TenderDekho Logo
Closed GEM

Procurement Opportunity: Enterprise L2plus Managed Switch,Wi-Fi 6 Indoor AP,Armoured OFC,Unarmoured OFC,OFC Duct,SFP Module, in RAIPUR, CHHATTISGARH

Bid Publish Date

06-Jan-2026, 1:15 pm

Bid End Date

31-Jan-2026, 2:00 pm

EMD

₹1,00,000

Value

₹50,00,000

Generate Docs

Progress

Issue06-Jan-2026, 1:15 pm
Corrigendum24-Jan-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

19556

Category

Enterprise L2plus Managed Switch

Bid Type

Two Packet Bid

Categories 72

A tender has been published for National Institute Of Technology (nit) Enterprise L2plus Managed Switch, Wi-Fi 6 Indoor AP, Armoured OFC, Unarmoured OFC, OFC Duct, SFP Module, LIU, OFC Patch Cord, Cat 6 UTP Cable, Cat 6 Patch Cord, Network Rack, PVC Conduit, Patch Panel, IO with Faceplate, Root Marker, UPS System, Networking Work, Electrical Work, Misc Service, Support and Maintenance for 3 years in RAIPUR, CHHATTISGARH. Quantity: 19556 by. Submission Deadline: 31-01-2026 14: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Enterprise L2plus Managed Switch , Wi-Fi 6 Indoor AP , Armoured OFC , Unarmoured OFC , OFC Duct , SFP Module , LIU , OFC Patch Cord , Cat 6 UTP Cable , Cat 6 Patch Cord , Network Rack , PVC Conduit , Patch Panel , IO with Faceplate , Root Marker , UPS System , Networking Work , Electrical Work , Misc Service , Support and Maintenance for 3 years

Authority Records

MINISTRY OF EDUCATIONHIGHER EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8789359.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 21 Items Sign in for GEM prices

#1

Enterprise L2plus Managed Switch

24 Gigabit ports, 4X SFPplus uplinks, PoEpluse, 370W budget

9 nos Delivery: 45 days
#2

Wi-Fi 6 Indoor AP

Dual-band Wi-Fi 6 AP, MU-MIMO

72 nos Delivery: 45 days
#3

Armoured OFC

6-core outdoor armoured cable

250 m Delivery: 45 days
#4

Unarmoured OFC

6-core indoor cable

120 m Delivery: 45 days
#5

OFC Duct

32mm duct for cable

250 m Delivery: 45 days
#6

SFP Module

Compatible Gigabit SFP modules

18 nos Delivery: 45 days
#7

LIU

12 Port LIU loaded with pigtail

9 nos Delivery: 45 days
#8

OFC Patch Cord

Factory terminated patch cords

9 nos Delivery: 45 days
#9

Cat 6 UTP Cable

Structured cabling

10,800 m Delivery: 45 days
#10

Cat 6 Patch Cord

0.5 m patch cord

216 nos Delivery: 45 days
#11

Cat 6 Patch Cord

2 m patch cord

72 nos Delivery: 45 days
#12

Network Rack

9U rack with accessories

9 nos Delivery: 45 days
#13

PVC Conduit

25 mm conduit for cable

7,560 m Delivery: 45 days
#14

Patch Panel

24-port Cat 6 patch panel loaded

9 nos Delivery: 45 days
#15

IO with Faceplate

IO module and faceplate and backbox

144 nos Delivery: 45 days
#16

Root Marker

Cable route marker

4 nos Delivery: 45 days
#17

UPS System

3 kVA Online UPS with 1-hour battery backup on UPS

1 set Delivery: 45 days
#18

Networking Work

OFC laying, trenching, UTP cable laying, switch & AP installation, configuration & commissioning

1 lot Delivery: 45 days
#19

Electrical Work

Electrical wiring for racks, power sockets, terminations, MCBs, surge protection

1 lot Delivery: 45 days
#20

Misc Service

Misc services required during the project

1 lot Delivery: 45 days
#21

Support and Maintenance for 3 years

Includes spare replacement, configuration of active components, updates, patches, security patches, fixes, bug fixes, etc.

1 lot Delivery: 45 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Certificate (Requested in ATC)

4

OEM Authorization Certificate

5

Additional Doc 1 (Requested in ATC)

6

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

3 Updates
#1

Update

24-Jan-2026
#2

Update

24-Jan-2026
#3

Update

24-Jan-2026

Extended Deadline

31-Jan-2026, 2:00 pm

Opening Date

31-Jan-2026, 2:30 pm