Bid Publish Date
01-Oct-2026, 10:22 am
Bid End Date
22-Oct-2026, 11:00 am
Location
Progress
Hindustan Aeronautics Limited in Nashik, Maharashtra invites bids for the procurement of a Hot Swaging Machine with Tube Swaging Tube Straightener. The scope includes supply, installation, testing, commissioning, and operator training with statutory clearances if any. Schedule 01 requires delivery within 9 months for the hot swaging unit; Schedule 02 requires 6 months for the straightening unit. A 5% PBG is mandated, valid through the warranty period, with a minimum 12-month warranty post-installation. HAL site acceptance is required after commissioning. Bidders must submit an Integrity Pact and technical compliance signed and stamped. This is a structured vendor engagement with at least 2 HAL personnel training.
Product: Hot Swaging Machine with Tube Swaging, and Tube Straightener
Delivery: 9 months (Hot Swaging), 6 months (Straightening) from contract placement
Warranty: minimum 12 months post-installation and acceptance
PBG: 5% of contract value (excluding GST) valid through warranty period (14 months from PBG date)
Installation/Commissioning: by vendor within 30 days of machine receipt at HAL site
Training: 2 HAL personnel on operation and maintenance
EMD/Performance: 5% PBG of contract value, validity through warranty
Delivery: 9 months for hot swaging, 6 months for straightening
Documentation: Integrity Pact and signed technical compliance required
GST payable by bidder; reimbursement as actuals or lowest applicable rate; payments aligned to acceptance and statutory clearances
9 months for hot swaging unit; 6 months for straightening unit from GeM contract placement
Liquidated damages applicable for delays; PBG remains in force through warranty
Experience in supplying industrial machinery and installation at government/defense sites
GST registration and valid PAN
Financial stability documentation and capability to furnish 5% PBG
Quantity
2
Category
HOT SWAGGING MACHINE WITH TUBE
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
Yes
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Warranty Period
12 months
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
HOT SWAGGING MACHINE WITH TUBE , SWAGING TUBE STRAIGHTNER
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
14
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
270
Delivery Locations
1
Delivery Cities
NASHIK RURAL
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | NASHIK RURAL | NASHIK RURAL | - | - | 1 | 270 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by bank
Technical compliance certificates (signed & stamped)
Integrity Pact (signed)
OEM authorization (if applicable)
Experience certificates (relevant projects)
Vendor Code Creation documents
Key insights about MAHARASHTRA tender market
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, signed integrity pact, OEM authorizations if applicable, and technical compliance certificates. Also include experience certificates and financials to support eligibility; without these, bids may be rejected at evaluation.
Delivery for the hot swaging unit is within 9 months of contract placement, while the tube straightening unit must be delivered within 6 months. The installation occurs within 30 days of receipt at HAL site, with commissioning following to complete acceptance.
A minimum 12-month warranty from installation/acceptance date applies. A 5% PBG of contract value (excluding GST) must be provided and remain valid through the warranty period (14 months from PBG date), ensuring performance and compliance with specifications.
Equipment must meet the attached technical specifications: hot swaging and tube straightening capabilities; vendor to provide signed compliance with ATC drawings; installation and testing to HAL standards; operator training for 2 HAL personnel; ISI/ISO certifications if specified in ATC.
Payments follow HAL terms after acceptance and clearance of installation. GST is reimbursed as actuals or at the lower of quoted rates; ensure EFT mandate is active and verification of bank details is complete for timely payments.
Submit the signed Integrity Pact as per the ATC attachment point. This ensures compliance with ethical bidding standards and helps secure award fairness. Non-submission may lead to bid rejection by HAL procurement.
Scope includes supply, installation, testing, commissioning, operator training, and providing any statutory clearances required. The cost must cover all components, with the PBG, warranty, and post-installation support as per HAL terms and ATC.
The ATC requires signed compliance to attached technical specifications; OEM authorizations may be needed if specified in the bidding ATC. Ensure any brand-specific requirements are met to avoid disqualification during technical evaluation.