Bid Publish Date
28-Sep-2022, 2:37 pm
Bid End Date
10-Oct-2022, 5:00 pm
EMD
₹96,000
Value
₹47,54,400
Location
Progress
Tender Type
Open
Tender Fee
₹5,000
Tender Fee Exemption
No
EMD Exemption
No
Category
CIVIL
Public procurement opportunity for The issuing authority Remaining Work of Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps Flouried affected Habitations/ Wards of Districts of Bihar on turn-key basis with 3 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhya mantri Nishchay Flouried Affected) Yojna on Turn Key basis (Ward no-09, 10 of Panchayat- Pain Under Block Sheikhpura) in BIHAR issued by. Submission Deadline: 10-10-2022 17: 00: 00. View full details and respond.
Processing Fee
₹590
Tender Currency
INR
Bid Currency
INR
Ranking Sequence
L1 Ranking
Estimated Value Visibility
Y
Bid To RA
No
Organization Hierarchy
Government of Bihar->Public Health Engineering Department->Bhagalpur Zone->Munger Circle->Sheikhpura Division
Approving Authority
Ravi prakash (Executive Engineer)
Tender Creator
Mr Ravi Prakash (EXECUTIVE ENGINEER)
Pre-Bid Discussion Type
Not Required
| Type | Amount | Currency | Mode | Exemption |
|---|---|---|---|---|
| EMD | ₹96,000 | INR | Internet Payment Gateway(IPG),Challan|Bank Guarantee | No |
| Tender Fee | ₹5,000 | INR | Internet Payment Gateway(IPG),Challan| | No |
| Tender Processing Fee | ₹590 | INR | Internet Payment Gateway(IPG),Challan| | No |
DEPARTMENTAL REGISTRATION CERTIFICATE
COPY OF PAN CARD
GST REGISTRATION CERTIFICATE
AUDIT REPORT OF LAST 5 FINANCIAL YEARS
EXPERIENCE Of SIMILAR NATURE Of W0RKS
BALANCE VALUE OF ON GOING WORKS
BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES
AFFIDAVIT FOR NOC/DEBAR/BLACKLISTING/RESCIND, etc.
UNDERTAKING - 180 DAYS
UNDERTAKING - 25 PERCENT OF WORK DECLARATION
LITIGATION HISTORY
PLANT and MACHINARIES AS PER NIT
KEY PERSONNEL AS PER NIT
Power of Attorney
PROGRAMME Of CONSTRUCTION
LATEST CHARACTER CERTIFICATE ISSUED BY DISTRICT POLICE
LABOUR LICENSE
Bid Validity - 180 DAYS
BID CAPACITY
Work for which Bid already submitted
ANY OTHER DOCUMENTS AS PER NIT
Bid Validity Bids shall remain valid for a period not less than 180 days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 180 Days Bid validity periods In days
(i) Legal Status of Bidder.
(ii) Place of Registration.
(iii) Principal place of Business
(iv) Power of attorney of signatory Bid Attached (If any) or Not
Total value of construction & Operation & Maintenance of Multi Village Scheme performed in last five years. 2017-18 Escalation Factor= 1.61 Annual Financial Turn Over usually not less than 50 % of the estimated annual payments under the contract (Rs in Lakhs) RS. 23.772 LAKHS
Total value of construction & Operation & Maintenance of Multi Village Scheme performed in last five years. 2018-19 Escalation Factor= 1.46 Annual Financial Turn Over usually not less than 50 % of the estimated annual payments under the contract (Rs in Lakhs) RS. 23.772 LAKHS
Total value of construction & Operation & Maintenance of Multi Village Scheme performed in last five years. 2019-20 Escalation Factor= 1.33 Annual Financial Turn Over usually not less than 50 % of the estimated annual payments under the contract (Rs in Lakhs) RS. 23.772 LAKHS
Total value of construction & Operation & Maintenance of Multi Village Scheme performed in last five years. 2020-21 Escalation Factor= 1.21 Annual Financial Turn Over usually not less than 50 % of the estimated annual payments under the contract (Rs in Lakhs) RS. 23.772 LAKHS
Total value of construction & Operation & Maintenance of Multi Village Scheme performed in last five years. 2021-22 Escalation Factor= 1.1 Annual Financial Turn Over usually not less than 50 % of the estimated annual payments under the contract (Rs in Lakhs) RS. 23.772 LAKHS
Work Experience of Similar nature Satisfactory completed atleast one similar work of value not less than 50% of estimated value of contract (Rs in Lakhs) - 23.772
Bidding Capacity: More than the total Bid value of present work = A*N*3-B=Rs. In lacs.Where A = Maxm. Value of work executed in any one yr during last 5 yrs. N= Nos of years for completion of works. B=Value of existing commitments & ongoing works to be completed in period RS. 47.544 LAKHS
(a) Existing commitments and ongoing works Amount To be entered (Rs in Lakhs)
(b) Work for which Bid already submitted Amount To be entered (Rs in Lakhs)
Availability of key items of Contractor's Equipment Type of Equipment/Maximum age No. Required (Up to Rs. 30 Crore) Nos. Max. Age Concrete Mixer 1 5 Vibrator 1 5 Compressor 1 5 Truck/Tractor with trailer 1 5 Nos.
Key Personnel Personnel/Qualification/Contract Package Size (Upto Rs. 30 Crore) Nos. Project Manager/ B.E. Civil + 10Years Exp. (5 years as Manager in PHED works) or retired E.E. & above of PHED) 1 Site Engineer / B.E. Civil + 07Years Exp. (3 years as Manager in PHED works) or retired A.E. & above of PHED 2 Site Supervisor / B.E. Mech./Civil + 05 Years Exp. Or Dip. Mech./Civil + 07 years Exp. Or or retired J.E. & above of PHED 2
Evidence of accesses to Financial Resources Evidence of access to or availability of creadit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). - 4.754
Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not)
Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not)
Affidavit Regarding statements made in the required attachments are true and correct. /Not resigned previously allotted work and not blacklisted from any Organization (Attached or not)
ndertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract. RS. 11.886 LAKHS (Attached or not)
Time of Completion in months 3 months Execution Part & After That Min Three monthes of Trail Run and 60 months of Operation and Maintenance After Successfull Trial Run
Registration No. (Attached or not)
Latest Character Certificate Issued by District Police (Attached or not)
I.T. & G.S.T. Registration (Attached or not)
Mobile No. & Email ID
NOC for Debar (Attached or not)
Any Document as per Nit
Please Read and Accept All Terms and Conditions as per NIT
Please Read and Accept All Terms and Conditions as per NIT
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
NIT
GENERAL_DOCUMENT
GENERAL_DOCUMENT
CORRIGENDUM
GENERAL_DOCUMENT
GENERAL_DOCUMENT
Total Part (A) Execution Part Providing and Laying Distrbution network of High Density Polyethyene pipe (HDPE pipe) all complete as per direction of E/I.
Total Part (A) Execution Part Providing and Laying Distrbution network of High Density Polyethyene pipe (HDPE pipe) all complete as per direction of E/I.
50MM Dia
50MM Dia
40MM Dia
40MM Dia
Distrbution network of already laid High Density Polyethyene pipe (HDPE pipe) including 10000 liter PVC tank installed at 8M high MS staging etc all complete as per direction of E/I.
Distrbution network of already laid High Density Polyethyene pipe (HDPE pipe) including 10000 liter PVC tank installed at 8M high MS staging etc all complete as per direction of E/I.
estimate for supply, installation & commissioning of all accessories including extension of L.T. line from nearest source up-to pumping station for single phase 3 H.P submersible motor pump.
estimate for supply, installation & commissioning of all accessories including extension of L.T. line from nearest source up-to pumping station for single phase 3 H.P submersible motor pump.
Providing house connection for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia MDPE and 15mm GI Pipes with all fittings etc all complete.
Providing house connection for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia MDPE and 15mm GI Pipes with all fittings etc all complete.
Repairing of old house connection and 15mm GI Pipes with all fittings etc all complete.
Repairing of old house connection and 15mm GI Pipes with all fittings etc all complete.
Providing and erecting 8M high staging with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per drawing attached.
Providing and erecting 8M high staging with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per drawing attached.
Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl)
Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl)
Total Part (B) Operation & Maintenance for 5 Years
Total Part (B) Operation & Maintenance for 5 Years
Comprehensive Operation & Maintenance including repairs of Civil & Mechanical Structures, Supply of Spare parts, all Chemical, Energy cost, Deployment of manpower, checking of status of supply in the command area, repairing of leakages, maintaining log book , data compilation, submission of daily / weekly / monthly and yearly report of RAW water , getting endorsed / tested by state laboratories once in every month, damaged parts of any machinery / the machinery as a whole, annual / bi-annual maintenance of all built-up / installed structures / units under the scheme , including round-the clock watch & ward to ensure potable water to the beneficiaries of the scheme for 60 calendar months from the date of completion of trial run
Comprehensive Operation & Maintenance including repairs of Civil & Mechanical Structures, Supply of Spare parts, all Chemical, Energy cost, Deployment of manpower, checking of status of supply in the command area, repairing of leakages, maintaining log book , data compilation, submission of daily / weekly / monthly and yearly report of RAW water , getting endorsed / tested by state laboratories once in every month, damaged parts of any machinery / the machinery as a whole, annual / bi-annual maintenance of all built-up / installed structures / units under the scheme , including round-the clock watch & ward to ensure potable water to the beneficiaries of the scheme for 60 calendar months from the date of completion of trial run
Energy charges will be paid as per actual bill receipt issued by the electricity department excluding DPS or any penalty. (Any kind of penalty should be borne by the contractor.)
Energy charges will be paid as per actual bill receipt issued by the electricity department excluding DPS or any penalty. (Any kind of penalty should be borne by the contractor.)
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Rate | Estimated Cost | Mandatory | Price Trends |
|---|---|---|---|---|---|---|---|---|---|---|
| A | Total Part (A) Execution Part Providing and Laying Distrbution network of High Density Polyethyene pipe (HDPE pipe) all complete as per direction of E/I. | Total Part (A) Execution Part Providing and Laying Distrbution network of High Density Polyethyene pipe (HDPE pipe) all complete as per direction of E/I. | - | - | - | - | ₹0 | - | Yes | |
| A1 | 50MM Dia | 50MM Dia | 200 | meter | - | - | ₹0 | ₹0 | Yes | |
| A2 | 40MM Dia | 40MM Dia | 200 | meter | - | - | ₹0 | ₹0 | Yes | |
| B | Distrbution network of already laid High Density Polyethyene pipe (HDPE pipe) including 10000 liter PVC tank installed at 8M high MS staging etc all complete as per direction of E/I. | Distrbution network of already laid High Density Polyethyene pipe (HDPE pipe) including 10000 liter PVC tank installed at 8M high MS staging etc all complete as per direction of E/I. | 2 | job | - | - | ₹0 | ₹0 | Yes | |
| C | estimate for supply, installation & commissioning of all accessories including extension of L.T. line from nearest source up-to pumping station for single phase 3 H.P submersible motor pump. | estimate for supply, installation & commissioning of all accessories including extension of L.T. line from nearest source up-to pumping station for single phase 3 H.P submersible motor pump. | 2 | job | - | - | ₹0 | ₹0 | Yes | |
| D | Providing house connection for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia MDPE and 15mm GI Pipes with all fittings etc all complete. | Providing house connection for each house hold including supplying all materials, labours, tools and making ferrule connection with 20 mm dia MDPE and 15mm GI Pipes with all fittings etc all complete. | 40 | job | - | - | ₹0 | ₹0 | Yes | |
| E | Repairing of old house connection and 15mm GI Pipes with all fittings etc all complete. | Repairing of old house connection and 15mm GI Pipes with all fittings etc all complete. | 2 | job | - | - | ₹0 | ₹0 | Yes | |
| F | Providing and erecting 8M high staging with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per drawing attached. | Providing and erecting 8M high staging with ladder of ISA65x65x6 and 16mm dia MS bar as trade @ 400mm c/c and GI enclosure to house electric switch panel & treatment unit (where required) of suitably designed MS section of angle, channel, etc. as per drawing attached. | 2 | job | - | - | ₹0 | ₹0 | Yes | |
| G | Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl) | Installation of Electronically Regulated Doser type chlorinator using Sodium Hypo Chlorite (Hypo NaOCl) | 2 | job | - | - | ₹0 | ₹0 | Yes | |
| H | Total Part (B) Operation & Maintenance for 5 Years | Total Part (B) Operation & Maintenance for 5 Years | - | - | - | - | ₹0 | ₹4,89,354 | Yes | |
| H1 | Comprehensive Operation & Maintenance including repairs of Civil & Mechanical Structures, Supply of Spare parts, all Chemical, Energy cost, Deployment of manpower, checking of status of supply in the command area, repairing of leakages, maintaining log book , data compilation, submission of daily / weekly / monthly and yearly report of RAW water , getting endorsed / tested by state laboratories once in every month, damaged parts of any machinery / the machinery as a whole, annual / bi-annual maintenance of all built-up / installed structures / units under the scheme , including round-the clock watch & ward to ensure potable water to the beneficiaries of the scheme for 60 calendar months from the date of completion of trial run | Comprehensive Operation & Maintenance including repairs of Civil & Mechanical Structures, Supply of Spare parts, all Chemical, Energy cost, Deployment of manpower, checking of status of supply in the command area, repairing of leakages, maintaining log book , data compilation, submission of daily / weekly / monthly and yearly report of RAW water , getting endorsed / tested by state laboratories once in every month, damaged parts of any machinery / the machinery as a whole, annual / bi-annual maintenance of all built-up / installed structures / units under the scheme , including round-the clock watch & ward to ensure potable water to the beneficiaries of the scheme for 60 calendar months from the date of completion of trial run | 2 | job | - | - | ₹0 | ₹0 | Yes | |
| H2 | Energy charges will be paid as per actual bill receipt issued by the electricity department excluding DPS or any penalty. (Any kind of penalty should be borne by the contractor.) | Energy charges will be paid as per actual bill receipt issued by the electricity department excluding DPS or any penalty. (Any kind of penalty should be borne by the contractor.) | 2 | job | - | - | ₹2,44,677 | ₹4,89,354 | Yes |