North Eastern Electric Power Corporation Limited has released a public tender for Rectification of all Water Leakages Points & Pipe Strengthening in 250 NB Firefighting Pipelines in PAPUM PARE, ARUNACHAL PRADESH. Quantity: 1. Submission Deadline: 20-08-2026 15: 00: 00. Download documents and apply online.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
3
OEM Avg. Turnover
12
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Rectification of all Water Leakages Points & Pipe Strengthening in 250 NB Firefighting Pipelines
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Papum Pare
Delivery Pincodes
791112
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Tarh Naga | 791112,O/O DGM (E), OnM, Dikrong Power House, NEEPCO Ltd. HOJ | Papum Pare | Arunachal Pradesh | 791112 | 1 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
TECHNICAL
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
20-Aug-2026, 9:30 am
Opening Date
20-Aug-2026, 10:00 am
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer