TenderDekho Logo
GEM

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Fabrication Erection Tender Lucknow UP 2025

Bid Publish Date

10-Dec-2025, 1:15 pm

Bid End Date

02-Jan-2026, 1:00 pm

Value

₹3,79,072

Generate Docs

Progress

Issue10-Dec-2025, 1:15 pm
Technical26-12-2025 12:21:29
Financial
Award11-Apr-2026, 3:51 pm
Explore all 4 tabs to view complete tender details

Quantity

22

Category

Fabrication and Erection of Conical portion at Ash collecting Tower

Bid Type

Two Packet Bid

Categories 15

Tender Overview

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL), Lucknow, invites bids for multiple fabrication and erection tasks across power plant infrastructure, including conical portion fabrication at the ash collecting tower, tail pipe fabrication at the ash collecting tower, MS plate barricading at the ECO hopper, and strengthening work on ECO platforms in units 9 and 10. Estimated value is ₹379,072.00, with potential quantity variations up to 25% per contract terms. Deliverables span interconnection of vacuum lines between units, pipe erection from AWRS sump pit to ash dam, and structural supports. The scope emphasizes on-site fabrication, erection, and associated civil/mechanical work at the plant site. The purchaser reserves option-based quantity adjustments, affecting delivery timelines. No explicit delivery schedule is provided in the data, requiring bidders to assume site-based scheduling aligned with order placement. The ATC and BOQ items indicate a technical, multi-task scope requiring robust coordination across mechanical, structural, and civil trades.

Key Specifications

    • Fabrication and erection of conical portions at ash collecting tower
    • Fabrication of tail pipe at ash collecting tower
    • MS plate barricading at ECO hopper (Unit 11)
    • Strengthening work of ECO platform (Unit 9 & 10)
    • Interconnection of vacuum line between Unit 11 and Unit 10
    • Strengthening of seal box of 9B by channel/beam support
    • Erection of 6 inch or 8 inch MS pipe from AWRS intermediate sump pit to Ash Dam

Terms & Conditions

  • Option clause allows ±25% quantity variation with corresponding delivery adjustments

  • Delivery period determined by last date of original DO; extended period rules apply

  • EMD and exact payment terms not disclosed in provided data; verify with ATC

Important Clauses

Delivery Schedule

Delivery period starts from last date of original delivery order; extension formula applies with minimum 30 days

Payment Terms

Details to be provided in ATC; bidders to review tender terms for milestone payments and security deposits

Penalties/Liquidated Damages

Not specified in available data; ATC may contain LD provisions; bidders should verify

Bidder Eligibility

  • Experience in fabrication/erection of power plant components

  • GST registration and PAN validity

  • Financial stability demonstrated by last 2-3 years financial statements

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Fabrication and Erection of Conical portion at Ash collecting Tower , Fabrication of Tail pipe installed at Ash collecting Tower , Barricading work by MS plate at ECO hopper at Unit 11 and strengthening work of ECO Platform in unit 9 and 10. , Interconnection of vacuum line of Unit 11 to Unit 10 , Strengthening of Seal box of 9B by channel and beam support at ash collecting tower unit 9. , Erection of 6 inch or 8 inch M.S. pipe from AWRS intermediate sump pit to Ash Dam

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8694048.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

Fabrication and Erection of Conical portion at Ash collecting Tower

Fabrication and Erection of Conical portion at Ash collecting Tower

6 no Delivery: 90 days
#2

Fabrication of Tail pipe installed at Ash collecting Tower

Fabrication of Tail pipe installed at Ash collecting Tower

12 no Delivery: 90 days
#3

Barricading work by MS plate at ECO hopper at Unit 11 and strengthening work of ECO Platform in unit 9 and 10.

Barricading work by MS plate at ECO hopper at Unit 11 and strengthening work of ECO Platform in unit 9 and 10.

1 job Delivery: 90 days
#4

Interconnection of vacuum line of Unit 11 to Unit 10

Interconnection of vacuum line of Unit 11 to Unit 10

1 job Delivery: 90 days
#5

Strengthening of Seal box of 9B by channel and beam support at ash collecting tower unit 9.

Strengthening of Seal box of 9B by channel and beam support at ash collecting tower unit 9.

1 job Delivery: 90 days
#6

Erection of 6 inch or 8 inch M.S. pipe from AWRS intermediate sump pit to Ash Dam

Erection of 6 inch or 8 inch M.S. pipe from AWRS intermediate sump pit to Ash Dam

1 job Delivery: 90 days

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar projects

4

Financial statements (last 2-3 years)

5

Technical bid documents and methodology

6

OEM authorization letters (if applicable)

7

EMD submission proof (if required by ATC)

8

Any other documents specified in Buyer Added Terms/ATC

Corrigendum Updates

1 Update
#1

Update

26-Dec-2025

Extended Deadline

02-Jan-2026, 1:00 pm

Opening Date

02-Jan-2026, 1:30 pm

Technical Results

S.No Seller Item Date Status
1
AGGARWAL TRADING CO.   Under PMA
-26-12-2025 12:21:29
2
INDIA ENGG WORKS   Under PMA
-02-01-2026 11:55:05
3
M/S R.P. CONSTRUCTION WORKS   Under PMA
-31-12-2025 19:11:36
4
M/S SUDAMA-SINGH.   Under PMA
-01-01-2026 16:00:34

Financial Results

Rank Seller Price Item
L1
M/S R.P. CONSTRUCTION WORKS   Under PMA
Item Categories : Fabrication and Erection of Conical portion at Ash collecting Tower,Fabrication of Tail pipe instal
L2
INDIA ENGG WORKS( MSE Social Category:General )    Under PMA
Item Categories : Fabrication and Erection of Conical portion at Ash collecting Tower,Fabrication of Tail pipe instal
L3
M/S SUDAMA-SINGH.   Under PMA
Item Categories : Fabrication and Erection of Conical portion at Ash collecting Tower,Fabrication of Tail pipe instal

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What are eligibility criteria for UP power fabrication tender in Lucknow?

Bidders must provide GST and PAN, evidence of prior similar fabrication/erection experience, and financial statements for the past 2-3 years. OEM authorizations may be required for specific components. Review ATC for any minimum turnover and qualification benchmarks, then prepare technical and financial bids accordingly.

How to participate in uprvunl fabrication and erection tender in Lucknow?

Register as a bidder with the procuring entity, obtain the ATC documents, prepare technical and financial bids, submit EMD if mandated, and ensure compliance with option clause terms. Ensure on-site capabilities for ash tower fabrication, MS piping, and ECO platform work before submission.

What documents are required for UP RUVNL tender submission 2025?

Submit GST certificate, PAN card, company registration, experience certificates for recent similar works, financial statements, OEM authorizations if necessary, technical bid detailing method and schedule, and EMD proof (if required by ATC). Cross-check the ATC for any additional documents.

What are the technical specifications for conical portion fabrication in this tender?

Specific conical portion geometry is not detailed in the data; bidders must rely on ATC for drawings, material specifications, welding standards, and testing procedures. Prepare fabrication plans compatible with on-site ash tower integration and vacuum-line interconnections between units 10 and 11.

What is the EMD amount for uprvunl fabrication tender in Lucknow?

EMD amount is not disclosed in the provided tender data. Bidders should check the ATC document or contact the procurement office to obtain exact EMD requirements, submission mode, and validity period before bidding.

When is the delivery window and option clause applicable for quantities?

Delivery period starts from the last date of the original delivery order. The purchaser may increase or decrease quantity by up to 25% during contract, with extended delivery time calculated as (additional/original) × original period, minimum 30 days.

What are the payment terms and milestones for this UP tender?

Detailed payment terms are not provided in the data. The ATC is the authoritative source; bidders should verify milestone payments, security deposits, and any advance payment conditions before bid submission.

What standards or certifications are required for this UP power project tender?

Specific standards are not listed in the data. Bidders should obtain IS/BS/ISO certifications as applicable per ATC and ensure compliance with project-specific welding, material, and safety requirements for ash tower fabrication and piping.