Bid Publish Date
20-May-2026, 12:25 pm
Bid End Date
30-May-2026, 1:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
The Uttar Pradesh Forest Corporation invites bids for an Off-Grid Solar Photovoltaic (PV) Power Plant (V2) – Q3 located at Etawah, Uttar Pradesh 206001. Scope includes a complete solar PV system with defined kVA capacity, PV module type, minimum PV module wattage (Wp), PCU/Solar Inverter rated kVA, and charger technology. The procurement includes potential quantity adjustments up to 25% over the bid/contract quantity. Bidders must address installation at Forest Guest House Sahaso Range, Etawah, with delivery timelines aligned to the tender terms. This package emphasizes OEM turnover and system performance standards to ensure reliable off-grid power supply for forest operations.
Off-Grid Solar PV power plant capacity in kVA
PV module type (specific technology) and minimum rated power (Wp)
PCU/solar inverter rated power in kVA and charger technology
Delivery location and commissioning scope
Option clause allowing ±25% quantity variation with extended delivery timing
Three-year average turnover requirement for bidder and OEM
Delivery to Forest Guest House Etawah with potential 25% quantity variation
Mandatory turnover and financial standing documentation from bidders and OEM
EMD and GST/PAN and experience/OEM documents required for bid submission
Details not provided; bidders must refer to bid document for payment schedule and terms.
Delivery period as per original order; extension aligned with option clause and calculated formula.
Penalties would be defined in the terms; ensure compliance with delivery and commissioning timelines.
Not under liquidation or bankruptcy; valid undertaking to this effect
Three-year average turnover requirement with supporting audited statements
OEM turnover criteria met for offered product; CA certificate acceptable
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| Generic | Capacity of power plant (kVA) | 3.5 |
| PV Module | Type of Solar Module | Crystalline Silicon Terrestrial Photovoltaic (PV) modules conforming to IS 14286 IS/IEC 61730 -1 IS/IEC 61730 -2, Thin-Film Terrestrial Photovoltaic (PV) Modules conforming to IS 16077 IS/IEC 61730 -1 IS/IEC 61730 -2 |
| PV Module | Rated power of PV module (in Wp) - Minimum | 1000, 1500, 2000, 2500, 3500, 4000, 5000, 6000, 7500, 10000, 12000, 15000, 18000, 20000, 25000, 30000, 50000, 60000, 80000, 100000 |
| Power Conditioning Unit (PCU)/ Solar Inverter | Rated Power (in kVA) (Hint: Inverter Rating) | 1, 1.5, 2, 2.5, 3.5, 4, 5, 6, 7.5, 10, 12, 15, 18, 20, 25, 30, 50, 60, 80, 100 |
| Power Conditioning Unit (PCU)/ Solar Inverter | Charger technology | PWM, MPPT |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements or CA/Cost Accountant turnover certificate for last 3 years
Turnover certificates for OEM if applicable
Experience certificates for similar off-grid solar projects
OEM authorization letter for the offered PV modules and PCUs
Bid security/EMD submission proof
Technical compliance certificates and any ISI/ISO certifications if specified
Key insights about UTTAR PRADESH tender market
To bid, bidders must submit GST, PAN, audited turnover certificates for three years, OEM authorizations, EMD, and technical compliance documents. Ensure the offered PV modules meet minimum Wp ratings and PCU inverter is rated in kVA as per tender terms. Compliance with the UP Forest Department is essential.
Required documents include GST certificate, PAN card, audited financial statements or CA turnover certificate for last three years, OEM authorization letters, experience certificates for similar projects, EMD proof, and technical bid documents. Ensure all documents are up-to-date and properly certified.
Bidders should confirm IS 550 compliance or equivalent standards and provide any related safety/certification documentation. OEM-level certifications may be required for PV modules and PCUs; attach proofs with the bid to demonstrate compliance.
Delivery aligns with the original delivery period; extensions follow the option clause. For increased quantity, the extra time is (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days, with further extension possible up to the original period.
The tender specifies an EMD amount in the bid document; bidders should reference the exact figure and payment method (DD/online) as stated in the official tender terms to avoid disqualification.
Bidder and OEM must show the minimum average annual turnover over the last three years ending March 31 of the previous year, supported by audited statements or CA certificates; if the bidder/OEM is <3 years old, turnover is calculated on completed years after incorporation.
Delivery/installation must occur at Forest Guest House, Sahaso Range, Etawah, Uttar Pradesh 206125; ensure on-site commissioning is included if the scope covers installation, with coordination to Forest Department UP.
Provide certified audited turnover statements or CA certificates for the OEM for the last three years; for newer OEMs, compute average turnover from completed financial years post-incorporation per bid requirements.