TenderDekho Logo
Closed GEM

Indian Army Mild Steel Wire & Tubular Street Light Poles Tender East Sikkim 2025 IS 280 Q2

Bid Publish Date

10-Dec-2025, 7:26 pm

Bid End Date

23-Dec-2025, 7:00 pm

Generate Docs

Progress

Issue10-Dec-2025, 7:26 pm
Corrigendum20-Dec-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

110

Category

Mild Steel Wire for General Engineering Purpose as per IS 280

Bid Type

Two Packet Bid

Key Highlights

  • IS 280 (Q2) compliance for mild steel wire and IS tubular street light poles (V2) Q3 category
  • Option clause allows ±25% quantity change with delivery-time recalculation (min 30 days)
  • GST reimbursement terms: actuals or quoted rate, whichever is lower
  • Pre-shipment inspection by a nominated agency for stored goods
  • Supply-only scope; no installation or commissioning terms specified
  • Non-disclosure: termination rights for misrepresentation or delivery failure
  • GST invoice upload and GST portal payment screenshot required during bid submission
  • No BOQ items published; emphasis on material supply and compliance

Categories 5

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for the supply of Mild Steel Wire for General Engineering Purpose as per IS 280 (Q2) and Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) in East Sikkim, 737101. The bid scope is for the supply of Goods with a flexible quantity option of up to 25% more or less during contract execution. GST implications are bidder-determined with reimbursement as actuals or up to the quoted rate. Inspection is to be conducted by a nominated agency prior to stores release. The tender emphasizes compliance with delivery and contractual performance through standard GeM-like terms. Unique features include the option clause and a delivery mechanism tied to the last delivery order date. This procurement targets government-backed infrastructure hardware for general engineering and street lighting applications.

Technical Specifications & Requirements

  • Scope of supply: Only supply of Goods as per terms; no service components indicated.
  • Standard/spec reference: IS 280 (Q2) for mild steel wire and Tubular Street Light Poles (V2) (Q3) category; exact performance criteria not published.
  • Option clause: Purchaser may adjust quantity ±25% at contract rates; additional time formula: (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days.
  • GST: Bidder to determine GST; reimbursement up to actuals or at quoted rate, whichever is lower.
  • Inspection: Nominated Inspection Agency to conduct pre-ship inspection on behalf of buyer.
  • Delivery terms: Delivery period linked to last date of original delivery order; extension mechanics apply as above.
  • Risk & termination: Buyer may terminate for non-compliance, delays, misrepresentation, bankruptcy, or liquidation.
  • Scope note: No BOQ lines available; tender focuses on supply, not installation.
  • Documentation flow: GST invoice upload and GST portal payment screenshot required on GeM portal.

Terms, Conditions & Eligibility

  • GST obligation: Bidder to verify GST; reimbursement as actuals or at quoted rate.
  • Financial health: Bidders must not be in liquidation or bankruptcy; an undertaking is required.
  • Delivery risk: Failure to meet delivery or replacement of rejected items may trigger contract termination.
  • Option terms: Quantity adjustments up to 25% allowed during and after original delivery period.
  • Payment & invoicing: GST invoice must be uploaded; payment processing terms align with buyer’s standard practices.
  • Procurement scope: Supply-only contract; inspection by nominated agency prior to acceptance.
  • Documentation readiness: Typical documents include GST, PAN, experience certificates, financial statements, EMD-related documents, and OEM authorizations where applicable.

Key Specifications

  • Product category: Mild Steel Wire for General Engineering (IS 280 Q2) and Tubular Street Light Poles (V2 Q3)

  • Scope: Supply of Goods only (no installation services)

  • Delivery: Based on last date of original delivery order with option-based extensions

  • Inspection: Pre-shipment inspection by nominated agency

  • GST: Bidder to determine applicability; reimbursement capped at actuals or quoted rate

Terms & Conditions

  • Option Clause allows ±25% quantity adjustments during contract term

  • GST responsibility lies with bidder; reimbursement mechanism defined

  • Pre-shipment inspection by a nominated agency; supply-only contract

Important Clauses

Payment Terms

GST invoice must be uploaded on GeM; payment terms align with buyer norms; reimbursement of GST per actuals or quoted rate

Delivery Schedule

Delivery period begins from the last date of the original delivery order; additional time for increased quantity follows the specified formula with a minimum of 30 days

Penalties/Liquidated Damages

Contract may be terminated for non-delivery, misrepresentation, or failure to replace defective goods; penalties implied by contract terms

Bidder Eligibility

  • Not under liquidation, receivership, or similar proceedings

  • Not bankrupt; bidder must upload an undertaking declaring financial stability

  • Must meet supply capability for IS 280 Q2 and IS tubular street poles Q3 categories

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Mild Steel Wire for General Engineering Purpose as per IS 280 (Q2) , Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3)

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-8635428.pdf

Main Document

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates demonstrating relevant supply of similar hardware

4

Financial statements (audited if available)

5

EMD-related documents or declared no-EMD if applicable

6

Technical bid documents (compliance statements to IS standards)

7

OEM authorization letters (where applicable)

Corrigendum Updates

1 Update
#1

Update

20-Dec-2025

Extended Deadline

23-Dec-2025, 7:00 pm

Opening Date

23-Dec-2025, 7:30 pm

Frequently Asked Questions

Key insights about SIKKIM tender market

How to bid for IS 280 Q2 mild steel wire tender in East Sikkim?

Bidders should ensure IS 280 Q2 compliance and provide required documents: GST, PAN, experience certificates, financials, OEM authorizations, and pre-shipment inspection capability. The bid must include GST details, an undertaking on financial health, and adherence to the 25% quantity option during contract execution.

What documents are needed for Indian Army street light poles tender 2025?

Prepare GST registration, PAN, company financial statements, experience certificates for similar hardware supply, OEM authorizations if applicable, and GST invoice documentation for post-bid submission. Include any pre-shipment inspection readiness certifications as required by the buyer.

What are the delivery terms for the East Sikkim steel supply bid?

Delivery starts from the last date of the original delivery order. If quantity increases, apply the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days; the purchaser may extend further up to the original delivery period.

What standards must be met for the wire and poles in this tender?

Standards specified include IS 280 for mild steel wire (Q2) and IS tubular street light poles (V2) (Q3). Exact performance specs are not listed in the data, so bidders must demonstrate compliance to these standards and provide relevant certification or test reports during bid submission.

How is GST handled in this GeM-style Army tender?

Bidders must determine applicable GST; reimbursements are on actuals or the lower of the quoted GST rate. Ensure GST invoices and portal screenshots are uploaded when generating the GeM invoice for payment processing.

What is the scope of supply for this procurement?

Scope is strictly supply of goods; no installation or commissioning services are included. Pre-shipment inspection will be conducted by a nominated agency prior to store release, ensuring conformity with the IS standards referenced.

What are the termination grounds for this supply contract?

The buyer may terminate for non-compliance with material terms, failure to deliver or replace defective goods, financial insolvency, or misrepresentation. The contract also reserves rights to adjust quantities by up to 25% and extend delivery timelines accordingly.

What is the exact eligibility criteria for this Army tender in 2025?

Eligibility includes: financial stability (no liquidation), capability to supply IS 280 Q2 compliant mild steel wire and IS tubular poles Q3, and compliance with pre-shipment inspection. Provide experience certificates, GST and PAN details, and OEM authorizations where required.