TenderDekho Logo
Closed GEM

Government Tender Published for 100 Inch Ultra HD Interactive Flat Panel Display with Wall mount Kit,86 Inch Ultra HD Interactive F in Pauri Garhwal, UTTARAKHAND

Bid Publish Date

06-Mar-2026, 9:56 am

Bid End Date

26-Mar-2026, 10:00 am

EMD

₹3,71,000

Value

₹1,85,50,000

Progress

Issue06-Mar-2026, 9:56 am
AwardPending

Public procurement opportunity for Uttarakhand University Of Horticulture And Forestry (uuhf) Bharsar 100 Inch Ultra HD Interactive Flat Panel Display with Wall mount Kit, 86 Inch Ultra HD Interactive F in Pauri Garhwal, UTTARAKHAND. Quantity: 2293 issued by. Submission Deadline: 26-03-2026 10: 00: 00. View full details and respond.

Authority & Contact

Organization

Uttarakhand University Of Horticulture And Forestry (uuhf) Bharsar

Tender Data

Bid Details

Quantity

2293

Category

86 Inch Ultra HD Interactive Flat Panel Display with Wall mount Kit

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Requirements

Min. Avg. Annual Turnover

93

OEM Avg. Turnover

742

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

HORTICULTURE DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8883356.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 70 Items Sign in for GEM prices

#1

100 Inch Ultra HD Interactive Flat Panel Display with Wall mount Kit

As per attached specifications

1 pieces Delivery: 100 days
#2

86 Inch Ultra HD Interactive Flat Panel Display with Wall mount Kit

As per attached specifications

3 pieces Delivery: 100 days
#3

65 inch Ultra HD professional large format Display with wall mount kit

As per attached specifications

2 pieces Delivery: 100 days
#4

Micro PC Intel core i5 8GB RAM 512 GB SSD with wireless keyboard and mouse

As per attached specifications

1 pieces Delivery: 100 days
#5

Digital Podium

As per attached specifications

3 pieces Delivery: 100 days
#6

Active Ceiling Tile Array Microphone

As per attached specifications

2 pieces Delivery: 100 days
#7

Digital Signal Processor

As per attached specifications

2 pieces Delivery: 100 days
#8

Virtual Classroom Solution

As per attached specifications

2 pieces Delivery: 100 days
#9

AI Based Auto Tracking PTZ Video Conferencing Camera

As per attached specifications

2 pieces Delivery: 100 days
#10

Full HD PTZ Video Conferencing Camera

As per attached specifications

2 pieces Delivery: 100 days
#11

250 watt Audio Amplifier

As per attached specifications

1 pieces Delivery: 100 days
#12

Ceiling Flush mount Speaker with 30 watt Audio capacity

As per attached specifications

20 pieces Delivery: 100 days
#13

Dual Seating Student Desk

As per attached specifications

140 pieces Delivery: 100 days
#14

2x2 Ceiling LED Panel Light

As per attached specifications

130 pieces Delivery: 100 days
#15

2x2 Grid False Ceiling As per room requirement in Smart Classroom A17 Block A 19 feet x 28 feet

As per attached specifications

1 pieces Delivery: 100 days
#16

2x2 Grid False Ceiling As per room requirement in Smart Classroom A27 Block A 19 feet x 28 feet

As per attached specifications

1 pieces Delivery: 100 days
#17

2x2 Grid False Ceiling As per room requirement in Smart Classroom C15 Block C 17 feet x 26 feet

As per attached specifications

1 pieces Delivery: 100 days
#18

2x2 Grid False Ceiling As per room requirement in Virtual Classroom A4 Block A Near Dean office 18 feet x 28 feet

As per attached specifications

1 pieces Delivery: 100 days
#19

2x2 Grid False Ceiling As per room requirement in Virtual Classroom at Lecture complex Rani Chauri 14 feet x 32 feet

As per attached specifications

1 pieces Delivery: 100 days
#20

2x2 Grid False Ceiling As per room requirement in smart Classroom at Lecture complex Rani Chauri 14 feet x 32 feet

As per attached specifications

1 pieces Delivery: 100 days
#21

Acoustic floor Carpeting As per room requirement in Virtual Classroom A4 Block A Near Dean office 18 feet x 28 feet

As per attached specifications

1 pieces Delivery: 100 days
#22

Acoustic floor Carpeting As per room requirement in Smart Classroom A17 Block A 19 feet x 28 feet

As per attached specifications

1 pieces Delivery: 100 days
#23

Acoustic floor Carpeting As per room requirement in Smart Classroom A27 Block A 19 feet x 28 feet

As per attached specifications

1 pieces Delivery: 100 days
#24

Acoustic floor Carpeting As per room requirement in Smart Classroom B3 Hall Block B 28 feet x 46 feet

As per attached specifications

1 pieces Delivery: 100 days
#25

Acoustic floor Carpeting As per room requirement in Smart Classroom C15 Block C 17 feet x 26 feet

As per attached specifications

1 pieces Delivery: 100 days
#26

Acoustic floor Carpeting As per room requirement in Virtual Classroom at Lecture complex Rani Chauri 14 feet x 32 feet

As per attached specifications

1 pieces Delivery: 100 days
#27

Acoustic floor Carpeting As per room requirement in smart Classroom at Lecture complex Rani Chauri 14 feet x 32 feet

As per attached specifications

1 pieces Delivery: 100 days
#28

2 Ton Split Air Conditioner Hot and Cool with outdoor unit

As per attached specifications

8 pieces Delivery: 100 days
#29

Minor Civil and Paint Works As per room requirement in Smart Classroom A17 Block A 19 feet x 28 feet

As per attached specifications

1 pieces Delivery: 100 days
#30

Minor Civil and Paint Works As per room requirement in Smart Classroom A27 Block A 19 feet x 28 feet

As per attached specifications

1 pieces Delivery: 100 days
#31

Minor Civil and Paint Works As per room requirement in Smart Classroom B3 Hall Block B 28 feet x 46 feet

As per attached specifications

1 pieces Delivery: 100 days
#32

Minor Civil and Paint Works As per room requirement in Smart Classroom C15 Block C 17 feet x 26 feet

As per attached specifications

1 pieces Delivery: 100 days
#33

Minor Civil and Paint Works As per room requirement in Virtual Classroom A4 Block A Near Dean office 18 feet x 28 feet

As per attached specifications

1 pieces Delivery: 100 days
#34

Minor Civil and Paint Works As per room requirement in Virtual Classroom at Lecture complex Rani Chauri 14 feet x 32 feet

As per attached specifications

1 pieces Delivery: 100 days
#35

Minor Civil and Paint Works As per room requirement in smart Classroom at Lecture complex Rani Chauri 14 feet x 32 feet

As per attached specifications

1 pieces Delivery: 100 days
#36

All Connecting Cables and other Required accessories as per requirement for Smart Classroom B3 Hall Block B 28 feet x 46 feet

As per attached specifications

1 pieces Delivery: 100 days
#37

All Connecting Cables and other Required accessories as per requirement for Smart Classroom at Lecture complex

As per attached specifications

1 pieces Delivery: 100 days
#38

Other Electrifications works required to install AV equipment in Smart Classroom B3 Hall Block B28 feet x 46 feet

As per attached specifications

1 pieces Delivery: 100 days
#39

Other Electrifications works required to install AV equipment for Smart Classroom at Lecture complex

As per attached specifications

1 pieces Delivery: 100 days
#40

PVC Wall Panelling as per room requirement in Virtual Classroom A4 Block A Near Dean office 18 feet x 28 feet

As per attached specifications

1 pieces Delivery: 100 days
#41

PVC Wall Panelling as per room requirement in Smart Classroom A17 Block A 19 feet x 28 feet

As per attached specifications

1 pieces Delivery: 100 days
#42

PVC Wall Panelling as per room requirement in Smart Classroom A27 Block A 19 feet x 28 feet

As per attached specifications

1 pieces Delivery: 100 days
#43

PVC Wall Panelling as per room requirement in Smart Classroom C15 Block C 17 feet x 26 feet

As per attached specifications

1 pieces Delivery: 100 days
#44

PVC Wall Panelling as per room requirement in Virtual Classroom at Lecture complex Rani Chauri 14 feet x 32 feet

As per attached specifications

1 pieces Delivery: 100 days
#45

PVC Wall Panelling as per room requirement in smart Classroom at Lecture complex Rani Chauri 14 feet x 32 feet

As per attached specifications

1 pieces Delivery: 100 days
#46

Reparing of existing Wall Panelling as per room requirement in Smart Classroom B3 Hall Block B 28 feet x 46 feet

As per attached specifications

1 pieces Delivery: 100 days
#47

Roller Blinds or Curtains As per room requirement in Virtual Classroom A4 Block A Near Dean office 18 feet x 28 feet

As per attached specifications

3 pieces Delivery: 100 days
#48

Roller Blinds or Curtains As per room requirement in Smart Classroom B3 Hall Block B 28 feet x 46 feet

As per attached specifications

4 pieces Delivery: 100 days
#49

Roller Blinds or Curtains As per room requirement in Virtual Classroom at Lecture complex Rani Chauri 14 feet x 32 feet

As per attached specifications

3 pieces Delivery: 100 days
#50

2MP IP Camera with inbuilt or external microphone

As per attached specifications

10 pieces Delivery: 100 days
#51

16 Channel Network Video Recorder with 8TB HDD with 30 days recording

As per attached specifications

1 pieces Delivery: 100 days
#52

Active speaker at Dean Office Soundbar

As per attached specifications

1 pieces Delivery: 100 days
#53

Active speakers for classrooms connected to each CCTV camera with Power supply

As per attached specifications

10 pieces Delivery: 100 days
#54

6U Indoor Rack with 6 power socket

As per attached specifications

3 pieces Delivery: 100 days
#55

8 Port PoE Switch with 4 SFP Uplink

As per attached specifications

3 pieces Delivery: 100 days
#56

12 Core Armoured Fiber Optic Cable Single mode with Arial Laying

As per attached specifications

400 pieces Delivery: 100 days
#57

1G SFP Module single Mode Pair

As per attached specifications

2 pieces Delivery: 100 days
#58

1KVA Online UPS

As per attached specifications

2 pieces Delivery: 100 days
#59

2 KVA offline UPS with mounting rack

As per attached specifications

2 pieces Delivery: 100 days
#60

2KVA Online UPS

As per attached specifications

1 pieces Delivery: 100 days
#61

PVC Conduit of Minimum 25mm

As per attached specifications

300 pieces Delivery: 100 days
#62

Soft Digging Minimum 3 feet in HDPE or GI Pipe

As per attached specifications

200 pieces Delivery: 100 days
#63

3 Core Armoured Power Cable 1.5 sqmm

As per attached specifications

90 pieces Delivery: 100 days
#64

Cat 6 UTP Cable Supply and Laying per Meter

As per attached specifications

600 pieces Delivery: 100 days
#65

Fiber Enclosure box Splicing box

As per attached specifications

3 pieces Delivery: 100 days
#66

Fiber Patch Cord Single Mode LCLC Pair

As per attached specifications

2 pieces Delivery: 100 days
#67

Gooseneck microphone with phantom power

As per attached specifications

2 pieces Delivery: 100 days
#68

Hard Digging Minimum 3 feet in HDPE or GI Pipe

As per attached specifications

50 pieces Delivery: 100 days
#69

HDPE Pipe 32mm

As per attached specifications

250 pieces Delivery: 100 days
#70

Installation and commissioning charges for Centralized CCTV Solution for 5 Smart Classrooms

As per attached specifications

1 pieces Delivery: 100 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer