OEM authorizations if applicable, experience certificates for high-end laptops, financial statements, and technical bid documents demonstrating SITC capability and GST compliance.
Penalties include liquidated damages at 0.5% per week of the delayed value, capped at 10%; BEL may repurchase or cancel the PO if delays occur. Delivery is FOR BEL PANCHKULA, with option-based quantity changes up to 50%.
Payment is 90% within 45 days after receipt of accepted material; the remaining 10% after installation and commissioning with a 5% PBG valid through warranty plus 2 months.
No explicit standards are listed in the data; the tender requires GST-inclusive pricing and adherence to BEL delivery and performance terms, including PBG and LD provisions. Vendors should align with general defence procurement compliance.
Scope covers Supply, Installation, Testing and Commissioning of high-end laptops, with delivery terms FOR BEL PANCHKULA and post-installation support as implied by PBG and warranty requirements.