Bid Publish Date
29-Aug-2026, 4:50 pm
Bid End Date
05-Sep-2026, 5:00 pm
Location
Progress
The opportunity is issued by the Indian Army under the Department Of Military Affairs for the procurement of Safety Matches in Boxes (V2) conforming to IS 2653 (Q4). Tender scope references match type, number of matches per box, and number of match boxes per bundle, with the estimated value and quantities not disclosed. The tender allows up to a 50% variation in ordered quantity, with contracted rates unchanged, and specifies delivery timelines linked to the original delivery period. Location details are not disclosed in the provided data, creating a need to verify site-specific delivery requirements during bid preparation. A unique differentiator is the explicit option clause governing quantity fluctuations and extension logic, which bidders must model into their supply plans.
Product: Safety matches in boxes (V2)
Standard: IS 2653 (Q4)
Specifications: match type, number of match sticks per box, number of match boxes per bundle
Quality/Certification: IS 2653 (Q4) compliance; ensure packaging labels are compliant with government procurement norms
Delivery: option to increase quantity up to 50%; delivery period depends on original terms with minimum 30 days
Quantity adjustment right up to 50% during/after contract
Delivery period linked to original delivery schedule with minimum 30 days
Strict non-sub-contracting and non-assignment without buyer consent
Demurrage charges of 0.5% per day after 48 hours for non-lifted items
No explicit payment terms provided in data; bidder must review ATC for exact payment milestones and schedule
Delivery must commence from the last date of the original delivery order; option clause may extend delivery period with calculated time formula
Demurrage at 0.5% of total contract value per day for non-lifted items beyond 48 hours
Must meet IS 2653 (Q4) compliance for safety matches in boxes
Ability to scale quantity up to 50% during contract without rate changes
Compliance with assignment/sub-contracting restrictions and joint liability
Must upload all mandatory certificates/documents to avoid rejection
Quantity
4100
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Safety Matches in Boxes (V2) Conforming to IS 2653 (Q4)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Meerut
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Meerut | Meerut | - | - | 4100 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar safety matches supply
Financial statements showing turnover (where requested in ATC)
EMD/Security deposit documentation as specified
Technical bid documents and conformity certificates for IS 2653 (Q4)
OEM authorizations or supplier certifications relevant to matches packaging
Any additional certificates required by ATC/Corrigendum
| Category | Specification | Requirement |
|---|---|---|
| Generic | Match Type | Wood Match, Wax Match |
| Generic | Number of match sticks in each box | ≥20≤30, >30≤40, >40≤50, 100, 200 |
| Generic | Number of match boxes in a Bundle | 5, 10, 40 |
Bidders must comply with IS 2653 (Q4) standards, upload mandatory documents (GST, PAN, experience certificates, financials), and ensure OEM authorizations where required. The tender allows a 50% quantity variation with fixed rates. Prepare to meet delivery timelines and demurrage penalties for delayed liftings.
Required documents include GST certificate, PAN, experience certificates for similar supplies, financial statements, EMD documentation, technical conformity certificates, and OEM authorizations. Ensure all certificates are uploaded to avoid rejection per ATC and Corrigendum terms.
Delivery period follows the original delivery order; if the buyer exercises the option to increase quantity, the extended time uses the formula: (additional quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.
Demurrage applies at 0.5% of total contract value per day for rejected items not lifted within 48 hours. This creates a strong incentive to ensure timely delivery and prompt replacement of defective items.
Bidders must supply matches conforming to IS 2653 (Q4). Ensure packaging, labeling, and safety classifications align with IS standards and government procurement requirements.
Sub-contracting requires prior written consent from the buyer; ultimate responsibility remains with the main seller, with joint liability for performance per contract terms.
Confirm IS 2653 (Q4) compliance, supply capability for scalable quantities, and readiness to provide mandatory bid documents (GST, PAN, certificates, OEM authorizations) as per ATC.
The purchaser may increase ordered quantity up to 50% during the contract, with extended delivery time calculated per the specified formula, ensuring delivery timelines are met without changing contracted rates.