Damodar Valley Corporation Corrosion Mapping of Water-Wall Tubes MTPS Unit 7 RFET 500MW 2025
Damodar Valley Corporation
BANKURA, WEST BENGAL
Bid Publish Date
11-Feb-2026, 8:11 am
Bid End Date
21-Feb-2026, 9:00 am
Value
₹4,76,957
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
The Damodar Valley Corporation invites bids for an in situ oxide scale measurement service in reheater and superheater tubes of MTPS units 1 to 6, to be executed in any three units. The project scope centers on precise oxide scale assessment within boiler tubes, with an estimated contract value around ₹4.77 Lakh (excluding GST). The contract term spans 540 days from commencement, with a rapid completion window of 15 days after start. This procurement uses an open GeM reverse e-auction framework and requires a firm price during the contract. A formal LOA/PO will trigger agreement signing within 7 days, with performance security as applicable. The tender emphasizes structured payment on completion milestones and strict acceptance by DVC engineers, ensuring formal RA bill certification before disbursement of the 95% payment and the residual 5% upon contract completion. Unique elements include the requirement to select any three MTPS units and adhere to DVC’s standard agreement process.
In situ oxide scale measurement service for MTPS boiler tubes (reheater & superheater)
Scope limited to any three MTPS units among units 1–6
Contract value around ₹476,957.25 (GST not included)
Contract duration 540 days; completion window 15 days from commencement
Payment terms: 95% on RA bill after certification; 5% on contract completion
Award through GeM reverse auction; price remains firm
Documentation: LOA/PO and DVC agreement; SDBG acceptance required for payment
Technical capability to measure oxide scale in-situ with documented methodology
EMD or security deposit as applicable per contract
Firm price for entire contract duration with GST handling per GeM terms
Completion within 15 days from start; overall project 540 days
Agreement signing within 7 days of LOA/PO; acceptance by DVC engineer
95% payment on completed portion after RA bill certification; 5% on contract completion; no payment without SDBG and signed agreement
Work commencement date tied to LOA/PO; completion window of 15 days from start; overall contract period 540 days
Not specified in data; governed by standard DVC terms and GeM policies; ensure compliance to avoid penalties
Experience in boiler-turnkey/oxide-scale measurement or similar NDE/boiler inspection projects
Financial stability evidenced by recent financial statements
GST registration and PAN as per government procurement norms
Capability to operate within GeM reverse auction framework and GeM terms
Main Document
OTHER
SCOPE_OF_WORK
PAYMENT
BOQ
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Damodar Valley Corporation
BANKURA, WEST BENGAL
Ntpc Limited
KORBA, CHHATTISGARH
Ntpc Limited
REWA, MADHYA PRADESH
Ntpc Limited
NAGPUR, MAHARASHTRA
Ntpc Limited
VISAKHAPATNAM, ANDHRA PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for oxide scale measurement or similar boiler-turnkey tasks
Financial statements demonstrating capacity to undertake contract
EMD/Security deposit documents as applicable
Technical bid documents demonstrating method/approach for in situ oxide scale measurement
OEM authorizations or vendor approvals if applicable
Agreement format acceptance and signed LOA/PO documents
Key insights about WEST BENGAL tender market
Bidders must register on GeM, submit technical and financial bids, and comply with DVC terms including firm pricing and GeM terms. Ensure experience in oxide-scale measurement, provide GST, PAN, financials, EMD as applicable, and accept LOA/PO with agreement within 7 days.
Required documents include GST registration, PAN, experience certificates in boiler inspection, financial statements, EMD/security deposit, technical approach for in situ measurement, OEM authorizations if applicable, and signed LOA/PO agreement. Ensure triplicate RA bill readiness for payment certification.
Payment releases 95% on satisfactory completion with RA bill certified by DVC Engineer-in-Charge and submission of complete bills; remaining 5% upon final contract completion. Agreement and SDBG acceptance are prerequisites for payment processing.
The overall contract duration is 540 days from commencement, with a mandatory completion window of 15 days from start of work. Projects must be completed in any three MTPS units among units 1–6.
The scope includes in situ oxide-scale measurement in any three units out of MTPS units 1 to 6. Selection of units is at the bidder’s proposal and DVC approval.
While not explicitly listed, bidders should demonstrate prior boiler-tube inspection experience, provide OEM authorizations if applicable, and comply with GST/PAN norms, with satisfactory RA bill certification and adherence to GeM terms for payment and contract execution.
Inquiries should be directed to the designated DVC officers: Archana Lakra (Senior Manager, C&I) and Sukanti Mahanta (Dy. Manager, M). Use the official emails provided to request clarifications before the bid submission deadline.
After bid acceptance, the LOA/PO and agreement will be issued, and bidders must sign within 7 days. Agreement signing is prerequisite for security deposits and release of payments per contract terms.
Nlc India Limited
📍 BIKANER, RAJASTHAN
Damodar Valley Corporation
📍 BANKURA, WEST BENGAL
Sign up now to access all documents
Main Document
OTHER
SCOPE_OF_WORK
PAYMENT
BOQ
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS