Bid Publish Date
29-Oct-2026, 4:29 pm
Bid End Date
16-Nov-2026, 1:00 pm
Value
₹9,98,120
Location
Progress
Public procurement opportunity for Mvvnl Title1, Title2, Title3, Title4, Title5, Title6, Title7, Title8, Title9, Title10, Title11, Title12, Title13, Title14, Title15, Title16, Title17, Title18, Title19, Title20, Title21, Title22, Title23, Title24, Title25, Title26, Title27, Title28, Title29, Title30, Title31, Title32, Title33, Title34, Title35, Title36, Title37, Title38, Title39, Title40, Title41, Title42, Title43, Title44 in KHERI, UTTAR PRADESH. Quantity: 3685 issued by. Submission Deadline: 16-11-2026 13: 00: 00. View full details and respond.
Quantity
3685
Category
Title1
Bid Type
Two Packet Bid
Bid Validity
95 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
60 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Title1 , Title2 , Title3 , Title4 , Title5 , Title6 , Title7 , Title8 , Title9 , Title10 , Title11 , Title12 , Title13 , Title14 , Title15 , Title16 , Title17 , Title18 , Title19 , Title20 , Title21 , Title22 , Title23 , Title24 , Title25 , Title26 , Title27 , Title28 , Title29 , Title30 , Title31 , Title32 , Title33 , Title34 , Title35 , Title36 , Title37 , Title38 , Title39 , Title40 , Title41 , Title42 , Title43 , Title44
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Kheri
Delivery Pincodes
262701
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Shailendra Kumar | 262701,Office of the Superintending Engineer, Electricity Distribution Circle Near Punjabi Colony Gate Rajghar, Lakhimpur Kheri 262701 | Kheri | Uttar Pradesh | 262701 | 10 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
16-Nov-2026, 7:30 am
Opening Date
17-Nov-2026, 7:30 am
Extended Deadline
12-Nov-2026, 7:30 am
Opening Date
13-Nov-2026, 7:30 am
Title1
(A) Line Material.
Title2
(B) PCC pole 8.5/9/11 Mtr long
Title3
(C) STP Pole 9/11 Mtr. long.
Title4
(D)- T/F 10/16/25/63/100 KVA
Title5
(F)ACSR Rabit/Dog /Racoon/weasel/ conductor
Title6
(G)ABC( 3x120/95/70/25/16) Sqmm.
Title7
(H)11 KV XLPE Cable (3x35/70/120/185/240)
Title8
(I) 11kv pilfer resistant metering cubical
Title9
(J) 33kv pilfer resistant metering cubical
Title10
(K)11 KV Pole mounted CT/PT
Title11
(L)DP Box 3 Phase
Title12
Fabrication, erection of sub-station type double pole on 8.5 mtr long PCC/11 mtr. Long ST pole along with fixing of necessary hardware of doble pole alongwith necessery pin insulators as per RESPO specification and direction of E/I.
Title13
Dragging of ST/PCC pole to pit site, digging of pit erection and grouting (As per RESPO norms) of 11KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification.
Title14
Dragging of ST/PCC Pole from dump store to pit site, digging of pit erection & grouting (As per RESPO norms) of LT support suitable for laying of ABC line on 8.5mtr long PCC pole by providing of necessary eye hook/LT shackle insulator with clamps and its accessories etc. as per RESPO specification. Only Pole will be provided by the department.
Title15
Fabrication, erection T-Off pole single section pole along with T-Off channel clamp disc fitting & pin accessories, grouting in 1 4 8 cement sand and brick ballast as per RESPO specification.
Title16
Providing and fixing of 11 KV DO fuse set along with clamps & nut bolts on existing of double pole.
Title17
Fixing of 11 KV TPMO along with clamps & nut bolts on existing of double pole.
Title18
Ordinary earthing by MS earth Rod 2500mm long as per RESPO Schedule. Only GI wire& Earth rod shall be supplied by the department.
Title19
Grouting and Nuzzling of stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand brick ballast cement). Only stay rod and Stay wire shall be supplied by the Department.
Title20
Laying and sagging of 3 phase 3 wire 11 KV line on ACSR weasel/rabbit/Raccoon/Dog conductor as per RESPO specification and direction of E/I.
Title21
Providing and fixing of guarding angle on existing 11 KV support with clamp and nut bolts.
Title22
Cradle guarding of HT line by GI wire. GI wire shall be supplied by the department.
Title23
Erection & commissioning of (3x120/95/70/25/16 Sq.mm) Aerial Bunched Conductor.
Title24
Laying of cable 11 KV XLPE cable (3x35/70/120/185/240) sqmm in pakka road by boring method laying cable as per RESPO specification & direction of E/I.
Title25
Laying of cable 11 KV Through piping .
Title26
Hoisting of 11 KV XLPE Cable will be passed through MS pipe of required size duly clamped with pole at the bottom, middle and top of the pole.
Title27
Supply and fixing of 11 KV Cable joining kit O/D and I/D.
Title28
Installation of 11 KV CT/PT on double pole connected with metering unit along with providing and fixing of all accessories such as S/S base, MS flat, clamps, nut and bolts its jumpering and commissioning.
Title29
Dragging of 11 KV Pilfer metering cubical inside the metering room, its installation and commissioning.
Title30
Dragging of 33 KV Pilfer metering cubical inside the metering room, its installation and commissioning.
Title31
Fixing of 3 phase distribution box/kiosk on the LT poles including all clamps and material required for mounting connections and sealing.
Title32
Making section of 11 KV line by fixing of All necessaries accessories such as T-Off channel disc insulator with fitting pin insulator with pin along with sagging jumpering and binding etc only insulator shall be provided by the dept.
Title33
Cutting and chopping of tree branches for clearance of HT/LT Line. After clearance line throughout pieces of tree branches of site.
Title34
Safe installation & energisation of 10/16/25/63/100 KVA T/F on double pole by providing and fixing of L-piece, Lugs making HT/LT connections and its commissioning. Only Transformer shall be supplied by the deppt.
Title35
Supply of top Droper T-off clamp
Title36
Fabrication T-Off Top Droper S/s Base Grouting Engal crass arm.
Title37
Supply of Net-Bolt i-type
Title38
Supply of 10/16 kva T/F Holding Clamp
Title39
Supply of LT Clamp for PCC/ST Pole
Title40
Supply of Holding Clamp for PCC/ST Pole
Title41
Supply of F-Clamp
Title42
Supply of Stay Clamp
Title43
Supply of Loop Insulator 11 kv
Title44
Supply of LT shackle Insulator
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Title1 | (A) Line Material. | 10 | qtl | con3.mvvnl.up | 180 | |
| 2 | Title2 | (B) PCC pole 8.5/9/11 Mtr long | 25 | nos | con3.mvvnl.up | 180 | |
| 3 | Title3 | (C) STP Pole 9/11 Mtr. long. | 6 | nos | con3.mvvnl.up | 180 | |
| 4 | Title4 | (D)- T/F 10/16/25/63/100 KVA | 8 | nos | con3.mvvnl.up | 180 | |
| 5 | Title5 | (F)ACSR Rabit/Dog /Racoon/weasel/ conductor | 2,500 | mtr | con3.mvvnl.up | 180 | |
| 6 | Title6 | (G)ABC( 3x120/95/70/25/16) Sqmm. | 130 | mtr | con3.mvvnl.up | 180 | |
| 7 | Title7 | (H)11 KV XLPE Cable (3x35/70/120/185/240) | 130 | mtr | con3.mvvnl.up | 180 | |
| 8 | Title8 | (I) 11kv pilfer resistant metering cubical | 1 | nos | con3.mvvnl.up | 180 | |
| 9 | Title9 | (J) 33kv pilfer resistant metering cubical | 2 | nos | con3.mvvnl.up | 180 | |
| 10 | Title10 | (K)11 KV Pole mounted CT/PT | 1 | nos | con3.mvvnl.up | 180 | |
| 11 | Title11 | (L)DP Box 3 Phase | 2 | nos | con3.mvvnl.up | 180 | |
| 12 | Title12 | Fabrication, erection of sub-station type double pole on 8.5 mtr long PCC/11 mtr. Long ST pole along with fixing of necessary hardware of doble pole alongwith necessery pin insulators as per RESPO specification and direction of E/I. | 6 | nos | con3.mvvnl.up | 180 | |
| 13 | Title13 | Dragging of ST/PCC pole to pit site, digging of pit erection and grouting (As per RESPO norms) of 11KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification. | 6 | nos | con3.mvvnl.up | 180 | |
| 14 | Title14 | Dragging of ST/PCC Pole from dump store to pit site, digging of pit erection & grouting (As per RESPO norms) of LT support suitable for laying of ABC line on 8.5mtr long PCC pole by providing of necessary eye hook/LT shackle insulator with clamps and its accessories etc. as per RESPO specification. Only Pole will be provided by the department. | 10 | nos | con3.mvvnl.up | 180 | |
| 15 | Title15 | Fabrication, erection T-Off pole single section pole along with T-Off channel clamp disc fitting & pin accessories, grouting in 1 4 8 cement sand and brick ballast as per RESPO specification. | 8 | nos | con3.mvvnl.up | 180 | |
| 16 | Title16 | Providing and fixing of 11 KV DO fuse set along with clamps & nut bolts on existing of double pole. | 1 | nos | con3.mvvnl.up | 180 | |
| 17 | Title17 | Fixing of 11 KV TPMO along with clamps & nut bolts on existing of double pole. | 1 | nos | con3.mvvnl.up | 180 | |
| 18 | Title18 | Ordinary earthing by MS earth Rod 2500mm long as per RESPO Schedule. Only GI wire& Earth rod shall be supplied by the department. | 14 | nos | con3.mvvnl.up | 180 | |
| 19 | Title19 | Grouting and Nuzzling of stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand brick ballast cement). Only stay rod and Stay wire shall be supplied by the Department. | 22 | nos | con3.mvvnl.up | 180 | |
| 20 | Title20 | Laying and sagging of 3 phase 3 wire 11 KV line on ACSR weasel/rabbit/Raccoon/Dog conductor as per RESPO specification and direction of E/I. | 4 | ckt km | con3.mvvnl.up | 180 | |
| 21 | Title21 | Providing and fixing of guarding angle on existing 11 KV support with clamp and nut bolts. | 8 | nos | con3.mvvnl.up | 180 | |
| 22 | Title22 | Cradle guarding of HT line by GI wire. GI wire shall be supplied by the department. | 1 | span | con3.mvvnl.up | 180 | |
| 23 | Title23 | Erection & commissioning of (3x120/95/70/25/16 Sq.mm) Aerial Bunched Conductor. | 4 | km | con3.mvvnl.up | 180 | |
| 24 | Title24 | Laying of cable 11 KV XLPE cable (3x35/70/120/185/240) sqmm in pakka road by boring method laying cable as per RESPO specification & direction of E/I. | 5 | mtr | con3.mvvnl.up | 180 | |
| 25 | Title25 | Laying of cable 11 KV Through piping . | 1 | mtr | con3.mvvnl.up | 180 | |
| 26 | Title26 | Hoisting of 11 KV XLPE Cable will be passed through MS pipe of required size duly clamped with pole at the bottom, middle and top of the pole. | 8 | nos | con3.mvvnl.up | 180 | |
| 27 | Title27 | Supply and fixing of 11 KV Cable joining kit O/D and I/D. | 6 | nos | con3.mvvnl.up | 180 | |
| 28 | Title28 | Installation of 11 KV CT/PT on double pole connected with metering unit along with providing and fixing of all accessories such as S/S base, MS flat, clamps, nut and bolts its jumpering and commissioning. | 1 | nos | con3.mvvnl.up | 180 | |
| 29 | Title29 | Dragging of 11 KV Pilfer metering cubical inside the metering room, its installation and commissioning. | 5 | job | con3.mvvnl.up | 180 | |
| 30 | Title30 | Dragging of 33 KV Pilfer metering cubical inside the metering room, its installation and commissioning. | 4 | job | con3.mvvnl.up | 180 | |
| 31 | Title31 | Fixing of 3 phase distribution box/kiosk on the LT poles including all clamps and material required for mounting connections and sealing. | 5 | nos | con3.mvvnl.up | 180 | |
| 32 | Title32 | Making section of 11 KV line by fixing of All necessaries accessories such as T-Off channel disc insulator with fitting pin insulator with pin along with sagging jumpering and binding etc only insulator shall be provided by the dept. | 6 | job | con3.mvvnl.up | 180 | |
| 33 | Title33 | Cutting and chopping of tree branches for clearance of HT/LT Line. After clearance line throughout pieces of tree branches of site. | 350 | nos | con3.mvvnl.up | 180 | |
| 34 | Title34 | Safe installation & energisation of 10/16/25/63/100 KVA T/F on double pole by providing and fixing of L-piece, Lugs making HT/LT connections and its commissioning. Only Transformer shall be supplied by the deppt. | 8 | nos | con3.mvvnl.up | 180 | |
| 35 | Title35 | Supply of top Droper T-off clamp | 6 | nos | con3.mvvnl.up | 180 | |
| 36 | Title36 | Fabrication T-Off Top Droper S/s Base Grouting Engal crass arm. | 100 | nos | con3.mvvnl.up | 180 | |
| 37 | Title37 | Supply of Net-Bolt i-type | 100 | kg | con3.mvvnl.up | 180 | |
| 38 | Title38 | Supply of 10/16 kva T/F Holding Clamp | 10 | nos | con3.mvvnl.up | 180 | |
| 39 | Title39 | Supply of LT Clamp for PCC/ST Pole | 10 | nos | con3.mvvnl.up | 180 | |
| 40 | Title40 | Supply of Holding Clamp for PCC/ST Pole | 30 | nos | con3.mvvnl.up | 180 | |
| 41 | Title41 | Supply of F-Clamp | 30 | nos | con3.mvvnl.up | 180 | |
| 42 | Title42 | Supply of Stay Clamp | 30 | nos | con3.mvvnl.up | 180 | |
| 43 | Title43 | Supply of Loop Insulator 11 kv | 30 | nos | con3.mvvnl.up | 180 | |
| 44 | Title44 | Supply of LT shackle Insulator | 40 | nos | con3.mvvnl.up | 180 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer