TenderDekho Logo
Closed GEM

Indian Coast Guard Lithium-Ion Battery Tender for E-Rickshaws Campbell Bay 72V 12V 4AH 200AH 2026

Bid Publish Date

28-Sep-2026, 11:49 am

Bid End Date

01-Oct-2026, 9:00 am

Value

₹1,43,800

Progress

Issue28-Sep-2026, 11:49 am
Technical10-Jan-2026, 3:20 am
Financial
AwardCompleted

Tender Overview

  • Organization: Indian Coast Guard under the Department of Defence. - Product: 72V Lithium-Ion Rechargeable Batteries for E-Rickshaws; specific items include LUP make BEL batteries: 12V 4Ah, Part No Z9/6140-00 (qty 2); and 12V 200Ah maintenance-free batteries (qty 2). - Location: Campbell Bay, 744302, India. - Estimated Value: ₹143,800. - Scope: Supply, Installation, Testing and Commissioning of the batteries with integration to existing LUP/DA system; delivery to Campbell Bay. - Delivery/Option: 25% quantity flex via option clause; delivery period adjustments based on original period with minimum 30 days. - Key Differentiator: Explicit integration with existing LUP and DA systems; mandatory onsite undertaking. - Context: Buyer emphasizes on-site installation, OEM warranty, and service network in India.

Technical Specifications & Requirements

  • Battery types: LUP MAKE BEL 12V 4Ah (Part No Z9/6140-00), qty 2; 12V 200Ah maintenance-free, qty 2. - Delivery location: Campbell Bay 744302. - Integration: Vendor must prove integration with existing LUP and DA system. - Warranty: 1 year from final acceptance or post-installation completion; OEM warranty certificates required at delivery. - ATS/ATC: Must upload relevant certificates; adherence to ATC terms. - Support: Installation, commissioning, training, troubleshooting, and maintenance service capability in India; list service centers near consignee locations. - Documentation: Mandatory Undertaking; proof of integration and OEM support.

Terms, Conditions & Eligibility

  • EMD/Funding: Not specified in the data; bids must reflect standard terms. - Delivery: Period begins after original delivery order; option quantity may extend delivery time with minimum 30 days. - Scope: Bid price includes supply, installation, testing and commissioning. - Warranty: 1 year warranty; OEM certificates to be submitted at delivery. - Compliance: Upload all required certificates and documents as per ATC; non-compliance leads to rejection. - Support: Well-established after-sales network in India; provide service centers near consignee destinations. - Acceptance: Final acceptance after testing; undertake integration proof for DA/LUP system. - Procurement context: Government procurement with mandatory onsite undertaking and integration verification.

Key Specifications

  • 72V Li-ion battery system for E-Rickshaws

  • LUP MAKE BEL, 12V 4Ah, Part No Z9/6140-00, quantity 2

  • 12V 200Ah maintenance-free battery, quantity 2

  • Delivery to Campbell Bay 744302

  • 1-year OEM warranty from final acceptance

  • Must prove integration with existing LUP and DA system

  • Installation, Commissioning, Training, Troubleshooting, and Maintenance required

  • Upload OEM certificates and service centers in India

Terms & Conditions

  • Option clause allows ±25% quantity variation at placement and during contract currency

  • Scope includes Supply, Installation, Testing and Commissioning

  • Onsite undertaking mandatory; integration proof required

Important Clauses

Payment Terms

Not explicitly provided; standard government terms with OEM warranty certificates required at delivery

Delivery Schedule

Delivery period starts from last date of original delivery order; option quantity may extend time; minimum 30 days additional delivery period

Penalties/Liquidated Damages

Not detailed; standard discipline for delayed delivery in government tenders

Bidder Eligibility

  • Experience in supplying similar battery systems or EV powerpack assemblies

  • Demonstrated installation and commissioning capability in India

  • OEM authorization for LUP/DA system compatibility

Advertisement

Authority & Contact

Organization

Indian Coast Guard

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Technical Results

S.No Seller Item Date Status
1
100KEYS TRADECOM PRIVATE LIMITED   Under PMA
Make : NA Model : BATTERY 25.9V 5.5AH (Battery Secondary Portable)01-10-2026 08:50:36
2
Navisphere Marine Services & Offshore Supplies   Under PMA
Make : NA Model : BATTERY 25.9V 5.5AH (Battery Secondary Portable)30-09-2026 17:44:17
3
RD ENTERPRISE   Under PMA
Make : NA Model : BATTERY 25.9V 5.5AH (Battery Secondary Portable)30-09-2026 21:49:04
4
RJ ENTERPRISES   Under PMA
Make : NA Model : BATTERY 25.9V 5.5AH (Battery Secondary Portable)30-09-2026 16:47:35
5
SHAFT ENERGIES PRIVATE LIMITED   Under PMA
Make : NA Model : BATTERY 25.9V 5.5AH (Battery Secondary Portable)30-09-2026 15:44:25

Financial Results

Rank Seller Price Item
L1
Navisphere Marine Services & Offshore Supplies   Under PMA
Item Categories : 72V - Lithium-Ion Rechargeable Batteries for E-Rickshaws (V2),72V - Lithium-Ion Rechargeable Batter
L2
RJ ENTERPRISES   Under PMA
Item Categories : 72V - Lithium-Ion Rechargeable Batteries for E-Rickshaws (V2),72V - Lithium-Ion Rechargeable Batter
L3
RD ENTERPRISE   Under PMA
Item Categories : 72V - Lithium-Ion Rechargeable Batteries for E-Rickshaws (V2),72V - Lithium-Ion Rechargeable Batter

Tender Data

Bid Details

Quantity

4

Category

72V - Lithium-Ion Rechargeable Batteries for E-Rickshaws (V2)

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Warranty Period

1 years

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

72V - Lithium-Ion Rechargeable Batteries for E-Rickshaws (V2) (Q3)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

South Andaman

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-South AndamanSouth Andaman--215-

Authority Records

MINISTRY OF DEFENCEDEFENCE DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

GeM-Bidding-9954055.pdf

Main Document

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Categories 2

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar battery/EV powertrain projects

4

Financial statements

5

EMD documents (if applicable) and security deposit proof

6

Technical compliance certificates

7

OEM authorization/arrangements for LUP/DA system compatibility

8

Undertaking for integration with existing LUP/DA system

9

Warranty certificates from OEM

10

Service center details near consignee locations

Frequently Asked Questions

Key insights about ANDAMAN & NICOBAR tender market

How to bid for the 72V lithium battery tender in Campbell Bay?

Bidders must submit GST, PAN, experience proofs, financials, and OEM authorizations, plus an Undertaking for integration with the LUP/DA system. Ensure 1-year OEM warranty certificates are included and service-center details in India. Delivery terms follow the original delivery date with possible 25% quantity variation.

What documents are required for the Campbell Bay battery procurement in 2026?

Submit GST certificate, PAN card, experience certificates for similar projects, financial statements, EMD documentation, technical compliance certificates, OEM authorizations, and OEM warranty certificates. Include an Undertaking confirming integration with LUP and DA systems and service-center details.

What are the technical specs for the 12V batteries in this tender?

Two 12V 4Ah batteries (Part No Z9/6140-00) and two 12V 200Ah maintenance-free batteries are required. Deliveries must prove integration with existing LUP and DA systems; warranty is 1 year from final acceptance; ensure OEM certificates accompany delivery.

When is delivery expected after order for Campbell Bay batteries?

Delivery period starts from the last date of the original delivery order; option quantity can extend time; minimum additional delivery time is 30 days. Ensure installation and commissioning are completed per scope within extended timeline.

What is the warranty requirement for the battery supply in this bid?

Warranty is 1 year from final acceptance or post-installation testing; OEM warranty certificates must be submitted at delivery; supplier must rectify breakdowns during the warranty period.

What is required to prove integration with LUP and DA systems?

An Undertaking for integration must be submitted; the supplier must demonstrate compatibility of the LUP BEL battery set with the DA system through documentation and testing results at delivery.

Advertisement