Progress
Hindustan Aeronautics Limited (HAL) invites bids for the procurement of security equipment under the Department Of Defence Production at Koraput, Odisha. The tender references a large BOQ of 87 items, with no explicit itemwise specifications published. The contract contemplates an option clause allowing a ±25% quantity fluctuation at contracted rates. Delivery timelines hinge on the last delivery order date, with a provision to extend as per the option, subject to a minimum lead time of 30 days. The buyer explicitly requires compliance with at least the option-based delivery mechanism and notes that some terms are contained in an uploaded ATC document. This procurement is positioned as a government defense production activity in a strategically located district of Odisha, signaling stringent compliance and IP controls. The key differentiator is the combination of a substantial quantity option and the need to align with Buyer Added ATC conditions. Unique aspects include the vendor-arranged material requirement and IP address restrictions for bids. This opportunity targets suppliers with capability in defense procurement and large-volume supply to HAL.
87-item BOQ with unspecified item details
Quantity fluctuation up to 25% during contract and currency of contract
Delivery period starts from last date of original delivery order
Extended time calculation: (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
Material to be arranged by vendor
IP address matching bids will be rejected (ATC requirement)
Quantity adjustment up to 25% during contract and currency
Delivery period linked to last delivery order date with minimum 30 days
Vendor-arranged material and IP address restrictions for bids
Details to be provided in ATC; payment terms not specified in data
Delivery begins after original delivery order; option-based extensions governed by percentage and minimum days
Not specified in provided data; ATC to contain LD/penalty terms
Experience in supplying security equipment to defense/public sector
Financial capacity demonstrated by latest financial statements
GST registration and valid PAN card
Capability to arrange vendor-sourced materials and comply with ATC IP-address restrictions
Quantity
289
Category
SE6017-0022-01
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
80 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
SE6017-0022-01 , SE6084-25276-02 , SE6014-5852 , SE6072-12188 , SE6012-1122 , SE6071-0206 , SE606932370 , SE6015-7747-II , SE607953586 , SE60494849 , SE6015-10432 , SE6084-25276-16 , SE6057- 0884 , SE607953588 , SE6017-0080 , SE6017-0082 , SE6015-10426 , SE6012-1120-01 , SE6057-0882 , SE6017- 0078 , SE6017-0080-04 , SE6084-26688-08 , SE6017-0080- 01 , SE6065-8758 , SE6017-0080-02 , SE6084-26688-04 , SE6084-26688-03 , SE6017-0080-03 , SE6084-26688-07 , SE6084-26688-06 , SE6017-0080-06 , SE6017-0080-05 , SE6084-26688-01 , SE6084-26688 , SE6017-0086-01 , SE6084-26688-10 , SE6017-0086 , SE6084-26688-09 , 8211-0060 6E , 8211-0069 6E , SE6084-26682 , SE6084- 26688-02 , SE6015-11380 , SE6084-26690 , SE6015-11372 , SE6084-26674 , SE6084-26668 , SE6015-11368 , SE6084- 26690-01 , SE6057-0894 , SE6017-0084 , SE6017-0086-02 , SE6084-26688-11 , SE6072-12186 , SE6017-0026-01 , SE6084-25276-06 , SE6084-19575 , SE6026-12894-01 , SE6015-10412 , SE6015-10410 , SE6012-1122-01 , SE6014- 5854 , SE6360-1262 , SE6331-6630-02 , SE6017-0026 , SE6084-25276-05 , SE6084-25276-04 , SE6084-25314 , SE6014-5584 , SE6084-25276-12 , SE6017-0034-02 , SE6017-0030-03 , SE607953032 , SE6012-0016 , SE6015- 10414 , SE607953578 , SE6304-17423 , SE6378-6427 , SE6015-10408 , SE6084-25276-01 , SE6084-20007 , SE6017-0034-01 , SE6084-25276-15 , SE6015-7787-01 , SE6017-0030-01 , SE6084-25276-10 , SE6015-10436
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
KORAPUT
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | KORAPUT | KORAPUT | - | - | 2 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
05-Sep-2026, 9:30 am
Opening Date
05-Sep-2026, 10:00 am
SE6017-0022-01
GAUGE
SE6084-25276-02
ETALON
SE6014-5852
GAUGE
SE6072-12188
DEVICE
SE6012-1122
VERNIER CALLIPER
SE6071-0206
DEVICE
SE606932370
SPLINE GAUGE
SE6015-7747-II
DEPTH GAUGE
SE607953586
GAUGE
SE60494849
THREAD RING GAUGE WITH PLUG GAUGE
SE6015-10432
HEIGHT GAUGE
SE6084-25276-16
ETALON
SE6057-0884
GAUGE SET
SE607953588
THICKNESS GAUGE
SE6017-0080
GAUGE
SE6017-0082
GAUGE
SE6015-10426
HEIGHT GAUGE
SE6012-1120-01
VERNIER CALIPER
SE6057-0882
GAUGE SET
SE6017-0078
GAUGE
SE6017-0080-04
GAUGE
SE6084-26688-08
STANDARD
SE6017-0080-01
GAUGE
SE6065-8758
GAUGE
SE6017-0080-02
GAUGE
SE6084-26688-04
STANDARD
SE6084-26688-03
STANDARD
SE6017-0080-03
GAUGE
SE6084-26688-07
STANDARD
SE6084-26688-06
STANDARD
SE6017-0080-06
GAUGE
SE6017-0080-05
GAUGE
SE6084-26688-01
STANDARD
SE6084-26688
STANDARD
SE6017-0086-01
GAUGE
SE6084-26688-10
STANDARD
SE6017-0086
GAUGE
SE6084-26688-09
STANDARD
8211-0060 6E
THREAD RING GAUGE WITH PLUG GAUGE
8211-0069 6E
THREAD RING GAUGE WITH PLUG GAUGE
SE6084-26682
STANDARD
SE6084-26688-02
STANDARD
SE6015-11380
GAUGE
SE6084-26690
STANDARD
SE6015-11372
HEIGHT GAUGE
SE6084-26674
ETALON
SE6084-26668
STANDARD
SE6015-11368
GAUGE
SE6084-26690-01
STANDARD
SE6057-0894
GAUGE
SE6017-0084
GAUGE
SE6017-0086-02
GAUGE
SE6084-26688-11
STANDARD
SE6072-12186
DEVICE
SE6017-0026-01
GAUGE
SE6084-25276-06
ETALON
SE6084-19575
ETALON
SE6026-12894-01
GAUGE
SE6015-10412
HEIGHT GAUGE
SE6015-10410
HEIGHT GAUGE
SE6012-1122-01
VERNIER CALLIPER
SE6014-5854
DEVICE
SE6360-1262
FIXTURE FOR CHECKING RUNOUT OF GEAR
SE6331-6630-02
MANDREL
SE6017-0026
GAUGE
SE6084-25276-05
ETALON
SE6084-25276-04
ETALON
SE6084-25314
ETALON
SE6014-5584
SNAP GAUGE
SE6084-25276-12
ETALON
SE6017-0034-02
GAUGE
SE6017-0030-03
GAUGE
SE607953032
GAUGE
SE6012-0016
VERNIER CALIPER
SE6015-10414
HEIGHT GAUGE
SE607953578
GAUGE
SE6304-17423
JIG
SE6378-6427
HOOK
SE6015-10408
HEIGHT GAUGE
SE6084-25276-01
ETALON
SE6084-20007
ETALON
SE6017-0034-01
GAUGE
SE6084-25276-15
ETALON
SE6015-7787-01
HEIGHT GAUGE
SE6017-0030-01
GAUGE
SE6084-25276-10
ETALON
SE6015-10436
HEIGHT GAUGE
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | SE6017-0022-01 | GAUGE | 2 | pieces | [email protected] | 180 | |
| 2 | SE6084-25276-02 | ETALON | 2 | pieces | [email protected] | 180 | |
| 3 | SE6014-5852 | GAUGE | 2 | pieces | [email protected] | 180 | |
| 4 | SE6072-12188 | DEVICE | 4 | pieces | [email protected] | 180 | |
| 5 | SE6012-1122 | VERNIER CALLIPER | 2 | pieces | [email protected] | 180 | |
| 6 | SE6071-0206 | DEVICE | 2 | pieces | [email protected] | 180 | |
| 7 | SE606932370 | SPLINE GAUGE | 4 | pieces | [email protected] | 180 | |
| 8 | SE6015-7747-II | DEPTH GAUGE | 4 | pieces | [email protected] | 180 | |
| 9 | SE607953586 | GAUGE | 2 | pieces | [email protected] | 180 | |
| 10 | SE60494849 | THREAD RING GAUGE WITH PLUG GAUGE | 4 | pieces | [email protected] | 180 | |
| 11 | SE6015-10432 | HEIGHT GAUGE | 4 | pieces | [email protected] | 180 | |
| 12 | SE6084-25276-16 | ETALON | 4 | pieces | [email protected] | 180 | |
| 13 | SE6057-0884 | GAUGE SET | 4 | pieces | [email protected] | 180 | |
| 14 | SE607953588 | THICKNESS GAUGE | 4 | pieces | [email protected] | 180 | |
| 15 | SE6017-0080 | GAUGE | 2 | pieces | [email protected] | 180 | |
| 16 | SE6017-0082 | GAUGE | 2 | pieces | [email protected] | 180 | |
| 17 | SE6015-10426 | HEIGHT GAUGE | 4 | pieces | [email protected] | 180 | |
| 18 | SE6012-1120-01 | VERNIER CALIPER | 2 | pieces | [email protected] | 180 | |
| 19 | SE6057-0882 | GAUGE SET | 5 | pieces | [email protected] | 180 | |
| 20 | SE6017-0078 | GAUGE | 4 | pieces | [email protected] | 180 | |
| 21 | SE6017-0080-04 | GAUGE | 2 | pieces | [email protected] | 180 | |
| 22 | SE6084-26688-08 | STANDARD | 4 | pieces | [email protected] | 180 | |
| 23 | SE6017-0080-01 | GAUGE | 2 | pieces | [email protected] | 180 | |
| 24 | SE6065-8758 | GAUGE | 4 | pieces | [email protected] | 180 | |
| 25 | SE6017-0080-02 | GAUGE | 2 | pieces | [email protected] | 180 | |
| 26 | SE6084-26688-04 | STANDARD | 4 | pieces | [email protected] | 180 | |
| 27 | SE6084-26688-03 | STANDARD | 2 | pieces | [email protected] | 180 | |
| 28 | SE6017-0080-03 | GAUGE | 2 | pieces | [email protected] | 180 | |
| 29 | SE6084-26688-07 | STANDARD | 4 | pieces | [email protected] | 180 | |
| 30 | SE6084-26688-06 | STANDARD | 2 | pieces | [email protected] | 180 | |
| 31 | SE6017-0080-06 | GAUGE | 2 | pieces | [email protected] | 180 | |
| 32 | SE6017-0080-05 | GAUGE | 2 | pieces | [email protected] | 180 | |
| 33 | SE6084-26688-01 | STANDARD | 2 | pieces | [email protected] | 180 | |
| 34 | SE6084-26688 | STANDARD | 4 | pieces | [email protected] | 180 | |
| 35 | SE6017-0086-01 | GAUGE | 2 | pieces | [email protected] | 180 | |
| 36 | SE6084-26688-10 | STANDARD | 2 | pieces | [email protected] | 180 | |
| 37 | SE6017-0086 | GAUGE | 2 | pieces | [email protected] | 180 | |
| 38 | SE6084-26688-09 | STANDARD | 2 | pieces | [email protected] | 180 | |
| 39 | 8211-0060 6E | THREAD RING GAUGE WITH PLUG GAUGE | 4 | pieces | [email protected] | 180 | |
| 40 | 8211-0069 6E | THREAD RING GAUGE WITH PLUG GAUGE | 4 | pieces | [email protected] | 180 | |
| 41 | SE6084-26682 | STANDARD | 4 | pieces | [email protected] | 180 | |
| 42 | SE6084-26688-02 | STANDARD | 4 | pieces | [email protected] | 180 | |
| 43 | SE6015-11380 | GAUGE | 4 | pieces | [email protected] | 180 | |
| 44 | SE6084-26690 | STANDARD | 4 | pieces | [email protected] | 180 | |
| 45 | SE6015-11372 | HEIGHT GAUGE | 4 | pieces | [email protected] | 180 | |
| 46 | SE6084-26674 | ETALON | 4 | pieces | [email protected] | 180 | |
| 47 | SE6084-26668 | STANDARD | 4 | pieces | [email protected] | 180 | |
| 48 | SE6015-11368 | GAUGE | 3 | pieces | [email protected] | 180 | |
| 49 | SE6084-26690-01 | STANDARD | 4 | pieces | [email protected] | 180 | |
| 50 | SE6057-0894 | GAUGE | 3 | pieces | [email protected] | 180 | |
| 51 | SE6017-0084 | GAUGE | 2 | pieces | [email protected] | 180 | |
| 52 | SE6017-0086-02 | GAUGE | 2 | pieces | [email protected] | 180 | |
| 53 | SE6084-26688-11 | STANDARD | 5 | pieces | [email protected] | 180 | |
| 54 | SE6072-12186 | DEVICE | 5 | pieces | [email protected] | 180 | |
| 55 | SE6017-0026-01 | GAUGE | 5 | pieces | [email protected] | 180 | |
| 56 | SE6084-25276-06 | ETALON | 5 | pieces | [email protected] | 180 | |
| 57 | SE6084-19575 | ETALON | 4 | pieces | [email protected] | 180 | |
| 58 | SE6026-12894-01 | GAUGE | 2 | pieces | [email protected] | 180 | |
| 59 | SE6015-10412 | HEIGHT GAUGE | 4 | pieces | [email protected] | 180 | |
| 60 | SE6015-10410 | HEIGHT GAUGE | 4 | pieces | [email protected] | 180 | |
| 61 | SE6012-1122-01 | VERNIER CALLIPER | 2 | pieces | [email protected] | 180 | |
| 62 | SE6014-5854 | DEVICE | 2 | pieces | [email protected] | 180 | |
| 63 | SE6360-1262 | FIXTURE FOR CHECKING RUNOUT OF GEAR | 1 | pieces | [email protected] | 180 | |
| 64 | SE6331-6630-02 | MANDREL | 4 | pieces | [email protected] | 180 | |
| 65 | SE6017-0026 | GAUGE | 4 | pieces | [email protected] | 180 | |
| 66 | SE6084-25276-05 | ETALON | 4 | pieces | [email protected] | 180 | |
| 67 | SE6084-25276-04 | ETALON | 4 | pieces | [email protected] | 180 | |
| 68 | SE6084-25314 | ETALON | 3 | pieces | [email protected] | 180 | |
| 69 | SE6014-5584 | SNAP GAUGE | 2 | pieces | [email protected] | 180 | |
| 70 | SE6084-25276-12 | ETALON | 5 | pieces | [email protected] | 180 | |
| 71 | SE6017-0034-02 | GAUGE | 5 | pieces | [email protected] | 180 | |
| 72 | SE6017-0030-03 | GAUGE | 4 | pieces | [email protected] | 180 | |
| 73 | SE607953032 | GAUGE | 5 | pieces | [email protected] | 180 | |
| 74 | SE6012-0016 | VERNIER CALIPER | 5 | pieces | [email protected] | 180 | |
| 75 | SE6015-10414 | HEIGHT GAUGE | 2 | pieces | [email protected] | 180 | |
| 76 | SE607953578 | GAUGE | 5 | pieces | [email protected] | 180 | |
| 77 | SE6304-17423 | JIG | 2 | pieces | [email protected] | 180 | |
| 78 | SE6378-6427 | HOOK | 5 | pieces | [email protected] | 180 | |
| 79 | SE6015-10408 | HEIGHT GAUGE | 5 | pieces | [email protected] | 180 | |
| 80 | SE6084-25276-01 | ETALON | 4 | pieces | [email protected] | 180 | |
| 81 | SE6084-20007 | ETALON | 2 | pieces | [email protected] | 180 | |
| 82 | SE6017-0034-01 | GAUGE | 3 | pieces | [email protected] | 180 | |
| 83 | SE6084-25276-15 | ETALON | 4 | pieces | [email protected] | 180 | |
| 84 | SE6015-7787-01 | HEIGHT GAUGE | 4 | pieces | [email protected] | 180 | |
| 85 | SE6017-0030-01 | GAUGE | 3 | pieces | [email protected] | 180 | |
| 86 | SE6084-25276-10 | ETALON | 4 | pieces | [email protected] | 180 | |
| 87 | SE6015-10436 | HEIGHT GAUGE | 3 | pieces | [email protected] | 180 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar security equipment supply
Financial statements (latest annual report/last 3 years)
Bid security/EMD documentation as per ATC
Technical bid and conformity certificates (if applicable)
OEM authorization/licence (if bidding as authorized distributor)
Any IP address compliance documents (as required by ATC)
Key insights about ODISHA tender market
Bidders should register with HAL's procurement portal, submit GST, PAN, and financial statements, and provide EMD as per ATC. Ensure IP address compliance and vendor-mandated material arrangements. Review the ATC for delivery extension rules and the 25% quantity option during contract to prepare a compliant bid.
Required documents include GST registration, PAN, latest financial statements, experience certificates for similar projects, EMD documentation, technical bid, OEM authorization, and any ATC-specified IP address compliance documents. Prepare vendor-arranged material proof if requested in ATC.
Delivery begins from the last date of the original delivery order. If quantity increases, the extended period is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. The Purchaser may extend up to the original delivery period under the option clause.
The clause allows a +/-25% change in bid quantity at contracted rates during and after contract in currency. Delivery timelines adjust accordingly, based on the last delivery order date, with minimum extension rules of 30 days unless otherwise specified in ATC.
ATC documents specify IP-address compliance; item-level standards are not listed in the initial data. Bidders must follow the ATC for any required technical conformity certificates and vendor-specific material arrangements; ensure all submissions meet IS/defense procurement norms outlined by HAL.
Specific deadline and payment terms are not disclosed in the data. Bidders should consult the ATC document for exact submission dates, EMD amount, and payment terms. Ensure timely submission of GST, PAN, and experience certificates to meet HAL procurement requirements.
ATC mandates IP address matching bids will be rejected; bidders must ensure their submission originates from compliant IP addresses as specified in the ATC. Prepare to provide access controls and secure transmission methods per HAL guidelines.
Since the BOQ lists 87 items without explicit specifications, bidders should rely on the uploaded ATC for technical conformity, vendor-arranged material terms, and delivery clauses. Prepare a robust technical bid highlighting compliance with ATC requirements and experience in defense procurements.