50W FM Transmitter,Two bay 2 Dipole Antenna,RF Cable RF Co axial cable 50 meter with N connector at
Indian Army
CHANDIGARH, CHANDIGARH
Progress
Quantity
1261
Category
SMPS Powerplant Rectifier modular Type Input 3 phase Output 54V DC 100A Module 4 plus 1 with Rack and Remote access function like smtp for integration to IBMS set
Bid Type
Two Packet Bid
Indian Navy seeks a turnkey supply and integration package for a modular SMPS Powerplant Rectifier system, including 3-phase input, 54V DC, 100A output per module, configured as 4 plus 1 with a rack and remote access for IBMS integration. The package also covers Li-ion Battery Bank: 100Ah x 5 nos, 48V nominal (42-54V DC), with a matching rack and remote control. Ancillary items include surge protection in EB panel room, AC isolator 100A/200A 4-pole, GI cable tray (1 ft width, 5 cm height), DC earthing, copper earth strip bus bars, MCBs, fire extinguisher, and enterprise IBMS components (fire sensor, CCTV, access control). EMD is ₹299,986; procurement includes extensive installation across power plant and SLTE rooms, with anti-static flooring, false ceilings, partitioning, and related electrical works.
3-phase input SMPS powerplant rectifier
54V DC output at 100A per module
Configuration: 4 modules + 1 spare with rack
Li-ion battery bank: 100Ah x 5 nos, 48V nominal (42-54V DC)
Remote access IMBS integration capability
Surge protection, AC isolator 100A/200A, 4-pole
GI cable tray, copper earth strips/bus bars
MCB 16A, fire extinguisher set, IBMS components
EMD amount and submission of PAN, GSTIN, cancelled cheque and EFT mandate
IBMS integration and remote access requirements with master control room
Delivery, installation, warranty/penalty terms to be confirmed in ATC
Terms to be as per buyer ATC; verify progress and final payment milestones with Navy procurement
Installation across Navy power plant and SLTE rooms with anti-static flooring and false ceilings; delivery timeline to be clarified in ATC
Penalties to be specified in ATC; confirm LD rates and performance bond requirements
Demonstrated experience in integrated powerplant with IBMS
Compliance with PAN, GSTIN, EFT mandate, and bank-certified documentation
Ability to supply 3-phase SMPS rectifiers with 54V DC 100A outputs and Li-ion battery racks
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
CHANDIGARH, CHANDIGARH
Yantra India Limited
NAGPUR, MAHARASHTRA
Airports Authority Of India
SURAT, GUJARAT
Indian Army
CHANDIGARH, CHANDIGARH
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | SMPS Powerplant Rectifier modular Type Input 3 phase Output 54V DC 100A Module 4 plus 1 with Rack and Remote access function like smtp for integration to IBMS set | SMPS Powerplant Rectifier modular Type Input 3 phase Output 54V DC 100A Module 4 plus 1 with Rack and Remote access function like smtp for integration to IBMS set | 6 | pieces | rohitmali | 90 |
| 2 | Li ion Battery 100AH 5 nos 48 V nominal 42 to 54 V DC with Rack and Remote access function like smtp for integration to IBMS set | Li ion Battery 100AH 5 nos 48 V nominal 42 to 55 V DC with Rack and Remote access function like smtp for integration to IBMS set | 6 | pieces | rohitmali | 90 |
| 3 | Surge Protection in EB panel room Part of Power Plant | Surge Protection in EB panel room Part of Power Plant | 6 | pieces | rohitmali | 90 |
| 4 | AC Isolater for Power Plant 100A or 200A 4 Pole Inside Power Plant Room or Battery Room | AC Isolater for Power Plant 100A or 200A 4 Pole Inside Power Plant Room or Battery Room | 6 | pieces | rohitmali | 90 |
| 5 | GI Cable tray Hanging type with supporting rods nuts and bolts 1 ft width 5 cm height trey for AC main and DC distriboution | GI Cable tray Hanging type with supporting rods nuts and bolts 1 ft width 5 cm height trey for AC main and DC distriboution | 150 | pieces | rohitmali | 90 |
| 6 | Cable 4 core for AC main distribution between EB main and LT panels DG to Main LT panel | Cable 4 core for AC main distribution between EB main and LT panels DG to Main LT panel | 180 | pieces | rohitmali | 90 |
| 7 | Earthing DC 2 Nos 0 point 5 Ohm with interconnecting earth strips 02 termination bus bar nos | Earthing DC 2 Nos 0 point 5 Ohm with interconnecting earth strips 02 termination bus bar nos | 6 | pieces | rohitmali | 90 |
| 8 | AC earth provisioning in SMPS PP Room and SLTE Room | AC earth provisioning in SMPS PP Room and SLTE Room | 6 | pieces | rohitmali | 90 |
| 9 | Copper Earth strip bus bar | Copper Earth strip bus bar | 600 | pieces | rohitmali | 90 |
| 10 | Industrial or Split or Tow AC 1 point 5 T 3 nos for SLTE and 1 point 5T 03 nos for power plant roomer 5 star Inverter Copper with associated MCB Box 16A | Industrial or Split or Tow AC 1 point 5 T 3 nos for SLTE and 1 point 5T 03 nos for power plant roomer 5 star Inverter Copper with associated MCB Box 16A | 18 | pieces | rohitmali | 90 |
| 11 | Fire extinguisher 1set | Fire extinguisher 1set | 12 | pieces | rohitmali | 90 |
| 12 | IBMS with full integration and master control room Fire sensor CCTV Access Control Rodent water leakage temperature Intruder alarm system etc for rooms where it is not | IBMS with full integration and master control room Fire sensor CCTV Access Control Rodent water leakage temperature Intruder alarm system etc for rooms where it is not | 3 | pieces | rohitmali | 90 |
| 13 | Other Associated works like wiring providing sockets switches fuse boxes cabling casing concealing lighting etc lot | Other Associated works like wiring providing sockets switches fuse boxes cabling casing concealing lighting etc lot | 3 | pieces | rohitmali | 90 |
| 14 | Uninterrupted AC power supply 5kVA | Uninterrupted AC power supply 5kVA | 3 | pieces | rohitmali | 90 |
| 15 | Installation of IBMS master control room | Installation of IBMS master control room | 3 | pieces | rohitmali | 90 |
| 16 | Antistatic floor at Minicoy | Antistatic floor at Minicoy | 80 | pieces | rohitmali | 90 |
| 17 | False ceiling at Minicoy | False ceiling at Minicoy | 80 | pieces | rohitmali | 90 |
| 18 | Antistatic floor at Androth | Antistatic floor at Androth | 40 | pieces | rohitmali | 90 |
| 19 | Partition with door access at Androth | Partition with door access at Androth | 13 | pieces | rohitmali | 90 |
| 20 | False ceiling at Androth | False ceiling at Androth | 40 | pieces | rohitmali | 90 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate duly certified by bank
Certificates and other documents as per ATC / Corrigendum
Key insights about KERALA tender market
Bidders must meet eligibility criteria including PAN, GSTIN, and EFT Mandate; upload EMD of ₹299,986; provide certificates per ATC; ensure 3-phase 54V DC 100A modular rectifier with IBMS integration and Li-ion battery racks; follow Navy procurement process and submission deadlines.
Required documents include PAN, GSTIN, cancelled cheque, EFT Mandate certified by bank, and all certificates listed in the ATC; ensure OEM authorizations and technical compliance certificates are available for the bid submission.
Modules must deliver 54V DC at 100A per module, configured as 4+1 with rack, support remote IBMS access, and integrate with Li-ion battery pack of 100Ah × 5 cells; ensure 3-phase input compatibility and surge protection in the EB room.
The EMD is specified as ₹299,986; bidders must submit this amount via the prescribed payment mode along with bid documents as per the ATC and Corrigendum for participation in the tender.
Scope includes IBMS master control room integration with fire sensors, CCTV, access control, rodent/water leakage/temperature monitoring; ensure remote access and full system interoperability with the powerplant and SLTE rooms.
Specified components include surge protection, AC isolators 100A/200A (4-pole), GI cable trays (1 ft width, 5 cm height), copper earth strips/bus bars, MCB 16A, and anti-static flooring/false ceilings for designated Navy rooms.
Delivery involves Navy facilities including Minicoy and Androth locations with associated works in power plant and SLTE rooms; exact installation sites to be confirmed in the ATC and site visit reports.
Warranty and LD terms are to be clarified in the ATC; bidders should seek explicit warranty period, coverage, and LD percentages in the final bid documents and ensure compliance prior to submission.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC