A tender has been published for N/a GPS Tracking System (Q3) in North Goa, GOA. Quantity: 237 by. Submission Deadline: 07-11-2025 13: 00: 00. Check eligibility and apply.
   
Categories
 3  
     
Technical Specifications
 1 Item  
 Item #1 Details
View Catalog| Category | Specification | Requirement | 
|---|---|---|
| GPS Specification | Type Of Modem | Multi Band GPRS Modem | 
| GPS Specification | Multi Band GPRS Modem Frequency (MHz) | 2700 Or higher | 
| GPS Specification | Acquisition Channels (Minimum) | 100 Or higher | 
| GPS Specification | Horizontal Position Accuracy (meter) | 1 Or lower | 
| GPS Specification | Compatible Satellite-based Augmentation System (SBAS) | Wide Area Augmentation System (WAAS), European Geostationary Navigation Overlay Service (EGNOS), MTSAT Satellite Augmentation System (MSAS), GPS-aided GEO Augmented Aavigation (GAGAN) | 
| General | The tracking system has built-in GPS combining with advanced AGPS called EASY (Embedded Assist System) and proven "always Locate Technology" | In Compliance | 
| Hardware Specification | RS 232 port for RFID Card Reader | Yes | 
| Hardware Specification | Battery Backup (minimum) | 10 Or higher | 
| Hardware Specification | Maximum Power (Sleep Mode) | 12.0 Or lower | 
| Certification | Other Certifications available | UL, CE, FCC | 
| Software Feature | Alert/Notification facility | Yes | 
| Software Feature | Alert/Notification method | Server Based and SMS Both | 
| Software Feature | Availability of Data Backup for 365 days | Yes | 
| Software Feature | S/W is capable to download/upload the data of previous year | Yes | 
| Software Feature | uptime of Server to be more than 90% | Yes | 
| Software Feature | Uptime of the application to be more than 99% | Yes | 
| IP Rights | Product Design and Firmware IP Rights - Owned by the OEM | Yes | 
| IP Rights | Software Solution Code IP Rights - Owned by the OEM | Yes | 
| Warranty | Warranty | 3 Or higher | 
AI-Powered Bidder Prediction
Companies most likely to bid
Unlock Bidder Insights
AI predictions on likely bidders
Required Documents
1
Experience Criteria
2
Bidder Turnover
3
Certificate (Requested in ATC)
4
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria
5
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Download FREE!
Access all tender documents at no cost
    Documents  3  
 GeM-Bidding-8502781.pdf
Main Document
CATALOG-Specification-1
CATALOG Specification
GEM General Terms and Conditions Document
GEM_GENERAL_TERMS_AND_CONDITIONS
GeM-Bidding-8502781.pdf
Main Document
CATALOG-Specification-1
CATALOG Specification
GEM General Terms and Conditions Document
GEM_GENERAL_TERMS_AND_CONDITIONS
