Tender Notice for Dismantling and SITC Ducting for Air Conditioning Ventilation Thickness 0.63 mm sheet,Dismantling a in SOUTH GOA, GOA

Bid Publish Date

06-Oct-2025, 5:47 pm

Bid End Date

03-Nov-2025, 3:00 pm

EMD

₹2,63,775

Value

₹1,31,88,769

Generate Docs

Progress

Issue06-Oct-2025, 5:47 pm
Technical27-10-2025 16:02:34
Financial
Award15-Jan-2026, 12:54 am
Explore all 4 tabs to view complete tender details

Quantity

16829

Category

Supply and fixing of 19 mm thickness closed cell nitrate rubber

Bid Type

Two Packet Bid

Categories 109

Airports Authority Of India announces a tender for Dismantling and SITC Ducting for Air Conditioning Ventilation Thickness 0. 63 mm sheet, Dismantling and SITC Ducting for Air Conditioning Ventilation Thickness 0. 80 mm sheet, Dismantling and SITC Ducting for Air Conditioning Ventilation Thickness 1. 00 mm sheet, Dismantling and SITC Ducting for Air Conditioning Ventilation Thickness 1. 25 mm sheet, Dismantling of demaged ducts including shifting the same to stores at MLCP including stacking etc, Supply and fixing of 25 mm thickness closed cell nitrate rubber, Supply and fixing of 19 mm thickness closed cell nitrate rubber, Engaging carpenter for opening metal false ceiling tiles in NITB and refixing it properly in position as and when required as per the direction of Engineer-in-Charge, Providing and fixing of 600x600 Knauf Danoline or equivalent Gypsum Board Access Panel with Powder coated Aluminium framing and stiffeners, Supply of scaffolding 3 Sets for 5 to 7 mtr height on Monthly rental basis including steel pipes, couplers, planks, ladders, base plates, bracings and all necessary accessories, as required, Transportation cost for Scaffolding materials to and for Goa Airport site, as required for execution of insulation works at height. , Dismantling of Grills, Dismantling of Diffusers. , Dismantling of Dampers. , Dismantling of Nozzles. , Supply, installation, balancing and commissioning of GI volume control duct damper complete with neoprene rubber gaskets, nuts, bolts, screws linkages, flanges etc. , Supplying, fixing, testing and balancing of powder coated extruded aluminium Supply Air Grilles with alluminium volume control dampers as per approved drawings complete as required, Supplying, fixing, testing and balancing of powder coated extruded aluminium Return exhaust Air Grills with louvers but without volume control dampers as per approved drawings, Supplying, fixing, testing and balancing of Supply Air Diffusers of powder coated aluminium with aluminium volume control dampers with anti smudge ring and removable core as required, Supplying, fixing, testing and balancing of Return Air Diffusers of powder coated aluminium without volume control dampers with anti smudge ring and removable core as required, Supplying, fixing, testing and balancing of powder coated aluminium construction double skin eye ball type jet nozzles with double flap butterfly damper, 400 mm Dia. in SOUTH GOA, GOA. Quantity: 16829. Submission Deadline: 03-11-2025 15: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Dismantling and SITC Ducting for Air Conditioning Ventilation Thickness 0.63 mm sheet , Dismantling and SITC Ducting for Air Conditioning Ventilation Thickness 0.80 mm sheet , Dismantling and SITC Ducting for Air Conditioning Ventilation Thickness 1.00 mm sheet , Dismantling and SITC Ducting for Air Conditioning Ventilation Thickness 1.25 mm sheet , Dismantling of demaged ducts including shifting the same to stores at MLCP including stacking etc , Supply and fixing of 25 mm thickness closed cell nitrate rubber , Supply and fixing of 19 mm thickness closed cell nitrate rubber , Engaging carpenter for opening metal false ceiling tiles in NITB and refixing it properly in position as and when required as per the direction of Engineer-in-Charge , Providing and fixing of 600x600 Knauf Danoline or equivalent Gypsum Board Access Panel with Powder coated Aluminium framing and stiffeners , Supply of scaffolding 3 Sets for 5 to 7 mtr height on Monthly rental basis including steel pipes, couplers, planks, ladders, base plates, bracings and all necessary accessories, as required , Transportation cost for Scaffolding materials to and for Goa Airport site, as required for execution of insulation works at height. , Dismantling of Grills , Dismantling of Diffusers. , Dismantling of Dampers. , Dismantling of Nozzles. , Supply, installation, balancing and commissioning of GI volume control duct damper complete with neoprene rubber gaskets, nuts, bolts, screws linkages, flanges etc. , Supplying, fixing, testing and balancing of powder coated extruded aluminium Supply Air Grilles with alluminium volume control dampers as per approved drawings complete as required , Supplying, fixing, testing and balancing of powder coated extruded aluminium Return exhaust Air Grills with louvers but without volume control dampers as per approved drawings , Supplying, fixing, testing and balancing of Supply Air Diffusers of powder coated aluminium with aluminium volume control dampers with anti smudge ring and removable core as required , Supplying, fixing, testing and balancing of Return Air Diffusers of powder coated aluminium without volume control dampers with anti smudge ring and removable core as required , Supplying, fixing, testing and balancing of powder coated aluminium construction double skin eye ball type jet nozzles with double flap butterfly damper, 400 mm Dia.

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8437454.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 21 Items Sign in for GEM prices

#1

Dismantling and SITC Ducting for Air Conditioning Ventilation Thickness 0.63 mm sheet

Supply, installation, balancing and commissioning of factory fabricated GSS sheet metal rectangular round ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, supports etc. as per SMACNA standard and as per approved drawings and specifications of following sheet thickness complete as required. Horizontal ducts shall be rigidly and securely supported in an approved manner, with trapeze hangers formed of galvanized steel rods and galvanized steel angle channel or a pair of bracket, connected by galvanized steel rod under ducts. Vertical ductwork shall be supported by structural members on each floor slab. Duct supports may be through galvanized steel insert plates left in slab at the time of slab casting. Galvanized steel cleat with a hole for passing the hanger rods shall be welded to the plates. Complete as required as per direction of EIC Thickness 0.63 mm sheet .as per SH I A Item no 1.01 page no 183

400 sqm Delivery: 120 days
#2

Dismantling and SITC Ducting for Air Conditioning Ventilation Thickness 0.80 mm sheet

Supply, installation, balancing and commissioning of factory fabricated GSS sheet metal rectangular round ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, supports etc. as per SMACNA standard and as per approved drawings and specifications of following sheet thickness complete as required. Horizontal ducts shall be rigidly and securely supported in an approved manner, with trapeze hangers formed of galvanized steel rods and galvanized steel angle channel or a pair of bracket, connected by galvanized steel rod under ducts. Vertical ductwork shall be supported by structural members on each floor slab. Duct supports may be through galvanized steel insert plates left in slab at the time of slab casting. Galvanized steel cleat with a hole for passing the hanger rods shall be welded to the plates. Complete as required as per direction of EIC Thickness 0.80 mm sheet .as per SH I A Item no 1.02 page no 183

400 sqm Delivery: 120 days
#3

Dismantling and SITC Ducting for Air Conditioning Ventilation Thickness 1.00 mm sheet

Supply, installation, balancing and commissioning of factory fabricated GSS sheet metal rectangular round ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, supports etc. as per SMACNA standard and as per approved drawings and specifications of following sheet thickness complete as required. Horizontal ducts shall be rigidly and securely supported in an approved manner, with trapeze hangers formed of galvanized steel rods and galvanized steel angle channel or a pair of bracket, connected by galvanized steel rod under ducts. Vertical ductwork shall be supported by structural members on each floor slab. Duct supports may be through galvanized steel insert plates left in slab at the time of slab casting. Galvanized steel cleat with a hole for passing the hanger rods shall be welded to the plates. Complete as required as per direction of EIC Thickness 1.00 mm sheet .as per SH I A Item no 1.03 page no 183

300 sqm Delivery: 120 days
#4

Dismantling and SITC Ducting for Air Conditioning Ventilation Thickness 1.25 mm sheet

Supply, installation, balancing and commissioning of factory fabricated GSS sheet metal rectangular round ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, supports etc. as per SMACNA standard and as per approved drawings and specifications of following sheet thickness complete as required. Horizontal ducts shall be rigidly and securely supported in an approved manner, with trapeze hangers formed of galvanized steel rods and galvanized steel angle channel or a pair of bracket, connected by galvanized steel rod under ducts. Vertical ductwork shall be supported by structural members on each floor slab. Duct supports may be through galvanized steel insert plates left in slab at the time of slab casting. Galvanized steel cleat with a hole for passing the hanger rods shall be welded to the plates. Complete as required as per direction of EIC Thickness 1.25 mm sheet .as per SH I A Item no 1.04 page no 183

10 sqm Delivery: 120 days
#5

Dismantling of demaged ducts including shifting the same to stores at MLCP including stacking etc

Dismantling of demaged ducts including shifting the same to stores at MLCP including stacking etc. complete as required and as per direction of EIC as per SH I B Item no 1 page no 183

200 sqm Delivery: 120 days
#6

Supply and fixing of 25 mm thickness closed cell nitrate rubber

Supply and fixing of 25 mm thickness closed cell nitrate rubber class O insulation provided with UV protected aluminium based cladding factory laminated or site installed by applying suitable cold setting adhesive on already installed exposed outdoor ducting after removal of existing glass wool insulation and cladding. The scope of this item also includes charges for dismantling and suitable disposal of glass wool insulation cladding outside airport premises. as per SH I B Item no 2 page no 183

700 sqm Delivery: 120 days
#2

Supply and fixing of 19 mm thickness closed cell nitrate rubber

Supply and fixing of 19 mm thickness closed cell nitrile rubber class O insulation with factory laminated aluminium foil by applying suitable cold setting adhesive on already installed indoor ducting above false ceiling after removal of existing glass wool insulation. The scope of this item also includes charges for dismantling and suitable disposal of glass wool insulation material outside airport premises. Insulation work to be carried out as per OEM specifications. The same may be considered while quoting. Nothing extra shall be paid on this account.as per SH I B Item no 3 page no 184

6,000 sqm Delivery: 120 days
#3

Engaging carpenter for opening metal false ceiling tiles in NITB and refixing it properly in position as and when required as per the direction of Engineer-in-Charge

Engaging carpenter for opening metal false ceiling tiles in NITB and refixing it properly in position as and when required as per the direction of Engineer-in-Charge as per SH I B Item no 4 page no 184

8,000 job Delivery: 120 days
#4

Providing and fixing of 600x600 Knauf Danoline or equivalent Gypsum Board Access Panel with Powder coated Aluminium framing and stiffeners

Providing and fixing of 600x600 Knauf Danoline or equivalent Gypsum Board Access Panel with Powder coated Aluminium framing and stiffeners, push-catch closing mechanism with door retaining safety cable and hook, concealed locking arrangement Fixing Details Single layer of 12.5 mm tapered edge frame is then screw fixed to ceiling section with 25 mm dry wall screws at 230 mm centres. Screw fixing is done mechanically either with screw driver or drilling machine with suitable attachment. as per SH I B Item no 5 page no 184

25 each Delivery: 120 days
#5

Supply of scaffolding 3 Sets for 5 to 7 mtr height on Monthly rental basis including steel pipes, couplers, planks, ladders, base plates, bracings and all necessary accessories, as required

Supply of scaffolding (3 Sets for 5 to 7 mtr height) on Monthly rental basis including steel pipes, couplers, planks, ladders, base plates, bracings and all necessary accessories, as required for heighted works at Goa Airport site, along with labour for erection and dismantling as per site requirements. The item includes supply of materials in good condition, proper installation and removal at designated locations, and adherence to all safety standards and site conditons. Shifting within the site during the rental period shall also be included as per SH I B Item no 6 page no 184

3 months Delivery: 120 days
#6

Transportation cost for Scaffolding materials to and for Goa Airport site, as required for execution of insulation works at height.

Transportation cost for Scaffolding materials to and for Goa Airport site, as required for execution of insulation works at height. The item includes all labour, vehicles, fuel, loading, unloading, stacking, and associated handling at both ends. as per SH I B Item no 7 page no 185

1 job Delivery: 120 days
#7

Dismantling of Grills

Dismantling of Grills as per SH II Item no 1 page no 185

40 job Delivery: 120 days
#8

Dismantling of Diffusers.

Dismantling of Diffusers as per SH II B Item no 2 page no 185

300 job Delivery: 120 days
#9

Dismantling of Dampers.

Dismantling of Dampers as per SH II B Item no 3 page no 185

20 job Delivery: 120 days
#10

Dismantling of Nozzles.

Dismantling of Nozzles as per SH II B Item no 4 page no 185

100 job Delivery: 120 days
#11

Supply, installation, balancing and commissioning of GI volume control duct damper complete with neoprene rubber gaskets, nuts, bolts, screws linkages, flanges etc.

Supply, installation, balancing and commissioning of GI volume control duct damper complete with neoprene rubber gaskets, nuts, bolts, screws linkages, flanges etc. as per approved drawings complete as required specification as per SH II Item no 5 page no 185

10 sqm Delivery: 120 days
#12

Supplying, fixing, testing and balancing of powder coated extruded aluminium Supply Air Grilles with alluminium volume control dampers as per approved drawings complete as required

Supplying, fixing, testing and balancing of powder coated extruded aluminium Supply Air Grilles with alluminium volume control dampers as per approved drawings complete as required confirming to specification as per SH II Item no 6 page no 185

70 sqm Delivery: 120 days
#13

Supplying, fixing, testing and balancing of powder coated extruded aluminium Return exhaust Air Grills with louvers but without volume control dampers as per approved drawings

Supplying, fixing, testing and balancing of powder coated extruded aluminium Return exhaust Air Grills with louvers but without volume control dampers as per approved drawings complete as required confirming to specification as per SH II Item no 7 page no 185

70 sqm Delivery: 120 days
#14

Supplying, fixing, testing and balancing of Supply Air Diffusers of powder coated aluminium with aluminium volume control dampers with anti smudge ring and removable core as required

Supplying fixing testing and balancing of Supply Air Diffusers of powder coated aluminium with aluminium volume control dampers with anti smudge ring and removable core as per approved drawings complete as required confirming to specification. as per SH II Item no 8 page no 185

70 sqm Delivery: 120 days
#15

Supplying, fixing, testing and balancing of Return Air Diffusers of powder coated aluminium without volume control dampers with anti smudge ring and removable core as required

Supplying fixing testing and balancing of Return Air Diffusers of powder coated aluminium without volume control dampers with anti smudge ring and removable core as required confirming to specification as per SH II Item no 9 page no 185

70 sqm Delivery: 120 days
#16

Supplying, fixing, testing and balancing of powder coated aluminium construction double skin eye ball type jet nozzles with double flap butterfly damper, 400 mm Dia.

Supplying fixing testing and balancing of powder coated aluminium construction double skin eye ball type jet nozzles with double flap butterfly damper mounted on steel face plate suitable for side wall installation of required dia as per approved drawings complete as required confirming to specification 400 mm Dia. as per SH II Item no 10 page no 185

40 each Delivery: 120 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC)

6

Additional Doc 2 (Requested in ATC)

7

Additional Doc 3 (Requested in ATC)

8

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

27-Oct-2025

Extended Deadline

03-Nov-2025, 3:00 pm

Opening Date

03-Nov-2025, 3:30 pm

Technical Results

S.No Seller Item Date Status
1
AIR FLOWANCE SYSTEM   Under PMA
-27-10-2025 16:02:34
2
BATLIBOI LIMITED   Under PMA
-24-10-2025 14:44:04
3
BLOWTECH ENGINEERS PRIVATE LIMITED   Under PMA
-13-10-2025 11:50:06
4
MVAC ENGINEERS   Under PMA
-25-10-2025 12:09:43
5
SUPERTECH ENGINEERS   Under PMA
-27-10-2025 17:40:28
6
THERMOSONICS PRIVATE LIMITED   Under PMA
-27-10-2025 13:08:19

Financial Results

Rank Seller Price Item
L1
MVAC ENGINEERS(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Dismantling and SITC Ducting for Air Conditioning Ventilation Thickness 0.63 mm sheet,Dismantling a
L2
SUPERTECH ENGINEERS (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Dismantling and SITC Ducting for Air Conditioning Ventilation Thickness 0.63 mm sheet,Dismantling a