Progress
Bokaro Steel Plant of the Steel Authority of India Limited invites bids for repair, maintenance, and installation of plant systems/equipment related to the Steel Melting Shop (SMS) – Basic Oxygen Furnace (BOF). The procurement value is ₹12,999,647.91 with location in BOKARO, JHARKHAND (825102). The scope centers on various repair and installation services for SMS-BOF components, as indicated by the tender category, and relies on the attached SOW and ATC documents for exact task definitions. No BOQ items are listed in the visible data, signaling a potentially project-based or scope-defined engagement and reliance on bidder-provided methodologies. A unique aspect is the formal linkage to the SMS-BOF ecosystem within SAIL’s steel production framework, requiring specialized technical capability.
Product/service: Repair, maintenance and installation for SMS-BOF related plant systems
Estimated value: ₹12,999,647.91
Location: Bokaro, Jharkhand
No BOQ items available in current extract; relies on SOW/ATC
Specialized capability in steelmaking equipment maintenance
EMD amount and mode to be confirmed in ATC
Delivery timelines governed by SOW/ATC; not specified in extract
Payment terms and warranty/penalties to be detailed in ATC
To be specified in ATC; verify advance/milestone payments and payment timeline
Not disclosed here; refer to SOW/ATC for target dates and milestones
Not provided in extract; confirm LD/penalties in ATC and contract
Experience in SMS-BOF repair/maintenance within a steel plant
Demonstrated capability to handle high-temperature metallurgical equipment
Financial stability evidenced by prior statements or statements of turnover
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Tech Clarification Time
7 Days
EMD Required
No
MII Compliance
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
1652
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Steel Melting Shop(SMS)-Basic Oxygen Furnace; Buyer
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Bokaro
Delivery Pincodes
827001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Rajendra Kumar | 827001,SMS2 & CCS WELFARE BUILDING BOKARO STEEL PLANT ( SAIL ) | Bokaro | Jharkhand | 827001 | Project / Lumpsum Based | - | Estimated Cost of Spare/Consumable s/Items on Reimbursement basis in Rs (please input 0 if not applicable) : 0 |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates in SMS-BOF maintenance
Financial statements or auditor’s report for last 3 years
EMD documentation (as per ATC), payment proof
Technical bid documents and compliance certificates (as applicable)
OEM authorizations or certifications for BOF/related equipment (if required by ATC)
Any additional documents specified in the ATC or SOW
Key insights about JHARKHAND tender market
Bidders must submit GST, PAN, experience certificates, and financials along with technical compliance. The ATC/SOW define the scope for SMS-BOF repair; ensure your bid aligns with those documents and includes EMD as specified there. Review delivery terms, payment terms, and warranty requirements in the ATC.
Required documents include GST registration, PAN, last 3 years’ financial statements, experience certificates for steel plant maintenance, EMD proofs, technical bid and OEM authorizations if demanded by the ATC. Ensure all documents match the tender’s ATC/SOW references.
Technical requirements are defined in the SOW/ATC attached to the tender. They likely cover maintenance capabilities for BOF components, safety standards, and equipment compatibility. Confirm required certifications, equipment lists, and service methodologies within the ATC documentation.
The exact delivery schedule is not in the extract; refer to the ATC/SOW for milestones and expected timelines. Prepare a project plan showing phased maintenance, parts replacement, and risk mitigation aligned to SAIL standards.
EMD details are not disclosed here. Check the ATC for the specific amount, payment method, and validity period. Prepare your EMD submission as specified to avoid disqualification.
Cross-check the ATC/SOW for required standards, which may include safety and quality norms. Ensure your team holds relevant certifications and that equipment used meets the specified standards before submission.
Scope is outlined in the attached SOW. It likely includes repair, preventive maintenance, inspections, and installation support for SMS-BOF components within Bokaro’s steel plant environment; confirm exact components and service levels in the SOW.
Eligibility requires proven experience in steel plant maintenance, financial stability demonstrated by prior statements, GST and PAN registrations, and adherence to OEM/ATC-specified compliance; ensure your organization can meet the technical and financial prerequisites.