Uttar Pradesh Forest Corporation Off-Grid Solar PV Power Plant Tender Etawah 2026 - IS 550, PCU & Solar Module Standards

Bid Publish Date

20-May-2026, 12:25 pm

Bid End Date

30-May-2026, 1:00 pm

Progress

Issue20-May-2026, 12:25 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Key Highlights

  • OEM turnover threshold and three-year average turnover requirement
  • 25% quantity option clause with extended delivery period calculation
  • Delivery address specified: Forest Guest House, Sahaso Range, Etawah
  • Charger technology detail required for PCU/inverter
  • IS 550 or other standards to be specified in bid response
  • Compliance with non-liquidity and non-bankruptcy requirement
  • On-site installation/commissioning within scope (if applicable)

Categories 5

Tender Overview

The Uttar Pradesh Forest Corporation invites bids for an Off-Grid Solar Photovoltaic (PV) Power Plant (V2) – Q3 located at Etawah, Uttar Pradesh 206001. Scope includes a complete solar PV system with defined kVA capacity, PV module type, minimum PV module wattage (Wp), PCU/Solar Inverter rated kVA, and charger technology. The procurement includes potential quantity adjustments up to 25% over the bid/contract quantity. Bidders must address installation at Forest Guest House Sahaso Range, Etawah, with delivery timelines aligned to the tender terms. This package emphasizes OEM turnover and system performance standards to ensure reliable off-grid power supply for forest operations.

Technical Specifications & Requirements

  • Capacity of power plant: specified in kVA (exact value not disclosed in data).
  • PV Module: type and rated power in Wp (minimum specified but not numerically stated).
  • PCU / Solar Inverter: Rated Power in kVA; include inverter rating details.
  • Charger technology: must be disclosed; bidders should confirm compatibility with off-grid PV configurations.
  • Critical delivery address: Forest Guest House, Sahaso Range, Etawah, UP 206125; on-site installation if scope includes commissioning.
  • Tender terms include option to increase/decrease quantities by up to 25%, with calculation for extra delivery time.
  • Turnover criteria require three-year average turnover and OEM turnover to meet bid document thresholds; submission must include certified financials.

Terms, Conditions & Eligibility

  • EMD/financial security criteria are specified in the bid document and must be met.
  • Delivery timeline: aligned to the original delivery period with extension rules if option clause is exercised.
  • Financial standing: bidder must not be in liquidation or similar proceedings; an undertaking is required.
  • Turnover requirements: last three years’ average turnover for bidder and OEM must meet the bid document thresholds, with audited statements or CA certificates.
  • Documentation: submission of GST, PAN, experience certificates, and OEM authorizations where applicable; compliant with the Forest Department Uttar Pradesh terms.

Key Specifications

  • Off-Grid Solar PV power plant capacity in kVA

  • PV module type (specific technology) and minimum rated power (Wp)

  • PCU/solar inverter rated power in kVA and charger technology

  • Delivery location and commissioning scope

  • Option clause allowing ±25% quantity variation with extended delivery timing

  • Three-year average turnover requirement for bidder and OEM

Terms & Conditions

  • Delivery to Forest Guest House Etawah with potential 25% quantity variation

  • Mandatory turnover and financial standing documentation from bidders and OEM

  • EMD and GST/PAN and experience/OEM documents required for bid submission

Important Clauses

Payment Terms

Details not provided; bidders must refer to bid document for payment schedule and terms.

Delivery Schedule

Delivery period as per original order; extension aligned with option clause and calculated formula.

Penalties/Liquidated Damages

Penalties would be defined in the terms; ensure compliance with delivery and commissioning timelines.

Bidder Eligibility

  • Not under liquidation or bankruptcy; valid undertaking to this effect

  • Three-year average turnover requirement with supporting audited statements

  • OEM turnover criteria met for offered product; CA certificate acceptable

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3)

Authority Records

FOREST DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9354443.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Generic Capacity of power plant (kVA) 3.5
PV Module Type of Solar Module Crystalline Silicon Terrestrial Photovoltaic (PV) modules conforming to IS 14286 IS/IEC 61730 -1 IS/IEC 61730 -2, Thin-Film Terrestrial Photovoltaic (PV) Modules conforming to IS 16077 IS/IEC 61730 -1 IS/IEC 61730 -2
PV Module Rated power of PV module (in Wp) - Minimum 1000, 1500, 2000, 2500, 3500, 4000, 5000, 6000, 7500, 10000, 12000, 15000, 18000, 20000, 25000, 30000, 50000, 60000, 80000, 100000
Power Conditioning Unit (PCU)/ Solar Inverter Rated Power (in kVA) (Hint: Inverter Rating) 1, 1.5, 2, 2.5, 3.5, 4, 5, 6, 7.5, 10, 12, 15, 18, 20, 25, 30, 50, 60, 80, 100
Power Conditioning Unit (PCU)/ Solar Inverter Charger technology PWM, MPPT

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements or CA/Cost Accountant turnover certificate for last 3 years

4

Turnover certificates for OEM if applicable

5

Experience certificates for similar off-grid solar projects

6

OEM authorization letter for the offered PV modules and PCUs

7

Bid security/EMD submission proof

8

Technical compliance certificates and any ISI/ISO certifications if specified

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for the off-grid solar PV tender in Etawah Uttar Pradesh 2026?

To bid, bidders must submit GST, PAN, audited turnover certificates for three years, OEM authorizations, EMD, and technical compliance documents. Ensure the offered PV modules meet minimum Wp ratings and PCU inverter is rated in kVA as per tender terms. Compliance with the UP Forest Department is essential.

What documents are required for UP Forest solar procurement bidding 2026?

Required documents include GST certificate, PAN card, audited financial statements or CA turnover certificate for last three years, OEM authorization letters, experience certificates for similar projects, EMD proof, and technical bid documents. Ensure all documents are up-to-date and properly certified.

What standards or certifications are expected for PV modules & PCUs in this tender?

Bidders should confirm IS 550 compliance or equivalent standards and provide any related safety/certification documentation. OEM-level certifications may be required for PV modules and PCUs; attach proofs with the bid to demonstrate compliance.

When is the delivery period and how are extensions calculated for quantity variations?

Delivery aligns with the original delivery period; extensions follow the option clause. For increased quantity, the extra time is (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days, with further extension possible up to the original period.

What is the EMD amount for the Etawah solar project procurement 2026?

The tender specifies an EMD amount in the bid document; bidders should reference the exact figure and payment method (DD/online) as stated in the official tender terms to avoid disqualification.

What is the required turnover for bidders and OEMs for this UP tender?

Bidder and OEM must show the minimum average annual turnover over the last three years ending March 31 of the previous year, supported by audited statements or CA certificates; if the bidder/OEM is <3 years old, turnover is calculated on completed years after incorporation.

What is the delivery location for installation and commissioning of the solar plant?

Delivery/installation must occur at Forest Guest House, Sahaso Range, Etawah, Uttar Pradesh 206125; ensure on-site commissioning is included if the scope covers installation, with coordination to Forest Department UP.

How to verify OEM turnover criteria for the offered solar product?

Provide certified audited turnover statements or CA certificates for the OEM for the last three years; for newer OEMs, compute average turnover from completed financial years post-incorporation per bid requirements.