TenderDekho Logo
GEM

Government Tender Published for 1600325079 FAN 1 PH 6 INCH 230V AC FAN PHASE: 1 PH SWEEP: 6 INCH VOLTAGE: 230V AC AIR DELIVERY: 190 in BASTAR, CHHATTISGARH

Bid Publish Date

26-Feb-2026, 10:21 am

Bid End Date

10-Mar-2026, 1:00 pm

Progress

Issue26-Feb-2026, 10:21 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

28

Bid Type

Single Packet Bid

Categories 2

Nmdc Steel Limited invites bids for 1600325079 FAN 1 PH 6 INCH 230V AC FAN PHASE: 1 PH SWEEP: 6 INCH VOLTAGE: 230V AC AIR DELIVERY: 190-200 in BASTAR, CHHATTISGARH. Quantity: 28. Submission Deadline: 10-03-2026 13: 00: 00. Submit your proposal before the deadline.

Documents 4

GeM-Bidding-9047576.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

CABIN FAN, SWEEP: 450MM, 230V-50 HZ

Iisco Steel Plant

BARDHAMAN, WEST BENGAL

Posted: 3 July 2025
Closed: 14 July 2025
GEM

Sch1_700073713_10_M3501291005_FAN PRPLR 3600-4800M3 HR 230V 55-65W,Sch2_700073713_20_M3501291006_FA

Ntpc Limited

SONBHADRA, UTTAR PRADESH

Posted: 19 May 2025
Closed: 2 June 2025
GEM

BLDC CEILING FAN, 230V, 50HZ, 1400MM (7875360514),BRUSH LESS DC FAN, 1200MM SWEEP (7875360434)

Iocl Bongaigaon Refinery

BONGAIGAON, ASSAM

Posted: 12 August 2025
Closed: 26 August 2025
GEM

1600668388 FAN SING 450MM 230VAC FAN PHASE: SINGLE, EXHAUST FAN SWEEP: 450MM VOLTAGE: 230VAC ADDITI

Nmdc Steel Limited

BASTAR, CHHATTISGARH

Posted: 30 September 2025
Closed: 21 October 2025
GEM

HY7413199246, WALL MOUNTED FAN 400MM ( As per Spec),HY7413199017, PEDASTAL FAN 16" SWEEP 230V 60W (

Bharat Heavy Electricals Limited (bhel)

MEDAK, TELANGANA

Posted: 1 July 2025
Closed: 11 July 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

Additional Doc 1 (Requested in ATC)

3

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer