TenderDekho Logo
Active GEM

Government Tender Published for W90051801019,W90051801027,W97050102792,W97050102814,W97050102830,W97050102849,W97050102873,W9705070 in HARIDWAR, UTTARAKHAND

Bid Publish Date

04-Sep-2026, 4:14 pm

Bid End Date

14-Sep-2026, 6:00 pm

Progress

Issue04-Sep-2026, 4:14 pm
AwardPending

Bharat Heavy Electricals Limited (bhel) has released a public tender for W90051801019, W90051801027, W97050102792, W97050102814, W97050102830, W97050102849, W97050102873, W97050701386, W97050706353, W97050708496, W97050708640, W97050708658, W97050708666, W97050708674, W97050708682, W97050708690, W97050708704, W97050708712, W97050708720, W97050708739, W97050708747, W97050708755, W97050708763, W97050708771, W97050708780, W97050708798, W97050708801, W97051801147, W97051801155, W97051801210, W97051801228, W97051801236, W97051801244, W97051801252, W97051801260, W97051801279, W97051801287, W97051801295, W97051801309, W97051801317, W97051801325, W97051801333, W97051801341, W97051801350, W97051801368, W97051103113, W97050701033 in HARIDWAR, UTTARAKHAND. Quantity: 1420. Submission Deadline: 14-09-2026 18: 00: 00. Download documents and apply online.

Tender Data

Bid Details

Quantity

1420

Category

W90051801019

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

W90051801019 , W90051801027 , W97050102792 , W97050102814 , W97050102830 , W97050102849 , W97050102873 , W97050701386 , W97050706353 , W97050708496 , W97050708640 , W97050708658 , W97050708666 , W97050708674 , W97050708682 , W97050708690 , W97050708704 , W97050708712 , W97050708720 , W97050708739 , W97050708747 , W97050708755 , W97050708763 , W97050708771 , W97050708780 , W97050708798 , W97050708801 , W97051801147 , W97051801155 , W97051801210 , W97051801228 , W97051801236 , W97051801244 , W97051801252 , W97051801260 , W97051801279 , W97051801287 , W97051801295 , W97051801309 , W97051801317 , W97051801325 , W97051801333 , W97051801341 , W97051801350 , W97051801368 , W97051103113 , W97050701033

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Haridwar

Delivery Pincodes

249403

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Paras249403,Shipping Section, Central Plant Stores, HEEP, BHEL, Haridwar-249403 UttarakhandHaridwarUttarakhand2494032245-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9848002.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 47 Items Sign in for GEM prices

#1

W90051801019

CONNECTOR VG95328M16-26SN SIZE- P/N 810BA0813

22 nos Delivery: 45 days
#2

W90051801027

CONNECTOR VG95328M16-8PN SIZE- P/N 810BA1881

44 nos Delivery: 45 days
#3

W97050102792

ADAPTER 311FS001NF1405 OF GLEN AIR, OR, SCP311FS001NF1405 OF OF SPACECRAFT/EQV. ALTERNATE- BP1SRK14059NW OF AMPHENOL. SIZE- P/N 811AD0976

22 nos Delivery: 45 days
#4

W97050102814

ADAPTER 311FS001NF1407 OF GLEN AIR ALTERNATE-BP1SRK14079NW-14 OF AMPHENOL/ EQV SIZE- P/N 811AD1212

88 nos Delivery: 45 days
#5

W97050102830

ADAPTER 311FS001NF0803 OF GLENAIR, OR, BP1SRK08039NW-14 OF AMPHENOL, OR, SCP311FS001NF0803 OF SPACECRAFT OR EQUIVALENT SIZE- P/N 811AD0975

22 nos Delivery: 45 days
#6

W97050102849

ADAPTER 311FS001NF1406 OF GLENAIR, OR SCP311FS001NF1406 OF SPACECRAF T,OR, BP1SRK14069NW-14 OF AMPHENOL OR,CPF311W-1406 OF CPE ITALIA OR EQUIVALENT SIZE- P/N 811AD0962

33 nos Delivery: 45 days
#7

W97050102873

ADAPTER 311FS001NF1004E OF GLENAIR, OR, CPF311W-1004-SR OF CPE ITALIA , OR, BP1SRK10049CW-14 OF AMPHENOL OR EQUIVALENT SIZE- P/N 811AD0910

22 nos Delivery: 45 days
#8

W97050701386

CONNECTOR CA3106F10SL-3S-F80A9 5 OR MS3106EA10SL-3SC30 (OF AL LIED) OR MS4106F-10SL-3S-563 ( OF AMPHENOL)/EQ WITH THREADED COUPLING, CRIMP CONTACT(F80) A ND GOLD OVER SILVER PLATING ON CONTACTS (A95). SIZE- P/N 810VI0684

11 nos Delivery: 45 days
#9

W97050706353

CONNECTOR CA3106E10SL-4SK10- OR CA3106E10SL-4SF80A95- OR MS4106E-10SL-4S-563 OF AMPHENOL OR EQV. THREADED COUP LING .(K10-F80+A95- WHERE F80- CRIMP CONTACTS,A95- GOLD OVER SILVER PLATING ON CONTACTS. SIZE- P/N 810D02190

15 nos Delivery: 45 days
#10

W97050708496

DRG- P/N 810BA0854 REV-00 CONNECTOR,VG95328M14-19PW

11 nos Delivery: 45 days
#11

W97050708640

DRG- P/N 810BA0775 REV-00 CONNECTOR,VG95328D14-19SN

11 nos Delivery: 45 days
#12

W97050708658

DRG- P/N 810BA1210 REV-00 CONNECTOR, VG95328D16-26PW

11 nos Delivery: 45 days
#13

W97050708666

DRG- P/N 810BA3148 REV-00 CONNECTOR, MS3474W12-8PW

22 nos Delivery: 45 days
#14

W97050708674

DRG- P/N 810BA0846 REV-00 CONNECTOR, VG95328D14-19SW

11 nos Delivery: 45 days
#15

W97050708682

DRG- P/N 810BA3146 REV-00 CONNECTOR, MS3474W12-8P

22 nos Delivery: 45 days
#16

W97050708690

DRG- P/N 810BA2996 REV-00 CONNECTOR, MS3474W10-6S

44 nos Delivery: 45 days
#17

W97050708704

DRG- P/N 810BA0852 REV-00 CONNECTOR, VG95328D16-26PN

11 nos Delivery: 45 days
#18

W97050708712

DRG- P/N 810BA3046 REV-00 CONNECTOR, MS3474W10-6SW

44 nos Delivery: 45 days
#19

W97050708720

DRG- P/N 810BA0779 REV-00 CONNECTOR, VG95328D12-10SN

22 nos Delivery: 45 days
#20

W97050708739

DRG- P/N 810BA1224 REV-00 CONNECTOR, VG95328D20-41PX

11 nos Delivery: 45 days
#21

W97050708747

DRG- P/N 810BA0849 REV-00 CONNECTOR, VG95328D20-41PN

11 nos Delivery: 45 days
#22

W97050708755

DRG- P/N 810BA0645 REV-00 CONNECTOR, VG95234A-14S-6SN

44 nos Delivery: 45 days
#23

W97050708763

DRG- P/N 810BA1579 REV-00 CONNECTOR, VG95328C20-16PN

11 nos Delivery: 45 days
#24

W97050708771

DRG- P/N 810BA3303 REV-00 CONNECTOR, VG95328C16-8PN

11 nos Delivery: 45 days
#25

W97050708780

DRG- P/N 810BA1433 REV-00 CONNECTOR, VG95328C14-12SN

11 nos Delivery: 45 days
#26

W97050708798

DRG- P/N 810BA0647 REV-00 CONNECTOR, VG95328C12-10SN

44 nos Delivery: 45 days
#27

W97050708801

DRG- P/N 810BA0649 REV-00 CONNECTOR, VG95328C10-6SN

22 nos Delivery: 45 days
#28

W97051801147

CONNECTOR, VG95328M10-6SN N.STD-VG95328 SIZE- P/N 810BA0853

11 nos Delivery: 45 days
#29

W97051801155

CONNECTOR, VG95328C10-6PN N.STD-VG95328 SIZE- P/N 810BA0643

11 nos Delivery: 45 days
#30

W97051801210

CONNECTOR VG95328M12-10PN SIZE- P/N 810BA0809

66 nos Delivery: 45 days
#31

W97051801228

CONNECTOR VG95328M12-10SN SIZE- P/N 810BA0855

44 nos Delivery: 45 days
#32

W97051801236

FEMALE ANGLED CONNECTOR, CONTACTS- 4, 6.0-8.0MM, MODEL 99-1430-822-04 OF BINDER SIZE- P/N 810PP0295

231 nos Delivery: 45 days
#33

W97051801244

CONNECTOR VG95328T10-6SN SIZE- P/N 810BA1912

22 nos Delivery: 45 days
#34

W97051801252

CONNECTOR VG95328J10-6PN SIZE- P/N 810BA0648

22 nos Delivery: 45 days
#35

W97051801260

CONNECTOR VG95328M14-19SN SIZE- P/N 810BA0820

44 nos Delivery: 45 days
#36

W97051801279

FEMALE CABLE CONNECTOR, SHIELD ABLE, SCREW TERMINATION, MODEL 99-1430-812-04 OF BINDER, OR, 147557 OF DISTRIBUTORE DISTRELEC SIZE- P/N 810PP0288

110 nos Delivery: 45 days
#37

W97051801287

CONNECTOR VG95328M16-26SW SIZE- P/N 810BA1169

11 nos Delivery: 45 days
#38

W97051801295

CONNECTOR VG95328M20-41SX SIZE- P/N 810BA0818

11 nos Delivery: 45 days
#39

W97051801309

CONNECTOR VG95234M-14S-6PN SIZE- P/N 810BA0843

44 nos Delivery: 45 days
#40

W97051801317

CONNECTOR VG95234M-14S-6SN SIZE- P/N 810BA0607

44 nos Delivery: 45 days
#41

W97051801325

CONNECTOR VG95328M20-41SN SIZE- P/N 810BA0803

11 nos Delivery: 45 days
#42

W97051801333

CONNECTOR VG95328M14-19PN SIZE- P/N 810BA0633

11 nos Delivery: 45 days
#43

W97051801341

CONNECTOR VG95328M14-12PN SIZE- P/N 810BA1434

11 nos Delivery: 45 days
#44

W97051801350

CONNECTOR VG95328M10-6PN SIZE- P/N 810BA0891

22 nos Delivery: 45 days
#45

W97051801368

CONNECTOR VG95328M14-19PW SIZE- P/N 810BA0854

11 nos Delivery: 45 days
#46

W97051103113

COVER TYPE K-1988 OF KINGS- OR - 164-377 OF AMPHENOL/EQ. SIZE- PN 811TA0181

26 nos Delivery: 45 days
#47

W97050701033

CONNECTOR TYPE PSA.2E.675.CTLC85 OF LEMO N.STD-LEMO MAKE SIZE- P/N 810CO0057

4 nos Delivery: 45 days

Categories 9

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data